Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

11c Church St Pomona Ecological Assessment Rev B

of 99

Page text read automatically using OCR, there may be inaccuracies

Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au


 Performance Outcomes                            Acceptable Outcomes                                                 Compliant   Compliance Response
     2. provide measures to assist the           AO11.4 During construction, measures are incorporated to not                    habitat area located
        survival of koala populations in the     increase the risk of death or injury to koalas, by including safe               extrinsically to the site
        area to mitigate any potential           koala movement measures, as defined in the Planning Regulation                  and Planning Regulation
        threats or risk to koalas; and           2017.                                                                           2017 s11(2)(2) applies.
     3. provide for safe and appropriate                                                                                         It is considered the
        koala movement across the                                                                                                development does not
        landscape.                                                                                                               adversely affect
                                                                                                                                 condition of soil or
                                                                                                                                 hydrological flow. The
                                                                                                                                 proposed development
                                                                                                                                 will plant native
                                                                                                                                 vegetation with
                                                                                                                                 landscaping and
                                                                                                                                 rehabilitation, decrease
                                                                                                                                 spread of invasive
                                                                                                                                 vegetation and the
                                                                                                                                 development is located
                                                                                                                                 to minimise vegetation
                                                                                                                                 cleared for safety
                                                                                                                                 purposes.
 Bushfire Management                             No acceptable outcome provided                                      Yes         Refer Bushfire
 PO12 Bushfire management measures are                                                                                           Management Report
 adopted based on ecological principles,                                                                                         submitted as part of
 which:                                                                                                                          development application
     1. PDLQWDLQDQGHQKDQFHELRGLYHUVLW\                                                                                       (FM 5601- Eldon
     2. minimise threat of fire to the natural                                                                                   Bottcher Architect Dated
          environment, as well as life and                                                                                       27/01/2022).
          SURSHUW\DQG
     3. provide for effective use and
          maintenance of buildings and
          structures.
 Scenic amenity                                  AO13.1 Vegetation is retained:                                      Yes         Retention of native
 PO13                                                                                                                            vegetation along water
 The scenic amenity and vegetated                    1. on and within 30 metres of prominent ridgelines and                      course is proposed for
 character of the landscape is protected by             on sloping sites;                                                        the development
 retaining vegetation:                                                                                                           application.
Page 18
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022

Log in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.