Skip to the record
Beware of cheap imitations.

Original source · versioned page text

11c Church St Pomona Ecological Assessment Rev B

of 99

Page text read automatically using OCR, there may be inaccuracies

Pace Planning
Development and Environmental Consultants
www.paceplanning.com.au



            /$1'6&$3,1*$1'5(+$%,/,7$7,210$1$*(0(17

Strategies to facilitate landscape design and rehabilitation management are included in
Table 9 to enhance exiting vegetation and ecological connectivity.

Table 9 ± Landscaping and Rehabilitation

 Criteria                                                             Action         Responsibility
 Landscape Design                                                     Detailed       Suitably
                                                                      design stage   qualified
 Designing landscaped areas to complement and enhance
                                                                                     consultant
 existing vegetation and ecological linkages. Landscaping and
 rehabilitation plans should be prepared in reference to Noosa
 planning scheme policy SC6.3 ± PSP2 Landscaping.
 Bushfire Management                                                  Detailed       Suitably
                                                                      design stage   qualified
 Site-specific bushfire management ecological requirements are
                                                                                     consultant
 outlined in the MCU development application bushfire
 management report (FM 5601- Eldon Bottcher Architect Dated
 27/01/2022). Any landscaping within the site, including
 rehabilitation of the waterway area, will incorporate bushfire
 management practises outlined in current Bushfire Resilient
 Communities Technical Reference Guide and Bushfire Resilient
 Building Guidance for Queensland Homes published by
 Queensland State Government.
 Rehabilitation                                                       Prior to       Suitably
                                                                      operational    qualified
 Rehabilitation of riparian buffer zone is to be restored and
                                                                      works          consultant and
 enhance surrounding linkages by removing species likely to                          proponent
 displace native flora species or degrade fauna habitat. Replanting
 and rehabilitating degraded habitat and replacing any vegetation
 removed should be done with suitable local native species and
 avoiding the planting of pest plant species As part of any
 operational works application, landscape and rehabilitation plans
 would be prepared to identify and remove introduced and invasive
 species in reference to the Biosecurity Act 2014 (Qld) and Noosa
 Biosecurity Plan 2020. Landscape and rehabilitation plans would
 be in general reference to the South-East Queensland Ecological
 Framework Manual (2012) and identify schedules and ecological
 restoration techniques.




Page 20
Ecological Assessment Report ± 11C Church St Pomona 4568 QLD,
3 March 2022

Log in to download the original (11c Church St Pomona Ecological Assessment Rev B.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.