220508-R001(B) Engineering and Services Report (OPW) · OPW23/0179
5 clearance envelopes). Noting the requirements of Condition 30, Table 9.4.1.4 of the Planning Scheme Parking Code only requires 3 carparks for this development, the provision of 5 compliant carparks exceeds the minimum requirement and is considered a good outcome for future users of the development. A driveway longitudinal section has been provided and demonstrate the driveway grades meet the requirements of AS2890.1 Section 2.6. Grade changes and transitions have been modelled also to demonstrate that there is sufficient vertical clearance for vehicles to enter site and the basement. A ground conflict report has been produced by the software to analyse the tracking of vehicles over the design surface and shows that a B85 vehicle maintains clearance to the driveway surface at all times. Minimum headroom as per AS2890.1 Section 5.3 is also demonstrated. Works within the easement are as per previous drawing issues and require minimal works within the adjoining lot, limited to extending the concrete pavement to connect the existing surface with the subject site. The existing infrastructure in the adjoining lot does not require extensive modification to facilitate access to the proposed development. 2.2 Pedestrian Access and External Works The site is serviced by existing Council concrete footpaths across the Gympie Tce frontage and within Council land adjacent to the northern boundary. The proposed works includes pedestrian access to the existing path at the northern boundary, and construction of a new 2.0m wide concrete footpath along the frontage of Gympie Terrace as per Condition 27 and 28. The Engineering Drawings refer to Council Standard Drawing RS-065 for footpath construction details. 3.0 EARTHWORKS 3.1 Cut and Fill Operations Earthworks will be required to deliver the proposed development and includes excavation for the basement and installation of fill to achieve the design finished surface levels. The Engineering Drawings include cross sections at key locations to demonstrate the depth of excavation and filling as well as an earthworks map showing the extent and depth of earthworks/filling across the site. 3.2 Basement Excavation The basement extents are shown on Engineering Drawings and require excavation below the existing surface. The depth of excavation is less than 2.5m and will generate approximately 550m3 of spoil to be taken off site. A Geotechnical Investigation and Report has been prepared by Pacific Geotech and can be found in Appendix B. The report addresses the requirements of Conditions 39 and 40, and informs the structural design. Structural Engineering drawings have been prepared by SCG Consulting Engineers and can be found in Appendix C. These drawings detail retaining wall structural details within the permanent works and provide a concept design for a contiguous pile temporary retaining wall to enable the excavation of the basement. The final design and implementation of the temporary works will be the responsibility of the construction contractor. A detailed Groundwater and Acid Sulphate Soils Management Plan has been prepared by ADG Consulting and can be found in Appendix D. The report addresses the requirements of Condition 32 specifically as well as other general development compliance outcomes.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
220508-R001(B) Engineering and Services Report (OPW).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.