Council archive · source document
Minor Change Existing Approval 132007.2106.01 [AS PUBLISHED]
Officer: Georgina Schramm
Direct Telephone: 07 53296569
Our Reference: 132007.2106.01
Your Reference: n/a
24 September 2024
The Captain's Daughter Co. Pty Ltd
C/- Brennan Planning Pty Ltd
44 Maple St
COOROY QLD 4563
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 7 February 2024, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 132007.2106.01
Street address: Gorrie 1/2 Heron St Peregian Beach Qld 4573
Real property description: Lot 1 BUP 11239 & BUP 11239
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 29 August 2008
• Development Permit for Material Change of Use of Premises – Entertainment & Dining
Business Type 1 – Food & Beverages
In relation to the request to make a minor change to the existing approval, Council on 20 September
2024, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 1.
C. Delete conditions 4.3 & 4.4.
D. Include additional conditions 13 & 14.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are:
Plan No. Rev. Plan/Document Name Date
11 A Outdoor Plan – Hiller & Associates 22/01/2008
Commercial Catering Products
11 A Outdoor Elev – Hiller & Associates 22/01/2008
Commercial Catering Products
01 A Schedule Plan – Hiller & Associates 10/01/2007
Commercial Catering Products
D-00928-01-A Proposal Plan – Martoo Consulting 12/08/2007
D-00928-02-A Elevation Plan – Martoo Consulting 12/08/2007
132007.2106.01 – Outdoor Covered Area Extension
PRELIM 1 - Site Plan prepared by studio 4 building design 7th Oct
2022
A202 A00 Ground Floor Plan prepared by Collins 20.06.2024
Building Design
PRELIM 4 - Elevations prepared by studio building design 7th Oct
2022
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The area between Heron Street and the northern building line is not approved as an Outdoor
Dining Area and as such, shall not be used as a dining area.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and landscape plan reference number D-00928-01-A prepared
by Martoo Consulting and dated 12 August 2007. Such landscaping is to be completed prior
to the premises being occupied and maintained at all times thereafter and shall include:-
4.1. The roller shutters are to be replaced with glazed windows or doors;
4.2. All planter boxes are to be replaced with mulched garden beds that are finished to a
maximum height of the timber decking along the eastern boundary and the ramped
pedestrian footpath on the northern boundary; and
4.3. Deleted.
4.4. Deleted.
4.5. The Syzygium aussie compact species shall be interspersed with alternative syzygium
species to provide a dense visual screen of the proposed rendered walls to the
reasonable satisfaction of the Chief Executive Officer.
5. Existing trees on the site and within the road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved use.
Page 2 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Page 3
6. Any advertising sign or device is to comply with Council's policies on advertising.
7. All goods are to be displayed on site within the property boundaries and/or on the premises
approved for the use.
8. The premises shall be identified by the provision of the street number in a prominent location,
preferably near the site entry, (i.e. on the kerb or by signage on the building or site).
9. All entrances and exits to the building are to be lit and signed, with the signage to include the
hours of operation.
10. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Building Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. This Development Permit lapses if the development has not happened by 19 March 2012,
unless application to extend the relevant period is approved by Council.
Additional Conditions – 20 September 2024 - 132007.2106.01
13. Prior to the issue of the Final Certificate/Certificate of Occupancy, an additional character
tree is to be planted within the landscaped area of the common land to scale down the built
form towards the streetside. This is also to increase the soft landscaping visible from the
adjoining parkland and streetscape. The selected species to be in accordance with Planning
Scheme Policy PSP3 of the Noosa Plan 2020, the species is to achieve a mature height of
at least 2.5 minutes high.
14. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3. The internal drainage system must be
constructed so as not to concentrate stormwater runoff onto adjoining properties, reserves
and roads.
5. REFERRAL AGENCIES
The referral agencies applicable to 132007.2106 are:
Referral Trigger Referral Status Referral Agency Referral Address
The site is in an area Concurrence Environmental Contaminated Land Unit
for which area Protection Agency GPO Box 2771
management advice BRISBANE QLD 4001
has been given for
unexploded ordnance.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999
and Local Law No. 12, prevents a builder or building contractor carrying out building work
on a building site in a way that makes or causes audible noise to be made from the building
work:-
1.1 On a Sunday or public holiday, at any time; or
1.2 On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Page 3 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Page 4
Aboriginal Cultural Heritage Act 2003
2. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the Act can also issue stop orders for an activity that
is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of
Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
Infrastructure Charges
3. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable
8. VARIATION APPROVAL DETAILS
Not applicable
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
10. SUBMISSIONS
Not applicable
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Georgina Schramm
Development Planner
Enc: Appeal Rights
Approved Plans/Documents
Page 4 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Page 5
DECISION NOTICE HISTORY
• Original Decision Notice issued 19 March 2008
• Negotiated Decision Notice issued 29 August 2008 with
amendment to Conditions 1, 4 & 11
• Decision Notice - Minor 132007.2106.01 – 20 September 2024,
amend conditions 1, delete conditions 4.3 & 4.4, include additional
conditions 13 & 14.
Page 5 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Page 6
Referral Agency Response
PLANNING ACT 2016 & PLANNING REGULATION 2017
Page 6 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Page 7
Page 7 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024 [OCR of page images] - “7 IDAS C-6 Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone should only proceed following the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO investigation and remedial search contractors that it accredits to carry out this work. Defence also recommends that owners or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object is found. As the EPA has no record of the site being further investigated or remediated, it is considered that there remains a possibility of UXO being found on it. However, the EPA is also informed of the extent of development that has been carried out on the site. Because there is no recorded evidence of UXO being found on this site during its development to date or on adjoining sites that have been similarly developed, it is considered that the potential for residual UXO to exist on the site is only slight. 4 Conditions The following concurrence agency conditions are to be attached to any approval: 41 Any person employed to work on any excavation, earthworks or soil disturbance related to the subject development of the site is to be forewamed in writing by the applicant. This warning is to explain that information available to the EPA indicates a slight potential for residual UXO exists on the site and work should proceed with duc caution. It is to state the procedure to be followed by any person finding an object suspected of being explosive ordnance or component thereof: ¢ Do not disturb the object. e Take action, where appropriate, to prevent it being disturbed by another person. * Note its approximate dimensions and general appearance. * Note the route to its location. » Advise the Police as soon as possible. 4.2. The applicant is to notify the EPA of any UXO or explosive ordnance component found on the site as soon as possible after such an object is discovered. 4.3 At the completion of any earthworks related to the subject development, a written statement, signed by the principal contractor, is to be provided by the applicant to the EPA advising of any evidence of UXO or lack thereof and the extent of earthworks conducted. 4.4 Prior to Condition 4.3 being satisfied, no excavated gravel, rock, sand or soil is to be removed from the site without written EPA approval. 4.5 The applicant is to advise the owner and any occupier of the site of the above responsibilities. 5 Additional comments or advice Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence website http: sxof for the details of current UXO investigation and remedial search contractors. The EPA a accepts reports based on investizative and remedial work carried out by these contractors. VER2 Page 7 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024
Page 8
Page 8 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024 [OCR of page images] “Ff IDAS C-6 Applicants may choose to discuss, with the EPA, an alternative to compliance with the above conditions. Such alternative would involve the employment of a UXO contractor to complete an investigation and any necessary remedial action and to subsequently submit an investigation’ remediation report to the EPA as part of the approval process. This would be with the view of having the EPA reassess the whole lot as being unaffected by UXO and for the EPA to advise the applicant and Council accordingly. Such reassessment may be possible where the report contains sufficient evidence for Defence’s assessment, in regard to the particular lot, to be refuted, or for the lot to otherwise be considered remediated. Where there is insufficient evidence, such reassessment would be unlikely. Also, where the use of detection equipment by the UXO contractor, as part of the investigation, is made impractical due to existing structures or metal waste in the ground, the UXO contractor may be limited to a visual inspection during excavation, etc, or to screening the gravel, rock, sand or soil as it is excavated. Under these circumstances, whilst a greater certainty may be attached to identifying any possible UXO, from a safety perspective, the risk would be reduced not much more than it would through compliance with the above conditions. 6 Additional information 4 This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities. Applicants should also comply with ail relevant legistation. The EPA has not provided a notification to native title parties for this application. The State’s Native Title Work Procedures indicate that the responsibility for assessment of native litle issues for an IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* IDAS C-6 CLM VER? Page 8 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024
Page 9
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 9 of 9
Document Set ID: 23257205
Version: 3, Version Date: 24/09/2024
Used in these records
Minor Change Existing Approval 132007.2106.01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 322 KB (small file)
- File type
No other editions are linked here.