Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

OPW15/0148 - Vegetation Application

of 22

Text shows just the words. Original shows the document exactly as it was published.

                                                                                          REHABILITATION SCHEDULE
                                                                                          WEED ERADICATION, ENDEMIC REGENERATION & REVEGETATION



                                                                                         PROTECTIVE MEASURES                                                                                                                                                                        INDIGENOUS REVEGETATION
                                                                                         * PROTECTIVE MEASURES SHOULD BE TAKEN TO ENSURE THE INTEGRITY OF EXISTING VEGETATION, RETAIN                                                                                               * ALL NATURALLY OCCURING LOCAL PLANT SPECIES TO BE PROMOTED IN CONJUNCTION WITH PROPOSED
                                                                                         SELECT VEGETATION WHERE POSSIBLE AND PROVIDE A STABLE ENVIRONMENT FOR NEWLY PLANTED                                                                                                        REVEGETATION SPECIES.
                                                                                         VEGETATION.                                                                                                                                                                                * INDIGENOUS PLANT SPECIES TO BE LOCALLY SOURCED AND PLANTED IN ACCORDANCE WITH LOCAL
                                                                                                                                                                                                                                                                                    LANDCARE AND CATCHMENT CARE GROUP QUIDELINES.
                                                                                         WEED SPECIES IDENTIFICATION.
                                                                                                                                                                                                                                                                                   TUBESTOCK PLANTING PROCEDURE
                                                                                         NON-LOCAL NATIVE FLORA WEED SPECIES AND EXOTIC FLORA ARE TO BE IDENTIFIED BY A SUITABLY                                                                                                   * WATER TUBE STOCK PRIOR TO PLANTING.
                                                                                         QUALIFIED CONSULTANT.                                                                                                                                                                     * SPREAD MULCH AWAY FROM PLANTING HOLE TO BE DUG.
                                                                                         ATTENTION IS REQUIRED FOR THE DETECTION OF -                                                                                                                                              * EACH HOLE TO BE DUG AT LEAST TWICE THE SIZE OF THE POT TO BE PLANTED.
                                                                                         * WEED GRASSES, ENVIRONMENTAL WEEDS AND SPECIES WITH RESTRICTIONS - MAROOCHY SHIRE COUNCIL.                                                                                               * BREAK UP PREPARED HOLE WALLS IF GLAZED AND BASE IF COMPACTED.
                                                                                         * DECLARED PLANTS (LAND PROTECTION (PEST AND STOCK ROUTE MANAGEMENT) ACT 2002 (QLD))                                                                                                      * ADD WATER TO HOLE IF DRY.
                                                                                         *UNDESIRABLE PLANTS AND LIST OF NATURALISED PLANTS IN SOUTH EAST QUEENSLAND                                                                                                               * REMOVE TUBE FROM CONTAINER AND PLACE IN HOLE, POTTING MIX TO BE 25mm BELOW GROUND
                                                                                           (BATIANOFF & BUTLER, 2001, QUEENSLAND HERBARIUM)                                                                                                                                        LEVEL AFTER BACKFILLING AND PRESSING GENTLY TO SECURE.
                                                                                                                                                                                                                                                                                   * ADD ORGANIC MIX SOIL TO HOLE IF EXISTING GROUND IS DEFICIENT.
                                                                                         WEED CONTROL METHODS.
                                                                                                                                                                                                                                                                                   * CREATE A SMALL DAM AROUND TUBE WITH EXCESS SOIL TO HOLD WATER.
                                                                                         TREATMENT OF WEEDS IS TO BE UNDERTAKEN USING BEST HORTICULTURAL PRACTICES.                                                                                                                * REPLACE MUCH AROUND TUBE (OR MULCH MAT) MAINTAINING CLEAR ZONE 40mm FROM STEM.
                                                                                         WEED TREATMENT METHOD MUST PROVIDE PROTECTION FOR EXISTING NATIVE VEGETATION AND REQUIRED                                                                                                 *WATER IN NEW PLANTINGS - THREE TIMES IN FIRST WEEK / TWO TIMES IN SECOND WEEK / ONCE IN
                                                                                         REHABILITATION VEGETATION. AVOID POSSIBLE SOIL DISTURBANCE WHICH INCREASES RISK OF EROSION                                                                                                THIRD WEEK. (ADJUST WATERING WITH RAINFALL)
                                                                                         AND ADDITIONAL WEED INFESTATION.                                                                                                                                                          * MONITOR PLANT PROGRESS AFTER THIRD WEEK - DEEP WATER AS REQUIRED.
                                                                                         USE ONLY PESTICIDES APPROVED FOR TARGET USE. CHEMICAL MANUFACTURERS INSTRUCTIONS FOR USE                                                                                                  * USE WATER SAVING CRYSTALS OR SIMILAR IN DRY SOIL CONDITIONS.
                                                                                         OF PESTICIDE ARE TO BE FOLLOWED.
                                                                                         ALL NOXIOUS WEED SEED OR PROPAGATIVE MATERIAL SHOULD BE REMOVED FROM SITE AND DISPOSED OF
                                                                                         AT A APPROVED COUNCIL WASTE STATION.                                                                                                                                                      BIORETENTION MAINTENANCE
                                                                                         WEEDS ARE TO BE CONTROLLED DURING THE CONSTRUCTION AND 'ON MAINTENANCE' PHASE OF WORKS.                                                                                                   * ROUTINE INSPECTION OF THE BIORETENTION PROFILE TO IDENTIFY ANY AREAS OF INCREASED
                                                                                                                                                                                                                                                                                   SEDIMENT DEPOSITION, SCOURING FROM STORM FLOWS, RILL EROSION OF THE BATTERS FROM
                                                                                         MULCHING IS TO FORM PART OF THE WEED MANAGEMENT STRATEGY. MULCH DEPTH TO BE APPROX. 100 -                                                                                                 LATERAL INFLOWS, DAMAGE TO THE PROFILE FROM VEHICLES AND CLOGGING OF THE
                                                                                         150mm DEEP. MULCH TYPE TO BE FOREST MULCH OR CANE MULCH OR APPROVED SIMILAR. MULCH TO BE
                                                                                                                                                                                                                                                                                   BIORETENTION BASIN.
                                                                                         FREE FROM WEED MATERIAL AND FOREIGN DEBRIS. COUNCIL REFUSE MULCH IS NOT ACCEPTABLE. MULCH
                                                                                         JUTE MATS TO BE USED IN LOW AREAS ADJACENT WATERWAYS WITH RISK OF WASH.
                                                                                                                                                                                                                                                                                   * ROUTINE INSPECTION OF INFLOW SYSTEMS, OVERFLOW PITS AND UNDER-DRAINS TO IDENTIFY
                                                                                                                                                                                                                                                                                   AND CLEAN ANY AREAS OF SCOUR, LITTER BUILD UP AND BLOCKAGES.
                                                                                         FOR FURTHER WEED TREATMENT INFORMATION REFER TO:                                                                                                                                          * REMOVAL OF SEDIMENT WHERE IT IS SMOTHERING THE BIORETENTION BASIN VEGETATION.
                                                                                         QUEENSLAND DEPARTMENT OF NATURAL RESOURCES AND MINES - PEST FACTS. www.nrm.qld.gov.au/pests/                                                                                              * TILLING OF THE BIORETENTION BASIN SURFACE IF THERE IS EVIDENCE OF CLOGGING.
                                                                                                                                                                                                                                                                                   * REGULAR WATERING / IRRIGATION OF VEGETATION UNTIL PLANTS ARE ESTABLISHED AND
                                                                                                                                                                                                                                                                                   ACTIVELY GROWING.
                                                                                         EROSION CONTROL                                                                                                                                                                           * REMOVAL AND MANAGEMENT OF INVASIVE WEEDS (HERBICIDES SHOULD NOT BE USED)
                                                                                         EROSION CONTROL METHODS ARE TO BE IN GENERAL ACCORDANCE WITH 'SOIL EROSION & SEDIMENT                                                                                                     * REMOVAL OF PLANTS THAT HAVE DIED AND REPLACEMENT WITH PLANTS OF EQUIVALENT SIZE
                                                                                         CONTROL' - ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES - JUNE 1996'                                                                                                          AND SPECIESAS DETAILED IN THE PLANT SCHEDULE.
                                                                                         METHODS WILL INCLUDE SEDIMENT FENCING TO BE INSTALLED GENERALLY ALONG CONTOUR AS REQUIRED.
                                                                                                                                                                                                                                                                                   * PRUNING TO REMOVE DEAD OR DISEASED VEGETATION MATERIAL AND TO STIMULATE GROWTH.
                                                                                         EROSION CONTROL JUTE MATTING (SECURELY PINNED & APPROPRIATELY OVERLAPPED) WILL BE INSTALLED
                                                                                         TO MANUFACTURERS INSTRUCTIONS THROUGHOUT INTERNAL BATTERS OF BIO-RETENTION BASIN.
                                                                                         JUTEMAT OR OTHER EROSION CONTROL MATTING SHALL ALSO BE USED BENEATH ANY DRY ROCK WORK.
                                                                                         BLANKET MULCHING THE BALANCE OF THE REVEGETATION AREA TO REQUIRED DEPTH WILL FOLLOW
                                                                                         EARTHWORKS AS SOON AS PRACTICAL.




                                                                                                                                                                                                                                                                                                 BIO-RETENTION SPECIES LIST

                                                                                                                                                                                                                                                                                                 Zone         Species        Common Name                           Height   Form        Planting
                                                                                                                                                                                                                                                                                                                                                                                        Density




                                                                                             BIO-RETENTION PLANTING RATIONALE
                                                                                             THE BIO-RETENTION FILTER'S PRIMARY FUNCTION IS FOR WATER QUALITY TREATMENT.
                                                                                             IT IS AN AREA WHICH WILL BE PERIODICALLY INUNDATED WITH WATER AND PERMANENTLY OR PERIODICALLY SUPPORT THE GROWTH OF MACROPHYTE
                                                                                             SPECIES.
                                                                                             IT SHOULD BE DESIGNED, OPERATED AND MAINTAINED AS A SUSTAINABLE FACILITY TO PROVIDE THE DESIRED LEVEL OF STORMWATER TREATMENT.
                                                                                             CORRECT DESIGN, CONSTRUCTION AND MAINTENANCE OF THE FACILITY WILL ENSURE THAT DISCHARGES ARE OF SUCH QUALITY THAT ENVIRONMENTAL
                                                                                             VALUES OF DOWNSTREAM RECEIVING WATERS ARE PROTECTED OR ENHANCED.
                                                                                             THE CORRECT SELECTION AND LOCATION OF MACROPHYTE SPECIES WITHIN THE BASIN WILL ENSURE HEALTHY GROWTH AND DOWNSTREAM WATER
                                                                                             QUALITY.




                                                                                                                                                                                                                                    AMENDMENTS
              PROJECT
                                PROPOSED INDUSTRIAL ESTATE - VENTURA DRIVE , NOOSA
                                                                                                                                                                                                                                    issue
                                                                                                                                                                                                                                    A
                                                                                                                                                                                                                                             date      description
                                                                                                                                                                                                                                            23.04.08 ISSUE FOR APPROVAL
                                                                                                                                                                                                                                                                                                                             element design
                                                                                                                                                                                                                                                                                                                             landscape architecture
                                                                                CLIENT
              DWG TITLE
                                LANDSCAPE PLAN - SHEET 04 OPERATIONAL WORKS              GATEWAY RISE PTY LTD                                                                                                                                                                                                                MASTER PLANNING SUBDIVISIONS
                                                                                                                                                                                                                                                                                                                             COMMERCIAL DEVELOPMENTS    RESORTS
                                                                                                                                                                                                                                     C COPYRIGHT 2007 ELEMENT DESIGN QLD PTY LTD                                             PARKLANDS    REVEGETATION  MULTI-UNITS
PLANTING                                                     CONTEXT                                                 SERVICES                                                                                                        Copyright in the whole and every part of this document belongs to                                                                       Date     10 APRIL 08
                                                                                                                                                                                                                                     ELEMENT DESIGN QLD PTY LTD and may not be used, sold,                                   151 Brisbane Rd. Mooloolaba
           STREET TREE PLANTINGS                                                                                                                                                                                                     transferred, copied or reproduced in whole or in part in any manner or                  Phone 07 5444 6155 Fax 07 5444 6055             Scale    1:200 @ A1
                                          TURF TO FOOTPATH                                                                        STORMWATER LINE                     SEWER LINE                          ELECTRICAL RETICULATION    form or in or on any media to any person without the prior written
           As located on plan                                                                                                                                                                                                                                                                                                PO Box 1546, Buderim QLD 4556
                                                                                                                                                                                                                                     consent of ELEMENT DESIGN QLD PTY LTD.                                                                                                  Design   JS       Drawn   JS
                                                                                                                                                                                                                                                                                                                             [email protected]
                                                                                                                                                                                                                                                                                                                                                                             Sheet    4 OF 4
           FEATURE ENTRY TREES                                                                                                   WATER LINE                            EXISTING SEWER
           200 Litre

                                                                                                                                                                                                                                                                                                                             ED 7197                   OPW - 04                                        A

Used in these records

About this file

File size
8.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0148 - Vegetation Application.pdf · 8.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.