Council archive · source document
Minor Change Existing Approval 132007.2106.01 [AS PUBLISHED]
Page 8 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024 [OCR of page images] “Ff IDAS C-6 Applicants may choose to discuss, with the EPA, an alternative to compliance with the above conditions. Such alternative would involve the employment of a UXO contractor to complete an investigation and any necessary remedial action and to subsequently submit an investigation’ remediation report to the EPA as part of the approval process. This would be with the view of having the EPA reassess the whole lot as being unaffected by UXO and for the EPA to advise the applicant and Council accordingly. Such reassessment may be possible where the report contains sufficient evidence for Defence’s assessment, in regard to the particular lot, to be refuted, or for the lot to otherwise be considered remediated. Where there is insufficient evidence, such reassessment would be unlikely. Also, where the use of detection equipment by the UXO contractor, as part of the investigation, is made impractical due to existing structures or metal waste in the ground, the UXO contractor may be limited to a visual inspection during excavation, etc, or to screening the gravel, rock, sand or soil as it is excavated. Under these circumstances, whilst a greater certainty may be attached to identifying any possible UXO, from a safety perspective, the risk would be reduced not much more than it would through compliance with the above conditions. 6 Additional information 4 This concurrence response applies only to contaminated land issues and does not remove the need to obtain any further approval for this development which may be required by this or other legislation, State and/or Commonwealth. Applicants are advised to check with all relevant statutory authorities. Applicants should also comply with ail relevant legistation. The EPA has not provided a notification to native title parties for this application. The State’s Native Title Work Procedures indicate that the responsibility for assessment of native litle issues for an IDAS application rests with the Assessment Manager. It is recommended that the Assessment Manager determines whether native title notification is required for this application. *End of response* IDAS C-6 CLM VER? Page 8 of 9 Document Set ID: 23257205 Version: 3, Version Date: 24/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132007.2106.01 [AS PUBLISHED]Related documentApplication case desk ↗
About this file
- File size
- 322 KB (small file)
- File type
No other editions are linked here.