Delegated Report - Code - Planning OPW24 0043 · OPW24/0043
Author Development Engineer, Daniel Epps Development Assessment APPLICATION DETAILS Application No. OPW24/0043 Applicant Ironbark SMSF P/L TTE Proposal Operational Works - Carparking, Landscaping, Stormwater, Vehicle Crossover Properly Made Date 3 April 2024 Information Request Date 2 May 2024 Information Response Date 8 July 2024 Decision Due Date 27 August 2024 Report Reviewed & Finalised By Will Lowe – 27 August 2024 PROPERTY DETAILS Property Address 48 Elm St Cooroy Qld 4563 RP Description Lot 1 RP 155843 Land Area 759.0000 m² Existing Use of Land Commercial STATUTORY DETAILS SEQRP Designation Urban Footprint Zone District Centre Precinct Not Applicable Local Plan Area Cooroy Local Plan Overlays NIL Assessment Type Code PROPOSAL The application seeks approval for a Operational Works - Carparking, Landscaping, Stormwater, Vehicle Crossover. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan site details Background The application sets out to address the conditions of the Higher Order Approval (MCU19/0149.02). assessment The application includes the construction of a Type 2 Retail Business at the corner of Elm & Pearl Street, Cooroy. The pertinent issues raised as part of Council’s assessment are discussed below. Stormwater The development is proposing to control, collect and discharge stormwater directly into existing stormwater infrastructure located within an inter-allotment drainage easement. The subject site is 758m2 which is less than the trigger for assessment against the State Planning Policy (2,500m2). The development proposes to increase fraction impervious from 71.8% to 91.6%. Given the marginal increase in fraction impervious and existing site area, the use of quality treatment devices is not considered necessary. The increase in hardstand proposes to increase the post-development peak flow rate from the pre-development peak flow rate by 14% (9L/s) during the 1% AEP event. This increase is to be offset by detaining roofwater. Review of the MUSIC model suggests that structure A/2 (the proposed ‘outlet’) surcharges during a 10% AEP event by 20mm and 130mm in a 1% AEP event. Surcharging pits are typically not supported by Council; however, pit A/2 is surrounded by a 150mm high standup kerb containing any water. Any water that tops the kerb is likely to sheet flow into the road reserve. This is considered an acceptable outcome in this instance. Frontage Works As part of the higher order approval (MCU19/0149.02), the applicant was required to provide external works to the development such as 5 on-street angled carparks, a single 2m chord truncation, and a 2.0m wide footpath along both site frontages. The proposed external works are generally compliant except for the layout of the footpath along the Pearl Street frontage, grade of adjoining areas of verge, and additional ‘cutouts’ of footpath along the Elm Street frontage. It is recommended that these matters are conditioned to be resolved prior to Council attending a prestart meeting. Access & Parking The proposed crossover is generally compliant with RS-051 and complies with the maximum width at the kerb. Carparks are generally compliant with AS2890. Engineering believes that the proposed development generally complies with the relevant provisions of The Noosa Plan 2020 and recommends the following conditions. Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Cooroy Local Plan Code; and Works Codes – Driveways and Parking, Earthworks, Water Quality and Drainage, Transport and Landscaping. The application has been found to generally comply with all applicable statutory instruments. cONSULTATION Referral Agencies Not applicable. Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Infrastructure Services – Design Senior Environment Officer conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW24/0043 for a Operational Works - Carparking, Landscaping, Stormwater, Vehicle Crossover situated at 48 Elm St Cooroy Qld 4563 and described as Lot 1 RP 155843, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW24/0043 Street address: 48 Elm St Cooroy Qld 4563 Real property description: Lot 1 RP 155843 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Approval for Operational Works - Carparking, Landscaping, Stormwater, Vehicle Crossover CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 011 01 Driveway Longitudinal Section Prepared by RECOR Consulting 28 June 2024 021 03 Earthworks Sections Prepared by RECOR Consulting 28 June 2024 041 03 Stormwater Drainage Details Prepared by RECOR Consulting 28 June 2024 045 03 Stormwater Catchment Layout Plans Prepared by RECOR Consulting As Annotated by Council 28 June 2024 050 03 Sewer and Water Connection Layout Plan Prepared by RECOR Consulting As Annotated by Council 28 June 2024 CD-001 B Specification Notes Project Urban 30 May 2023 The following plans require amendment. Plan No. Rev. Plan/Document Name Date 010 03 Site Layout Plan Prepared by RECOR Consulting 28 June 2024 020 03 Bulk Earthworks Layout Plan Prepared by RECOR Consulting 28 June 2024 040 03 Stormwater Layout Prepared by RECOR Consulting 28 June 2024 Amendments The above plans must be submitted to Council for agreement prior to a prestart meeting and incorporate the following: The removal of the three (3) additional footpath panels along the Elm Street frontage in accordance with the approved plans of the higher order approval. The western side of the proposed footpath along Pearl Street must be realigned to connect to the existing footpath along Elm Street at a ‘right-angle’ (i.e., generally as represented in Drawing No. 030). Plan No. Rev. Plan/Document Name Date CD-000 B Cover Sheet, by Project Urban 30.05.2023 CD-100 B Landscape Plan: Ground Level by Project Urban 30.05.2023 Amendments The landscape plans must be resubmitted prior to a prestart meeting and incorporate the following: Removal of the bio basin and replace with a landscaped garden Updated species list removing Bio Basin Planting Mix Species Updated Planting Schedule incorporating addition plant numbers to accommodate the landscaping of the bio basin area as a garden. Substitution of the following plants for alternate species found in the Planning Scheme Policy 2 – Landscape: Dietes Grandiflora Liriope Amethyst Cordyline fruticose ‘Kiwi’ Cordyline ‘Negra’ Cordyline ‘Rubra’ Senecio serpens CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 27 August 2026, unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS Bonds A site control and/or compliance bond of $20,000 is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. Bonds must: have approval of the bond calculations and amount from Council prior to lodgement; be lodged with Council and accompanied by the Bond Administration Fee/s; and be requested for release by writing to Council, when relevant approval requirements have been met. PRIOR TO COMMENCEMENT OF WORKS Engineering Submit amended plans to Council as described in the List of plans requiring amendments. Plans must be submitted and approved prior to the pre-start meeting. All necessary approvals from external service providers (e.g., Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Erosion and sediment control works; and Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; Maintenance of safe vehicle and pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Proposed fencing to the site during the construction phase of the development; Adequate parking arrangements for construction workers; and No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures; Works programme identifying key components of the works and their respective durations; Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues; Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details; Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details; identification of complaint management procedures including: contact details for the on-site manager; dispute resolution procedures; and For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice; The relevant conditions of the higher order Material Change of Use approval viz. MCU19/0149.02 to which this approval relates; All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; and The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Retention of Existing Trees and Vegetation All trees and vegetation identified for retention must be protected in accordance with AS 4970, Protection of trees on development sites. Vegetation Clearing Prior to felling or pruning, all trees are to be inspected for wildlife (i.e. koalas, possums, birds’ nests etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left the tree or has been removed by a qualified person*. *(Refer to Advisory Note) FAUNA - FOR VERY MINOR VEGETATION REMOVAL All tree and vegetation removal works must be undertaken by a qualified person*. *(Refer to Advisory Note) OPW CLEARING OF VEGETATION (only) Landscaping Works Landscape works must be supervised, undertaken and certified by qualified persons*. All works must be completed in accordance with this Decision Notice (* Refer to Advisory Note) Landscape works must: Ensure amenity or sales signage and ancillary infrastructure is not installed within the road reserve. Ensure permanent irrigation is not installed within the road reserve. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment contamination and is applied to all planting areas to ensure a minimum 100mm depth once settled. *(Refer to Advisory Notes) Public amenity trees* must: Meet AS2303:2018 - Tree Stock for Landscape Use Be located in accordance with engineering requirements for safe vehicle and pedestrian sight lines. *(Refer to Advisory Note) Turfed areas must be must be free of pest, diseases and weeds and level with adjoining surfaces. Soil for landscaping must: Provide for healthy and sustained site specific vegetation performance. (for larger sites) comply with AS 4419, Soils for landscaping and garden use. Roadworks (External Roadworks & Road Widening Works) All pavement widening or construction of new pavement must join neatly to the existing pavement so that there are no irregularities in line or level resulting at or adjacent to the join for the length of the construction. Where necessary the existing pavement must be brought to a satisfactory standard to allow for the above. All street surfacing must consist of a minimum depth of 30mm of an approved hot mixed asphaltic concrete, unless other pavement types are approved as feature areas in intersection thresholds, speed control devices, turning areas, indented parking etc. The installation and/or modification of any traffic signs, street signs, line marking and Raised Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). New or relocated signage must be installed using the VLok installation system. All new signage must be Class 1 retroreflective material in accordance with AS 1906.1, Retroreflective materials and devices for road traffic control purposes – Part 1: Retroreflective sheeting. Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe vehicle and pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065; Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards; All paths must have a slip resistant surface; Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists; and The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety; and be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. Site Access and Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawings RS-051 and any associated addendum. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete; The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties; Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway; Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path; and The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council. Fall protection must be provided to retaining walls that are over 1m high and accessible by the public. Slope and batters are a maximum grade of: 1 in 4 for grassed areas; 1 in 3 for planted areas; and 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g., by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Erosion and Sediment Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods; Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods; Been revised to address predicted rainfall events; and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure non-essential exposure of soil is prevented by restricting the extent of disturbance and minimising the duration of soil exposure to adverse weather conditions and effectively turf, cover or stabilise any disturbed area without delay and prior to rainfall occurring. The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Prior to commencement of use the following (prepared by respective qualified persons* and certifying compliance with approvals) must be submitted to Council: Landscaping certification confirming all works have been constructed in accordance with conditions of approval. AS2303:2018 certification for all street trees. (* Refer to Advisory Note) As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering Design Standards”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. Landscaping, including all assets and improvements within parks, open space and road reserves areas are to be shown on an accompanying separate landscape plan (prepared in .dwg file format with accompanying hardcopy PDFs) and include a complaint ADAC XML file. Details of the landscaping and all associated assets and improvements may be included in the ADAC XML digital file prepared for associated civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file containing landscape and asset information only. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to the commencement of the use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit; as Constructed details in accordance with Council’s Planning Scheme Policy; and maintenance and operational manuals for all proprietary or site specific devices. Off Maintenance Prior to requesting an Off Maintenance inspection, the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements; or submitted certification falsely states works comply with approval requirements. A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. reference documents Plan No. Rev. Plan/Document Name Date 20220206-SWMP01 1 Stormwater Management Plan Prepared by RECOR Consulting 28 June 2024 referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-051. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Retention of Existing Trees The existing trees on adjoining properties must be retained and protected during construction wherever achievable. To avoid doubt, this advisory note is not intended to exclude the operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following construction of the development which is the subject of this development approval. Qualified Person Qualified Person, for the purpose of: Supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design. Undertaking landscape construction and establishment works is considered to be a person with five years current experience in commercial landscape construction projects. Undertaking, supervising tree works and preparing arboriculture certification, is considered to be a person with a minimum three years current experience in tree protection, hazard identification/mitigation and assessment and either: International Society of Arboriculture (ISA) certification; or A Diploma of Arboriculture. Landscape Works The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges Register where: An inspection revealed that any constructed rehabilitation/landscape works do not comply with the conditions of the Decision Notice, Approved Plans and or Approved Documents Certification is submitted to Council falsely stating that works comply with the approved plans, documents and or conditions of the Decision Notice. Public amenity trees are defined as any tree located within public streets, parks or areas that will become publicly owned as a result of this development. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 5 of 7 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image2.png (image text)] 0-0) ee Le _ one PROPOSED BUILDING FFL 109.30 eum STREET
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0043Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
- DOCX
No other editions are linked here.