Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

TPC 2104 - Approval with Conditions - 12 Units - 6-16 Douglas St Sunshine Beach

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

MITPATO DEVELOPMENT PTY. LTD. - TPC 2104 ~- 17TH OCTOBER, 1988 - PAGE 2

 

5.

10.

11.

12.

13-

14.

Existing trees are to be retained, except where required to be removed
due to building operations or the conduct of the approved use.

Construction work is permitted only during the hours of 7.00 a.m. to
6.00 p.m. Monday to Saturday and no construction work is permitted on
public holidays, except where extended hours ere approved by the
Building Surveyor.

Any advertising sign or device is to comply with the provisions of the
Noosa Design Manual.

All lots that form part of this application are to be smalgamsted in
Title, prior to the issue of a Building Approval.

Payment of contributions in accordance with Council's Policy on Water
Supply and Sewerage Headworks, current at the time of Building
Approval. Calculations based upon the current Policy including Price
Index variation as at June, 1988 are estimated as follows:-

Water Supply - $21,972
Sewerage - $ 9,997

 

TOTAL: $31,969

If payment is not proposed to be made prior to the issue of Building
Approval, a cash bond or trading bank guarantee for the required
amount is to be lodged prior to the release of that Approvel. The
contribution is then required to be made within fourteen (14) days of
the issue of Building Approvel.

The footpath to the frontage of the site is to be fully paved with a
minimum construction width of 1.2 metres to the satisfaction of the
Shire Engineer.

The developer shall bear the cost of alteration of any public utility
or facilities necessitated by the development of the land or
associated construction works external to the site.

Connection to Council's existing water supply reticulation systems at
the developer's expense to the standards and requirements of Council's
Shire Engineer.

Roof and surface water is to be collected on site and to be discharged
through a single underground drain line into existing drainage in the
unnamed lane to the rear to the satisfaction of the Shire Engineer.

Provision of approved refuse containers in accordance with the
requirements of the Refuse Management Regulations of 1983 for the
storage and collection of refuse to the satisfaction of Council's
Health Surveyor.
Log in to download the original file

TPC 2104 - Approval with Conditions - 12 Units - 6-16 Douglas St Sunshine Beach.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.