Decision Notice - 010.2007.00002081.001 [As Published] · 142007.2081
2007/2081
16322-H2 A Hydraulics Services (Stormwater Drainage 24 August 2006
Plan) – SCG Consulting Engineers
0501 – A 07 Perspectives (Access Section) – design 42 May 2007
Pty Ltd
0501 – A 01’A’ A Basement Floor Plan (Access & Carpark) – June 2007
design 42 Pty Ltd
10. Roof and surface runoff connection to Council’s kerb and channel shall be as shown on
drawing No. 16322-H2 by SCG Consulting Engineers . Kerb adaptors shall be used in the
kerb.
11. A Traffic Management Plan for the development addressing all construction phases shall be
prepared by suitably qualified persons and submitted to Council for approval prior to the pre
start meeting. The report shall address, but not be limited to, all items listed below, further the
plan shall be flexible that it addresses all stages of the development:-
11.1 A single nominated access location to from the site.
11.2 The plan should detail the routing of trucks to and from the site.
11.3 Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
11.4 Provision of safe cycle and pedestrian movements around the development on
Ferguson Street.
11.5 No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
11.6 Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
11.7 Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
12. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
13. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
14. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
15. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002081.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63 KB (small file)
- File type
No other editions are linked here.