Skip to the record
Beware of cheap imitations.

Council archive · source document

Decision Notice - 010.2007.00002081.001 [As Published] · 142007.2081

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                      2007/2081



24.    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
       be imposed on construction works during the maintenance period, which is a minimum period
       of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
       Developer for the works.
25.    Certification of completed works must be provided to Council by the supervising engineer.
26.    The works to become Council assets will not be accepted "On Maintenance" until the
       landscaping is completed.
27.    These works are also to be in compliance with the relevant conditions of Development Permit
       No. 2005/0391.
28.    Notwithstanding that Council has checked the plans with due care, where it is found during
       construction that variations from Council's standards exist, then Council standards shall apply

5      REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency       Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                     Date
 0501 – LA 01                       Landscape Plan – Tropical Plantscapes    August 2007
 16322-OW1                          Operational   Works  &       Drainage    June 2007
                                    (Sediment Control Plan)      – SCG
                                    Consulting Engineers
 16322-H2                  A        Hydraulics  Services (Stormwater         24 August 2006
                                    Drainage Plan) – SCG Consulting
                                    Engineers
 0501 – A 07                        Perspectives (Access Section) – design   May 2007
                                    42 Pty Ltd
 0501 – A 01’A’            A        Basement Floor Plan (Access          &   June 2007
                                    Carpark) – design 42 Pty Ltd

7      ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     Should any changes or modifications to the approved plans be required as a result of
       construction constraints, a Change to an Existing Approval Application under the Integrated
       Planning Act must be made. Amended plans clearly indicating the changes must be lodged
       with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).


                                                                                     Page 5 of 8

Used in these records

About this file

File size
63 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002081.001 [As Published].pdf · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.