Original source · versioned page text
TPC 2104 - Approval with Conditions - 12 Units - 6-16 Douglas St Sunshine Beach
MITPATO DEVELOPMENT PTY. LTD. - TPC 2104 ~- 17TH OCTOBER, 1988 - PAGE 2 5. 10. 11. 12. 13- 14. Existing trees are to be retained, except where required to be removed due to building operations or the conduct of the approved use. Construction work is permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday and no construction work is permitted on public holidays, except where extended hours ere approved by the Building Surveyor. Any advertising sign or device is to comply with the provisions of the Noosa Design Manual. All lots that form part of this application are to be smalgamsted in Title, prior to the issue of a Building Approval. Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage Headworks, current at the time of Building Approval. Calculations based upon the current Policy including Price Index variation as at June, 1988 are estimated as follows:- Water Supply - $21,972 Sewerage - $ 9,997 TOTAL: $31,969 If payment is not proposed to be made prior to the issue of Building Approval, a cash bond or trading bank guarantee for the required amount is to be lodged prior to the release of that Approvel. The contribution is then required to be made within fourteen (14) days of the issue of Building Approvel. The footpath to the frontage of the site is to be fully paved with a minimum construction width of 1.2 metres to the satisfaction of the Shire Engineer. The developer shall bear the cost of alteration of any public utility or facilities necessitated by the development of the land or associated construction works external to the site. Connection to Council's existing water supply reticulation systems at the developer's expense to the standards and requirements of Council's Shire Engineer. Roof and surface water is to be collected on site and to be discharged through a single underground drain line into existing drainage in the unnamed lane to the rear to the satisfaction of the Shire Engineer. Provision of approved refuse containers in accordance with the requirements of the Refuse Management Regulations of 1983 for the storage and collection of refuse to the satisfaction of Council's Health Surveyor.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.