Council archive · source document
OPW15/0148 - Vegetation Application
REHABILITATION SCHEDULE
WEED ERADICATION, ENDEMIC REGENERATION & REVEGETATION
PROTECTIVE MEASURES INDIGENOUS REVEGETATION
* PROTECTIVE MEASURES SHOULD BE TAKEN TO ENSURE THE INTEGRITY OF EXISTING VEGETATION, RETAIN * ALL NATURALLY OCCURING LOCAL PLANT SPECIES TO BE PROMOTED IN CONJUNCTION WITH PROPOSED
SELECT VEGETATION WHERE POSSIBLE AND PROVIDE A STABLE ENVIRONMENT FOR NEWLY PLANTED REVEGETATION SPECIES.
VEGETATION. * INDIGENOUS PLANT SPECIES TO BE LOCALLY SOURCED AND PLANTED IN ACCORDANCE WITH LOCAL
LANDCARE AND CATCHMENT CARE GROUP QUIDELINES.
WEED SPECIES IDENTIFICATION.
TUBESTOCK PLANTING PROCEDURE
NON-LOCAL NATIVE FLORA WEED SPECIES AND EXOTIC FLORA ARE TO BE IDENTIFIED BY A SUITABLY * WATER TUBE STOCK PRIOR TO PLANTING.
QUALIFIED CONSULTANT. * SPREAD MULCH AWAY FROM PLANTING HOLE TO BE DUG.
ATTENTION IS REQUIRED FOR THE DETECTION OF - * EACH HOLE TO BE DUG AT LEAST TWICE THE SIZE OF THE POT TO BE PLANTED.
* WEED GRASSES, ENVIRONMENTAL WEEDS AND SPECIES WITH RESTRICTIONS - MAROOCHY SHIRE COUNCIL. * BREAK UP PREPARED HOLE WALLS IF GLAZED AND BASE IF COMPACTED.
* DECLARED PLANTS (LAND PROTECTION (PEST AND STOCK ROUTE MANAGEMENT) ACT 2002 (QLD)) * ADD WATER TO HOLE IF DRY.
*UNDESIRABLE PLANTS AND LIST OF NATURALISED PLANTS IN SOUTH EAST QUEENSLAND * REMOVE TUBE FROM CONTAINER AND PLACE IN HOLE, POTTING MIX TO BE 25mm BELOW GROUND
(BATIANOFF & BUTLER, 2001, QUEENSLAND HERBARIUM) LEVEL AFTER BACKFILLING AND PRESSING GENTLY TO SECURE.
* ADD ORGANIC MIX SOIL TO HOLE IF EXISTING GROUND IS DEFICIENT.
WEED CONTROL METHODS.
* CREATE A SMALL DAM AROUND TUBE WITH EXCESS SOIL TO HOLD WATER.
TREATMENT OF WEEDS IS TO BE UNDERTAKEN USING BEST HORTICULTURAL PRACTICES. * REPLACE MUCH AROUND TUBE (OR MULCH MAT) MAINTAINING CLEAR ZONE 40mm FROM STEM.
WEED TREATMENT METHOD MUST PROVIDE PROTECTION FOR EXISTING NATIVE VEGETATION AND REQUIRED *WATER IN NEW PLANTINGS - THREE TIMES IN FIRST WEEK / TWO TIMES IN SECOND WEEK / ONCE IN
REHABILITATION VEGETATION. AVOID POSSIBLE SOIL DISTURBANCE WHICH INCREASES RISK OF EROSION THIRD WEEK. (ADJUST WATERING WITH RAINFALL)
AND ADDITIONAL WEED INFESTATION. * MONITOR PLANT PROGRESS AFTER THIRD WEEK - DEEP WATER AS REQUIRED.
USE ONLY PESTICIDES APPROVED FOR TARGET USE. CHEMICAL MANUFACTURERS INSTRUCTIONS FOR USE * USE WATER SAVING CRYSTALS OR SIMILAR IN DRY SOIL CONDITIONS.
OF PESTICIDE ARE TO BE FOLLOWED.
ALL NOXIOUS WEED SEED OR PROPAGATIVE MATERIAL SHOULD BE REMOVED FROM SITE AND DISPOSED OF
AT A APPROVED COUNCIL WASTE STATION. BIORETENTION MAINTENANCE
WEEDS ARE TO BE CONTROLLED DURING THE CONSTRUCTION AND 'ON MAINTENANCE' PHASE OF WORKS. * ROUTINE INSPECTION OF THE BIORETENTION PROFILE TO IDENTIFY ANY AREAS OF INCREASED
SEDIMENT DEPOSITION, SCOURING FROM STORM FLOWS, RILL EROSION OF THE BATTERS FROM
MULCHING IS TO FORM PART OF THE WEED MANAGEMENT STRATEGY. MULCH DEPTH TO BE APPROX. 100 - LATERAL INFLOWS, DAMAGE TO THE PROFILE FROM VEHICLES AND CLOGGING OF THE
150mm DEEP. MULCH TYPE TO BE FOREST MULCH OR CANE MULCH OR APPROVED SIMILAR. MULCH TO BE
BIORETENTION BASIN.
FREE FROM WEED MATERIAL AND FOREIGN DEBRIS. COUNCIL REFUSE MULCH IS NOT ACCEPTABLE. MULCH
JUTE MATS TO BE USED IN LOW AREAS ADJACENT WATERWAYS WITH RISK OF WASH.
* ROUTINE INSPECTION OF INFLOW SYSTEMS, OVERFLOW PITS AND UNDER-DRAINS TO IDENTIFY
AND CLEAN ANY AREAS OF SCOUR, LITTER BUILD UP AND BLOCKAGES.
FOR FURTHER WEED TREATMENT INFORMATION REFER TO: * REMOVAL OF SEDIMENT WHERE IT IS SMOTHERING THE BIORETENTION BASIN VEGETATION.
QUEENSLAND DEPARTMENT OF NATURAL RESOURCES AND MINES - PEST FACTS. www.nrm.qld.gov.au/pests/ * TILLING OF THE BIORETENTION BASIN SURFACE IF THERE IS EVIDENCE OF CLOGGING.
* REGULAR WATERING / IRRIGATION OF VEGETATION UNTIL PLANTS ARE ESTABLISHED AND
ACTIVELY GROWING.
EROSION CONTROL * REMOVAL AND MANAGEMENT OF INVASIVE WEEDS (HERBICIDES SHOULD NOT BE USED)
EROSION CONTROL METHODS ARE TO BE IN GENERAL ACCORDANCE WITH 'SOIL EROSION & SEDIMENT * REMOVAL OF PLANTS THAT HAVE DIED AND REPLACEMENT WITH PLANTS OF EQUIVALENT SIZE
CONTROL' - ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES - JUNE 1996' AND SPECIESAS DETAILED IN THE PLANT SCHEDULE.
METHODS WILL INCLUDE SEDIMENT FENCING TO BE INSTALLED GENERALLY ALONG CONTOUR AS REQUIRED.
* PRUNING TO REMOVE DEAD OR DISEASED VEGETATION MATERIAL AND TO STIMULATE GROWTH.
EROSION CONTROL JUTE MATTING (SECURELY PINNED & APPROPRIATELY OVERLAPPED) WILL BE INSTALLED
TO MANUFACTURERS INSTRUCTIONS THROUGHOUT INTERNAL BATTERS OF BIO-RETENTION BASIN.
JUTEMAT OR OTHER EROSION CONTROL MATTING SHALL ALSO BE USED BENEATH ANY DRY ROCK WORK.
BLANKET MULCHING THE BALANCE OF THE REVEGETATION AREA TO REQUIRED DEPTH WILL FOLLOW
EARTHWORKS AS SOON AS PRACTICAL.
BIO-RETENTION SPECIES LIST
Zone Species Common Name Height Form Planting
Density
BIO-RETENTION PLANTING RATIONALE
THE BIO-RETENTION FILTER'S PRIMARY FUNCTION IS FOR WATER QUALITY TREATMENT.
IT IS AN AREA WHICH WILL BE PERIODICALLY INUNDATED WITH WATER AND PERMANENTLY OR PERIODICALLY SUPPORT THE GROWTH OF MACROPHYTE
SPECIES.
IT SHOULD BE DESIGNED, OPERATED AND MAINTAINED AS A SUSTAINABLE FACILITY TO PROVIDE THE DESIRED LEVEL OF STORMWATER TREATMENT.
CORRECT DESIGN, CONSTRUCTION AND MAINTENANCE OF THE FACILITY WILL ENSURE THAT DISCHARGES ARE OF SUCH QUALITY THAT ENVIRONMENTAL
VALUES OF DOWNSTREAM RECEIVING WATERS ARE PROTECTED OR ENHANCED.
THE CORRECT SELECTION AND LOCATION OF MACROPHYTE SPECIES WITHIN THE BASIN WILL ENSURE HEALTHY GROWTH AND DOWNSTREAM WATER
QUALITY.
AMENDMENTS
PROJECT
PROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA
issue
A
date description
23.04.08 ISSUE FOR APPROVAL
element design
landscape architecture
CLIENT
DWG TITLE
LANDSCAPE PLAN - SHEET 04 OPERATIONAL WORKS GATEWAY RISE PTY LTD MASTER PLANNING SUBDIVISIONS
COMMERCIAL DEVELOPMENTS RESORTS
C COPYRIGHT 2007 ELEMENT DESIGN QLD PTY LTD PARKLANDS REVEGETATION MULTI-UNITS
PLANTING CONTEXT SERVICES Copyright in the whole and every part of this document belongs to Date 10 APRIL 08
ELEMENT DESIGN QLD PTY LTD and may not be used, sold, 151 Brisbane Rd. Mooloolaba
STREET TREE PLANTINGS transferred, copied or reproduced in whole or in part in any manner or Phone 07 5444 6155 Fax 07 5444 6055 Scale 1:200 @ A1
TURF TO FOOTPATH STORMWATER LINE SEWER LINE ELECTRICAL RETICULATION form or in or on any media to any person without the prior written
As located on plan PO Box 1546, Buderim QLD 4556
consent of ELEMENT DESIGN QLD PTY LTD. Design JS Drawn JS
[email protected]
Sheet 4 OF 4
FEATURE ENTRY TREES WATER LINE EXISTING SEWER
200 Litre
ED 7197 OPW - 04 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0148 - Vegetation ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 8.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.