LANDSCAPE SPECIFICATION
In addition / further to, the Landscape Specification that follows, please refer to Landscape Detail Drawing Sheet series. In addition refer to Relevant Local Council details and specifications where
required and referred to in the documentation.
Related Documents:
The landscape documentation is to be read in conjunction with:
Architectural Documentation by: Biscoe Wilson Architects
© Civil, Hydraulic and Structural Engineering Documentation by:
CARDNO (QLD) Pty Ltd

Construction Review and Certificates

The Contractor shall give the Landscape Architect forty-eight hour's notice of any review period.

In addition to normal review of Works identified in each section of the specification, the Landscape Architect shall be required to review the following key points:
a) Setout of lawn & garden per plans

b) Landscape Drainage works

c) Soil placement and augmentation

) Plant Setout prior to planting

e) Practical Completion and defects review

f) Completion of defects

g) On-Maintenance

h) Off-Maintenance

All structural, hydraulic, electrical etc. work is to be Certified by a registered testing authority / engineer where required,

The Contractor shall seek confirmation of inspection points which are to be nominated by the appropriate engineer prior to work commencing.

Landscape Procedures
Co-ordination with all other trades is required with regards to Buildings, utilities, paving, walls, lighting, irrigation and water supply by others, etc.
The Contractor is to:
- provide erosion and sediment control measures to any disturbed areas
caused by landscape works.
- carry out trimming of any disturbed areas caused by landscape works.
- implement dust control measures to disturbance caused by landscape works,
= remove soil and other debris from roadways at the end of each day.
= remove all waste from site. Bins to be provided by Contractor.
- develop a traffic control plan and implement as required.
- take all necessary precautions for the safety of the public, the Contractor's
employees and conform to all of the regulations as required by The Workplace
Health & Safety Act 1995 and all subsequent amendments.
Samples
The contractor is to provide samples of Plant Material, Mulch, Timber Edging & Chipseal Pathways for approval by the landscape architect prior to construction.
Defects Liability Period
The defects liability period for the hardscape items is 26 weeks following Practical Completion

EARTHWORKS

Services. Verify and mark the location of services on site and on the road reserve prior to commencement of Landscape Works. Do not excavate by machine within 1m of underground services.
Where main line gas mains or similar exist contact the relevant service provider to arrange for a spotter to be on site during excavations.

Existing sub-grade in planting areas . Test subsoil drainage to all tree planting positions and planting areas. If necessary excavate under tree planting position down through impermeable material
toa permeable sub-grade depth, removing excavated material from site and replacing with a porous material and suitable growing medium for nominated species. Settle backfill to prevent
subsidence.

Earthworks, Finished Levels and Grades . Construct finished grades to the finished levels shown on the civil drawings. Footpaths, turf and garden beds are to generally follow standard Council road
reserve profiles, Ensure positive drainage away from buildings, on planted areas and pathways to drainage collection points as indicated on the drawings. Ensure a maximum grade of 1:4 to all
planted and 1:6 for turfed areas. The Landscape Contractor shall be required to undertake trimming of bulk earthworks profiles as necessary to blend garden topsoil to edges and achieve required
turf profiles. Trim surfaces as required to allow finished surface levels of hard and soft scape works to merge with finished surfaces of existing services pits, chambers, kerbs and pavements installed
by the Civil and Services Contractor(s). Co-ordinate with Civil and Services Contractors. Notify the Superintendent prior to installing works if apparent inconsistencies landscape levels are apparent in
previously installed hard elements.

Upon handover from the Civil Contractor, the Landscape Contractor shall maintain and be responsible for;

= carrying out trimming and restoration of any disturbed areas or damaged civil works caused by the landscape works

= implement dust control and erosion control measures to disturbances caused by landscape works

= remove soil and other debris from roadways at the end of each day

= remove all waste from landscape works from the site, provide bins

Subsoil Drainage: Install subsoil drainage to all planting areas enclosed by masonry or concrete, and where shown elsewhere on the Drawings. Drainage to be 100 @ corrugated, perforated
polyethylene pipe, class 400 to AS2439, in 300mm wide trench backfilled with 20mm @ crushed drainage aggregate. Wrap trench with geotextile filter membrane. Ensure positive fall on pipes and
connection to stormwater system. Ensure that all retaining walls have sufficient drainage - refer to structural engineer's drawings.

Drainage Pits: Refer to Hydraulic and Civil Engineering documentation for further details.

Geotextile Filter: Permeable polypropylene or polyester fabric capable of retaining 0.25mm particles. Install, where indicated on Landscape Details & Specifications. To AS 3705.

Topsoil. Install imported topsoil or improved site topsoil to planting and turf areas to comply with AS4419 - 2003. Topsoil shall be an organic soil with a maximum 30% screened composted organic
matter, hydraulic conductivity 15 to 30 cm/hr, and pH range 5 to 6.5.

Site Topsoil Augmentation: Augment site topsoil to depths detailed for turf or massed planting beds as below.

1, Turf and Planting Bed Soil Augmentation:

For Tendering Purposes, allow the following:

Apply preplanting application of Nutritech Solutions Cal Mag Lite to soil per Manufacturers recommendations. Use a granular product which will provide some slow release and some fast release
product. This is preferable to using a fine grade product which would give a sudden ‘shock’ to the soil. Incorporate dolomite to a minimum depth of 100mm _ prior to turfing. To maximise effect apply
dolomite as early as possible before planting. Broadcast Nutristore Gold at 100gm per square metre and incorporate into the top 300mm of soil before planting or 100 mm before turfing.

2. Massed Planting Beds and Street Trees Fertilising:

Planting fertilizer. Trees, shrubs and groundcovers to receive slow release fertilizer, Osmocote Plus 5-6mth at 50% of recommended dosage at the time of planting. Mix thoroughly into the soil,
including tree hole backfill. Trees in containers of 45 litre or greater are to have their planting holes dug into the subsoil twice the diameter of the rootball. Augment the backfill soil with dolomite and
Nutristore Gold as per rates above.

End of Establishment Fertilizing:

Apply a second application of Nutristore Gold at the end of the 26 wks Establishment Period and water in thoroughly.

Organic Mulch. Install 25mm Grade Hoop Pine Bark Mulch to all planting areas, as indicated on the Landscape Plan. Mulch layer to be 100mm settled depth, free from soil, weeds, and deleterious
materials such as rock, soil or rubbish. Finish mulch 25mm below all adjacent surfaces.

Fertiliser (Planting Areas). Apply Nutristore Gold per Manufacturers Recommendations to all plants at time of planting, Apply the required amount evenly around the root ball prior to back filling in
accordance with the manufacturer recommendation and recognised horticultural practice.

Planting areas: Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back filling with topsoil and/or fill material to a depth of 300mm. Remove stones exceeding 50mm @

EDGING

Install Timber edge where shown on the Landscape Drawings and as detailed.
Edge Type 1: Dimensions as per Landscape Detail.

TOPSOIL AUGMENTATION AND IMPORTED TOPSOIL

1. In general, The specification for imported topsoil and the augmentation of the existing site topsoil and sub-grade is per the recommendations by Nullabor Prevention: Contact Bill Wilcock
0419680749. The contractor is to allow for contract and payment

2. Planting Area Topsoil Depth - 300mm.
3, Lawn Area Topsoil Depth - 200mm
PLANTING PROCEDURES
Planting for street trees and shrubs should be completed in one continuous operation as outlined below.
1. Stake out tree locations or setout shrub plantings for review and approval by Landscape Architect.
Adjust for any conflicts with utilities etc.
. Excavate pits for trees or shrubs.
. Pit sizes - Width is 2 x Diameter and Depth is Height of Rootball + 200mm.
Set tree plumb and at the appropriate elevation, allow for settling with adjudicated topsoil lightly
compacted. Set shrubs and face in visually cohesive groupings.
. Backfill with adjudicated top soil in layers to avoid air pockets. Lightly compact and water
settle in layers.
. Construct temporary earthen watering basins and water regularly until irrigation is installed.
. Stake trees - stakes are to be vertically driven to uniform heights. Ties are to be
at uniform heights.
PLANT MATERIAL
General: The Contractor is to ensure that plant material is well established, free from disease and pests, of good form consistent with the species or variety specified, have a large healthy root
systems, with no evidence of root curl, restriction or damage. Any pruning scars shall be clean cut to leave little or no protrusion from trunk or branch.
Inspection: The Landscape Contractor is to allow for all plant material to be inspected by the Landscape Architect at a single nursery prior to delivery to site. At this time, any plants considered not
suitable or not meeting the schedule will be rejected and replaced at no charge to the client. 48hr notice is required of stock inspections. The nursery is to be within 100km of site. Generally all shrubs
and trees sizes noted on the plans and in schedules are minimum required height! width.
Hardening off: All plant stock shall be hardened off in open areas to receive a minimum of 75% full sun 6 weeks prior to delivery to site. Watering and fertilising procedures shall be reduced for a
similar period to aid the hardening off process.
Trees: Ensure that trunks and branches of all plants are free of dieback, cavities, sunburn and secretions. Trunks and branches are to be evenly tapered and textured typical of the species. Plant
material is to be mature enough to support itself without staking. Branches should be evenly distributed to exhibit a well formed canopy that occupies a minimum 1/3 of the overall current plant height.
Foliage shall be evenly distributed across the crown on proportion to the branching structure and be of a true colour typical of the species, density and a good size. All tree stock ( 25It and above ) is

to conform with the criteria outlined in NATSPEC Guide: Specifying Trees, Trees shall be pruned in accordance with AS 4373; Pruning of Amenity Trees, Provide nursery certification by a qualified
Arborist.

Pre-planting Handling: Plant material handling is important. The plant material must be monitored and not allowed to dry out while in storage. Bring only the plants that are required for that particular
days setout to the area to be planted, Delivery and handling of plant material is critical to prevent rootballs from drying out and experience has shown that once the plant material has become
stressed the recovery time can be lengthy effecting the quality of the job, THE CONTRACTOR MUST HAVE A WATER TANK OR OTHER WATERING SOURCE AVAILABLE DURING ALL
PLANTING OPERATIONS TO MAINTAIN ROOTBALL MOISTURE LEVELS,

EXISTING VEGETATION

Trees to be Retained: Mark trees and shrubs to be retained with suitable non-injurious, easily visible and removable means of identification. Tags to be 100 x 50mm zincanneal tags, painted yellow
and lettered according to the tree numbering system on the drawings. secure the tags using loose galvanised steel wire bands All fencing and protection is to be in accordance with AS4970 (2009).
Protection and repair: Protect trees and shrubs to be retained from damage, including those beyond the site area, both above and below ground, Repair any damage to the trees during-this.work,

ON

a

No

Tree Enclosures: Provide temporary protective enclosures or guards to the tree drip line of all vegetation to be retained Enclosure to be four (4) strands of fencing wire or a plastic snesh bafiey N S$ H | N

supported on star pickets spaced at no more than 4000mm spacing.

Work Near Trees: The areas within the dripline of the trees are to be kept free of construction materials and debris. Do not place bulk materials and harmful materials under or neat trees. Do not
place spoil from excavation within this area. Prevent wind-blown materials such as cement from harming trees and plants. Prevent damage to tree bark. Do not attach stays, guys and the like to

trees. Do not remove topsoil from, or add topsoil to the areas within the dripline of the trees. If excavation is required near trees to be retained, a suitably qualified arborist is to be present on site 4 1

provide advice. Open up excavations under tree canopies for as short a period as possible. Use hand methods to locate, expose and cleanly remove the roots on the line of excavati PW
necessary to excavate within the dripline, use hand methods such that root systems are preserved intact and undamaged. Do not cut tree roots exceeding 50mm in diameter. Wher necBssary
to cut these roots, use means so to not unduly disturb the remaining root system. Immediately after cutting, apply a bituminous fungal sealant to the cut surface to prevent the incursion of rot or
disease.

é
0

PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE COAST
‘sz BLACK STREET
aLownons, aL0 ast
ASTRAL

Tn Sassi

F en seen

is protected by Copyright and Intellectual

PLACE Design Group

construction o certification purposes,

PROJECT

CENTRE

CLIENT

LIMITED

NOTES

399

‘© PLACE Design Group Ply Ltd A.C.N.082 370 063

‘Ainformation displayed, transmitted or carried within this drawing

Property tows

‘Tho information contained inthis documentis confident
Recipients ofthis document are prohibited fom disclosing the
information herein to any person without the written consent of

Annotated dimensions take precedence over any moasures of
seal, Very all dimensions on ste prirto constuction

This drawing may cisplay with permission a combination of
specialist and other consultants) input and line wok

Nominated specialist and consultant information contained within
this documentis referenced frm their suppliod documentation and
is contained in this document as indieatve only and not fer

ELYSIUM COMMUNITY

AV JENNINGS PROPERTIES

E COAST REGIONAL COUNCIL
\PPROVED

18 JAN 2012

v4

6

 

Backfill to excavations near tree roots with a mixture consisting of 3 parts by volume of topsoil and 1 part of well rotted compost with a neutral pH value, free from weed growth and harmful materials.
Place the backfill layers, each of 300mm maximum depth compacted to a dry density, similar to that of the original state. Do not backfill around trunks to a height greater than 300mm above the
original ground surface. Immediately after backfilling thoroughly water the root zone surrounding the tree. Do not compact the ground under trees - if compaction occurs, give notice and obtain
instructions, Water the trees as necessary, including where roots area exposed at an ambient temperature > 35°C.

ESTABLISHMENT & MAINTENANCE

General: The Landscape Contractor shall establish and maintain works for a period of thirteen( 26) weeks during which make good defects after the issue of the Certificate of Practical Completion by
the Landscape Superintendent. Maintain accepted horticultural practices, as well as rectifying defects that become apparent in the works under normal use. Rectify any of the contract works that are
damaged or destroyed unlawfully by others until the end of the defects liability period being thirteen (26) weeks. Provide status briefing at Practical Completion to on-site maintenance staff who will
take responsibility for ongoing maintenance from the Landscape Contractor

Commencement: The planting establishment period commences at the date of practical completion and shall continue for a period of /13 weeks. The on-maintenance period commences at the date
of practical completion and shall continue for a period of 26 weeks.

Planting Areas:

The Landscape Contractor shall throughout the planting establishment / maintenance period continue to carry out current works of a maintenance nature including but not limited to watering,
weeding, fertilising, pest and disease and weed control, planting replacements, pruning and the like.

The initial watering program subject to rainfall events is to be as follows:

Week 1-2: 3 times per week

Week 3-6: 2 times per week

Week 7-26; 1 time per week

Replace any plant that has been planted by the contractor, which dies from any cause during the planting establishment period. Plant replacement shall be of equivalent size and species as detailed
in the plant schedule. Weed banks, tree planting sites, seeded and grassed areas regularly and as necessary to leave in a clean and tidy state.

Fertilising:

Fortnightly - Folia Feed with KFF Folia by Nutritech Solutions per Manufacturers Recommendations

After 12 weeks - Apply Nutristore Gold per Manufacturers Recommendations

Mowing Regime:

Issue] cone] ISSUE DESCRIPTION
P| PRE

P2 | ca

"REVIEW & COORDINATION
(OP WORKS APPROVAL

RE. Fray | GA Gaunt FOV

 

 

BY are
x [ns | 30002017
we [us | 22102001

 

Tench | COW Ceaaeion

and organic matter exceeding 25mm @ brought to the surface during cultivation. Remove any materials detrimental to plant growth. Spread Organic mulch to a settled depth of 100mm. Planting in all | | | ; | DRAWING TITLE

planting areas is to be spread evenly across the area giving a uniform plant density, Staking: Use new unpainted 1800mm x 50mm x 50mm straight hardwood, embedded a minimum 600mm into the Turf areas should be kept neatly trimmed to a maximum height of 20mm above the sod layer. Mowing should be carried out at regular intervals to ensure the turf is kept at the desirable level. The

soil, and no less than 450mm apart. Stake all plants supplied in 25 L containers and above. Position two stakes equidistant from the plant centre, well away from the rootball, and in line with the mowing regime should respond to weather conditions and itis expected that areas will need to be maintained on a weekly basis during the growing season and either fortnightly or monthly during LANDSCAPE NOTES
prevailing wind directions (or Tri-Stake as required). Secure the tree with suitable lengths of non-abrasive material, such as approved _hessian tape , looped in figure-8 pattern around the trunk. dormant periods depending upon the prevailing weather conditions.

Monitor ties for trunk damage or tie breakage during establishment and remove stakes and ties at the completion of establishment unless directed otherwise. Removal of Weeds, Debris and Rubbish :

Turf areas: Cultivate subgrade of all planting areas to a minimum depth of 150mm prior to back filling with topsoil and/or fill material to a depth of 100mm. Remove stones exceeding 50mm @ and The Contractor shall be responsible for ensuring that all site rubbish including plastic planting pots and bags, are removed by environmentally approved practices from all areas,

organic matter exceeding 25mm @ brought to the surface during cultivation. Remove any materials detrimental to plant growth. Lay Zoysia 'Nara! turf rolls parallel with contours where possible, Final Inspection: coeaneNT : t ‘ig

stagger joins, and lightly tamp down following laying and roll on completion. Toptress wil ebatse Sand as nscessary 10 remove undulatons, fi Joints nal the IS, Tur areas aresto nave. amininlia At the completion of the establishment / maintenance period, the final inspection shall be held. If all or certain portions of the work are not acceptable under the terms and intent of the drawings and aN

sean ae towards drainage infrastructure. Ensure al tur areas are well drained. Water immeciately following installation, until the topsol is moistened fo its full depth. speaicions) the establishment / maintenance vedal it the works ‘shallbe extended until the defects work have been corrected and the work accepted by the Landscape Architect. : Saal ie

The Contractor is to insure all surfaces have positive drainage slope away from the building and to drain points as shown on plan. Connections, piping and outfall per Hydraulic Engineer.

CHIPSEAL PATHWAYS

Chipseal Pathways to be constructed on Road Base per Bush Mates Coloured Bitumen - River Rock Stone Finish SHEET NUMBER REVISION
Contact: John Espig (Mobile: 0409 200 206) 001 P2

 
Full text of the other 15 pages

Page 2

 

 

ELYSIUM, NOOSA

 

COMMUNITY CENTRE - Plant Material Selection List

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Code Botanical Name Common Name Size Quantity Code Botanical Name | Common Name Size Quantity
Trees & Palms Shrubs
ARC 200_ | Archontophoenix cunninghamiana Bangalow Palm 200L 15 ALP cae Alpinina caerulea Native Ginger 200mm 75
ARC cun_ | Archontophoenix cunninghamiana Bangalow Palm 100L 3 BAN rob __| Banksia robur Swamp Banksia 200mm 175
ACM hem | Acmena hemilampra Blush Satinash 45L 5 CAL EN Callistemon ‘Endeavour’ Endeavour Bottle Brush 200mm 57
BRA ace _| Brachychiton acerifolius Flame Tree 200L 4 CAL GBF | Callistemon ‘Great Balls of Fire’ Great Balls of Fire 200mm 105
CAL vim | Callistemon viminalis Weeping Bottlebrush 45L 5 CAL U Callistemon ‘Little John' Little John 200mm 219
CAS gla Casuarina glauca Swamp She-Oak A45L 16 COR rub | Cordyline rubra Red and Green Varieties 200mm 141
CUP ana__ | Cupaniopsis anacardioides Tuckeroo 200L 26 MEL CT Melaleuca linariifolia ‘Claret Tops’ Claret Tops 200mm 30
ELA 400 _ | Elaeocarpus eumundi Eumundi Quandong AOOL 2 MEL aff Melastoma affine Blue Tongue 200mm 215
ELA eum _ | Elaeocarpus eumundi Eumundi Quandong 200L 5 MET FF Metrosideros ‘Fiji Fire’ Fiji Fire 200mm 54
ELA ret Elaeocarpus reticulatus Blueberry Ash 100L 4 SYZ AC Syzygium australe'Aussie Compact’ Aussie Compact 200mm 391
EUC rob _ | Eucalyptus robusta Swamp Mahogany A45L 4 SYZ cas Syzygium cascade Cascade Lilly Pilly 200mm 188
EUC sR __ | Eucalyptus ‘Summer Rea! Summer Red Flowering Gum | 45. 4 WES fru | Westringia fruticosa ‘Zena’ Dwarf Westringia 200mm 156
LOP con Lophostemon confertus Brush Box A5L 24 XAN LP Xanthostemon verticillatus ‘Little Penda' Little Penda 200mm 35
MAC tan_ | Macaranga tanarius Blush Macaranga 45L 11
MELell | Melicope elleryana Pink Flowering Corkwood — | 100L 18 Code Botanical Name Common Name Size Quantity
MEL 100 | Melaleuca quinquenervia Swamp Paperbark 100L 43 Grasses & Strappy Plants
MEL qui | Melaleuca quinquenervia Swamp Paperbark A5L 26 ACR spe | Acrostichum speciosum Mangrove Fern 75mm 25
SYzZ 100 _ | Syzygium australe ‘Hinterland Gold’ Hinterland Gold Lilly Pilly 100L 19 BAU art Baumea articulata Jointed twigrush 75mm 40
SYZ HG Syzygium australe ‘Hinterland Gold' Hinterland Gold Lilly Pilly A5L 3 DIA BR Dianella caerulea ‘Breeze’ Breeze 140mm 115
SYZlue | Syzygium Iuehmannii Small Leaved Lilly Pilly 100L 19 HYM lit | Hymenocallis littoralis Spider Lily 140mm 344
WAT flo | Waterhousia floribunda Weeping Lilly Pilly 200L 8 LOM KB ___| Lomandra hystrix ‘Katie Belles’ Katie Belles 140mm 380
LOM TB Lomanara hystrix ‘Tropic Belle’ Tropic Belle 140mm 410
LOM lon _ | Lomanara longifolia Spiny-headed Matt Rush 140mm 617
Code _| Botanical Name Common Name Size Quantity
Groundcovers
HIB sca Hibbertia scandens Snake Vine 140mm 985
MYO ell | Myoporum ellipticum Boobiala 140mm 699
TRA var Trachelospermum jasminoides 'Variegata' | Variegated Jasmine 140mm 170

 

 

 

 

 

 

 

 

 

opw 1103599

 

SUNSHINE COAST REGIONAL COUNCIL
APPROVED
18 JAN 2012

¥

 

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT
SUNSHNE COAST
‘Vis? BLACOK STREET
‘caLounra auD 81
AUSTRALIA

Tn so951
F on seaern

‘© PLACE Design Group Ply Ltd A.C.N, 082 370 063

Allnfrmaton splayed, transmitted or carried within this drawing
Is protectod by Copyright and intelectual Property lows,

The information contained in his documentis confidential.
Recipients of tis document are protibited from disclosing the
inferration herein to any person without the writen consent of
PLACE Design Group,

‘Annotated dimensions tke precedence over any measures of
seae, Vey all dimensions on ste prior to construction

‘This drawing may display wth permission a combination of
specialist and other consultant{s) input and linawork,

Nominated specialist and consultant information contained within
this doeumentis referenced from ther supplied documentation nd

is contained in ths document as indicative only and not for
construction or eartfaton puposes.

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

Issue issuevescriPrion | By are
Pi_[ PRE | REVIEW 8 COORDINATION | KH |S | 90002011
P2 [ca | oPworKsapproval | KH | ms | 22 tao

Te

DRAWING TITLE

PLANT SCHEDULES

DESIGN Ms.
DOCUMENT : KH, MS
PROJECT : AVJ15
SCALE

SHEET NUMBER: REVISION

600 P2

Page 3

 

wR OF

‘
_ — mw
ee ell
— ia]
we

    
  
 
  
 
  
 
 
  
  
    
   
  
     
  
  

PLACE

% PLANNING
DESIGN

W —w —w —_. ENVIRONMENT
"9 wy wy iy
W Ww ‘SUNSHINE COAST

n @@ ve W ——W anoeuucecx steeer
daeurora cud et
sisreata

|... T on 54398166

Fay sear

‘© PLACE Design Group Pty Ltd A.C.N. 082 370 063

|
|
|
|
|

—wW —w —w

 

Allnformation displayed, transmitted or carted within this drawing
is protected by Copyright and intellectual Property laws.

‘The information contained in his document is confidential
Recipients ofthis document are protitited frm disclosing the
information herein to any person without the writen consent of
PLACE Design Group.

Annotated dimensions take precedence over any measure of
scale. Very all mensions on site prior to constuction.

“This drawing may display wih permission a combination of
specialist and othor consultants input and linewok

Nominated specialist and consutant information contained within
this document is referenced ftom their supped documentation and
is contained in this document as indicative only and not for
constructon or cortfication purposes,

PROJECT
ELYSIUM COMMUNITY
CENTRE
N CUENT
LANDSCAPE ROCK ° =
RETAINING WALL TYPICAL = = AV JENNINGS PROPERTIES
\ ey REFER DETAIL 21902 = LIMITED
\ =
= NOTES

 

120

SUNSHINE COAST REGIONAL COUNCIL
LANDSCAPE ROCK APPROVED

2] GARDEN BED
|] TURF - ZOYSIA NARA’

 

 

 

 

 
 

   

 

 

 

 

   

 

  
 
   

   

 

   

   
   

 

REFER DETAIL 2602 | aa
WA) s COLOURED CONCRETE
\ OPW 1 1 0 5 g 9 1 8 JAN in é . BY ARCHITECT
& . CERAMIC PAVING
7 e BY ARCHITECT
S | g CHIPSEAL PATH
a be BOULDER WALL.
at a NOM DIAMETER 300-500mm
my) a GRAVEL SWALE
CANDSEABE ROR WALL TIE-INS TO MATCH & | z REFER NOTES FOR DETAILS
RETAINING WALL TYPICAL BOULDER WALL n FF rr er :
REFER DETAIL 200d REFER DETAIL SHEET = A —
246701-011(C) |
WALL TIE-INS TO MATCH ee
BOULDER WALL BOULDER WALL PER [\y
REFER DETAIL SHEET CIVIL CONTRACTOR |,
246701-011(C) eee
BOULDER WALL PER \ 4 $
ECR Wee + | isug[cone] _ssvevescurnon [or om] owe
— ~ — [on | orwens weno [or [us [va

ic

\\
i

  
       
 

 

|
iW

 

     
  

KITCHEN
cre
A17.08m2

 
 

10# L33HS SNIOP

   

BREAK Priminayy | GAs Gouna Approval | T- Tender | CON. Cenebon
aia? DRAWING TITLE
GRADING & DRAINAGE
PLAN
DESIGN Ms ve

DOCUMENT : KH, MS
PROJECT AWSI5
SCALE 1:200 @ A3

rage eee

SHEET NUMBER REVISION
401 Pt

 

 

 

Page 4

 

 

    
 
  
  
  
     
       
     
     
   
  
  
  
 
 
  
 
 
 
  
 
         
   
  

JOINS SHEET HOt *

THO PLACE
PLANNING
DESIGN
ENvinonMent

rt
Ton seosiss
F an Sener

‘© PLACE Design Group Ply Lid A.C.N, 082 370 083,

  

Allnformation displayed, transmitted or catied within this drawing

po
LANDSCAPE ROCK Is protected by Copyright and intelectual Propet laws,

RETAINING WALL TYPICAL.
REFER DETAIL 2/902

‘The information contained inthis documents confidential
Recipients of his document are prohibited from disclosing the
information herein to any person without the writen consent of
PLACE Design Group.

AGI DRAIN TYPICAL
REFER DETAIL 3/902

Annotated dimensions take precedence ove any measure of
Pahiggpabe patie ered My

‘This drawing may display with pomission a combination of
‘specialist and other consultants) input and linework,

Nominated specialist and consultant information contained within
this documents referenced from thei supped documertation and
is contained in tis document as indicative only and not for
construction of certfcation purposes.

IMBER GARDEN'EDGE | Ae PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

AGI DRAIN TYPICAL
REFER DETAIL 3/902

GARDEN BED
TURF - ZOYSIA ‘NARA’

GARDEN EDGE

COLOURED CONCRETE
BY ARCHITECT
CERAMIC PAVING

BY ARCHITECT

CHIPSEAL PATH

BOULDER WALL

NOM DIAMETER 300-500mm,
GRAVEL SWALE.

REFER NOTES FOR DETAILS

 

CHIPSEAL PATH PER MANUFACTURER
BUSH MATES COLOURED BITUMEN

     

   
 
  

   

 

 

 

 

RIVER ROCK STONE FINISH
wseve[cooe] weve oescnrin | ar Jom] ome
Pr [ca | OP WORKS APPROVAL | [ws | zenv zon
_ we
ee
RR

CHIPSEAL PATH PER MANUFACTURER _—_ ga

BUSH MATES COLOURED BITUMEN wo RS

RIVER ROCK STONE FINISH —_ eR

se
Le"
er
spe
En
wae
Le
ee
ee
eT
_ aee™ TCA Came RT TT SO
eo DRAWING TITLE
ee
Le SUNSHINE COAST REGIONAL COUNCIL GRADING & DRAINAGE
se PLAN
a APPROVED .
we ; DESIGN: MS pein
OPW 1 1 0 3 § a 18 JAN 2012 : DOCUMENT : KH, MS
t PROJECT: AWIS q)
SCALE: 1:200 @A3
ae
—————
SHEET NUMBER REVISION

402 Pt

 

 

 

Page 5

 

  
 
  
  
  
   
 
  
 
 
 
 
 
  
 
  
   
   
 
 
  
 
     
 
 

soS—| PLACE

PLANNING
» al besien
ee: ENVIRONMENT
S ‘SUNSHINE COAST

sna et
eee

 

© PLACE Design Group Pty Lid A.C.N. 062 370 069

‘Allinformaton displayed, transmitted o aod within tis draing
Is protected by Copyright and Intellectual Property laws.

‘The Information contahed in this documents confident
Recipients of his document are prohfited from disclosing the
Information herein to any person without the wien consent of
PLACE Design Group,

‘Annotated dimensions tke precedence over any measures of
scale, Verify all mensions on ste prior to constuction,

‘This drawing may dsplay with permission a combination of
specialist and other consultants) input and tnework,

BOULDER WALL PER x Zw,
CIVIL CONTRACTOR /

Nominatd spcits and constant ormaion contained tin
this documents referenced from ther supa docuretaion and
Is contained in is document as Incaive ory and not or
constuction o certteaton purposes,

PROJECT

ELYSIUM COMMUNITY
CENTRE

‘/ CARDNO CIVIL ENGINEERING SWALE NOTES:
‘fos - SPECIFY P3 FOR ROCK GRADING TABLE
é/ / - CLASS B FOR GEOTEXTILE SPECIFICATION

         
    
 
   

  
  
 

BOULDERWALL

REFER DETAIL SAEET,
7th

POO
nly

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

WALL TIE-NSf0 mse 2

 
  
 
 

if / - SWALE TO BE REVIEWED & CERTIFIED BY
/ CARDNO CIVIL ENGINEER

 

  
 

 

GARDEN BED
=) TURF - ZOYSIA 'NARA’

  

 

 

GARDEN EDGE
COLOURED CONCRETE
BY ARCHITECT
CERAMIC PAVING
BY ARCHITECT
4 CHIPSEAL PATH
BOULDER WALL
/ TIMBER GARDEN EDGE NOM DIAMETER 300600nm
s REFER DETAIL 3/901 GRAVEL SHALE
A REFER NOTES FOR DETAILS
wh
/ *
=
F ROCK GRADING GRAPH
=
f/f ROCK GRADING TABLE GRAVEL SWALE
is Ee REFER TO NOTES & DATA
SHEET THIS PAGE BY CIVIL

 

ENGINEER Kes Se Mail tae Rar he 3

-RETAINING WALL TYPICAL.
. REFERDETAIL 2/902.

 

 
  
  

ISSUE DESCRIPTION _| BY ATE
Pr OP WORKS APPROVAL | KH [S| zat12011

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

eter Note Nek

20# L33HS SNIOF

 

DRAWING TITLE

 

 

 

 

SURFACE FINISHES PLAN

DESIGN MS

DOCUMENT : KH, MS

PROJECT: AVIS

SCALE: 1:200@A3
———— a

SHEET NUMBER REVISION
403 PI

 

 

 

 

 

 

 

Page 6

 

 
  
    
      
 

PLACE

PLANNING
DESIGN
ENVIRONMENT

‘yO# LASHS SNIOP
40# 133HS SNIOF

SUNSHINE COAST
‘3132 BU.COCK STREET
CaLunoa Cun est

 
 

AUSTRALIA
T@n sess
F fon seaernt

eeeenenedtcaienens
8
—s —s —s -@-s —s —s —5

© PLACE Design Group Pty Lid A.C.N, 082 370 063

‘AlLnformation displayed, transmitted or cried within this drawing
is protected by Copyright and Intalectuel Property laws.

‘The information contained in his documentis confidential
Recipients ofthis document are prohibited from disclosing the
information herein to any person without the writen consent of
PLACE Design Group.

 

 

 

‘Annotated dimensions take precedence over any measures of
scala, Verify all dimensions on sit pric to constuction

This drawing may deploy with permission a combination of
specialist and other consultants) input and linewerk

Nominated specialist and consuitant information contained within
this documents referenced ftom their supplied documentation and
is contained in this document as inca only and not er
construction or cortifiation purposes

PROJECT

ELYSIUM COMMUNITY
CENTRE

  
  

o : LANDSCAPE ROCK
sh b 3,747 RETAINING WALL TYPICAL
—~L REFER DETAIL 2/902

: $ a,

/ CLIENT

/ AV JENNINGS PROPERTIES
/ | LIMITED

/ € NOTES

/ GARDEN BED
TURF - ZOYSIA ‘NARA’
GARDEN EDGE

 

 

 

 

 

 

 

 

 

OcK / COLOURED CONCRETE
ara NSgAPe ROCK ENSURE AGI PIPES ARE GERAIS PAUING
/ DAYLIGHTED AND BY ARCHITECT
PROVIDE 800x1000mm [2] CHPSEAL PATH
/  AREAOF 100mm@ RIVER BOULDER WALL

NOM DIAMETER 300-500mm
GRAVEL SWALE
REFER NOTES FOR DETAILS:

    
  
    
 
 

/ PEBBLES TO OUTFALL

 

 

ENSURE AGI PIPES ARE
DAYLIGHTED AND
PROVIDE 800x1000mm
AREA OF 100mm@ RIVER |
PEBBLES TO OUTFALL &

SUNSHINE: COAST REGIONAL COUNCIL sie oe apwomeemoa fer fas [a
APPROVED

opw 110499 18 JAN 2012

 
 

VK IRS

  

 

 

 

 

 

 

 

 

 

 

LL IR — IRR— IRR— IRR— IRR— IRR— IRR— ff fa

Ss

Ss

a Cane TT
DRAWING TITLE
SURFACE FINISHES PLAN
DESIGN =: MS. mm
DOCUMENT : KH, MS
PROJECT : AWI15 <P

pR—— RR BR SCALE —-: 1:200@A3

aR BR

— eR Sl
.—— IRR’ ‘Smenes

alee
RR me SHEET NUMBER REVISION
eee 404 Pt

 

 

 

Page 7

PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE coast

WoW ay ey ey sma
w w \ Pen Ha
Wy ey ly an sacar
" Wow " %

Woy ay w

© PLACE Design Group Pty Lid A.C.N, 082 370 053,

‘Alinformaton displayed, transmitted or cared within this drewing
Is protected by Copyright and Intellectual Property laws,

The information contained in this document is confidential
Recipients ofthis document are prohibited from disclosing the
infermation herein o any person without the writton consent of
PLACE Design Group.

Annotated dimensions take precedence over any measures of
sca. Very all imensions on site prior to constuction,

This drawing may display wth pemission a combination of
specialist and other consultants) input and linawork,

Nominated specialist and constant information contained within
this documentis referenced ftom their supplied documentation and
is contained in this document as indicate only and not or
construction o crtification purposes,

PROJECT

ELYSIUM COMMUNITY
CENTRE

CUENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

    

SUNSHINE COAST REGIONAL COUNCIL
PPROVED

3
OPW, 11 0/39 8 18 JAN 2012

¥ZI0°

2 oe) Se
z= —

1s8ue| cove| m OATE
iS | s0002001
us | ina0

P|

JOINS SHEET 603

|

   

inary | Gk: Coane Raval | TTandee |

DRAWING TITLE

TREE PLANTING PLAN

DESIGN Ms a

DOCUMENT : KH, MS
PROJECT : AWJ15
SCALE 1:[email protected] SHEET 602 ee ! a |

a

x = : a ‘ XN
x ei sere maranceareeemnmnemsainnnsits ee
Se & oe SHEET NUMBER REVISION

i oo 7 ' ben = i ‘\ : 604 P2

 

JOINS SHEET.602-

were

Page 8

 

 

 

 

 

 

Ny :
\ Yd. ee,
PB \
. -.
pay -
es
~ba >
NaH fs
Pe /
PTS: J
be A! J
be Py me
eR fi
. = 0"
eave S eG
y
PX. 7
=P
WINK
bf

Re

 

Stage No
MAL
a. 4- BAe cl

we

4-6 GL

 

 

 

 

  
 
  
 
 
  
   
    
  
 
 
 

. % a
me 4

a 1 Acm HEN
-? ey e .
“ > beew HEA

    

a,

\
\
BSN
Ye
Ny
as Ne
ae
_—

3- BY2 KG

St.

&

2 MEL loo ot i

 

 

 

Y

Cy

ty

Oh fl i aah
Ze a
ea # -
ia er Y

wf
ge ty

oe

_AWET Poo
— B-caL VIM
4.CbeS Sim FMELQUI

 

 

 

4

 

 

 

 

 

 

 

APPROVED
opw 110398 18 JAN 2012

 

SUNSHINE COAST REGIONAL COUNCIL

 

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT
SUNSHINE Coast

‘Vi2 BULGUCK STREET
CALOUNDRA OLD «51

 

‘© PLACE Design Group Ply Ltd A.C.N. 082 370 063

‘Allinformation displayed, transmitted or cried within his drawing
is protected by Copyright and Intallactual Property laws,

‘The information contained in his document s confident,
Recipients ofthis document ae prohibited from disclosing the
Information herein to any person without the wtton consent of
PLACE Design Group,

‘Annotated dimensions tke precedence over any measures of
scale. Verity all mensions on st prir to constuction.

This drawing may splay with permission a combination of
specialist and other constants) input and newark

‘Nominated specialist and consultant information contained within
this documents referenced ftom thee supplied documentation and
‘i contained in ths document as indicative only and not for
constuston or certfcation purposes,

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

tssue|cooe] prion [av ATE

   

Pi xe [ns | 3000 2011

P2 | cA | OPWORKSAPPROVAL | KH [mG | gann2011

TR: Coane Repo | T= Tndar |

DRAWING TITLE

TREE PLANTING PLAN

DESIGN Ms at

DOCUMENT : KH, MS
PROJECT AVJ15
SCALE 1:200 @A3

pe ° —_ - 7 -
eo A el
ge a ee a
wal ae SHEET NUMBER: REVISION
ee 602 P2

 

Page 9

 

   
 
 
 
  
 
 
  
  
 
 
 
 
  
 
  
  
 
 
  
 
 
  
  
 
  

 

¢ PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE COAST
J viszeuoock srecer
a eh

   

© PLACE Design Group Pty Lid A.C, 082 370 083,

‘Allinformation displayed, tronsitted or cared within this crewing
is protectod by Copyright and Intellectual Property ans,

‘Tho information contained inthis document is confident
Recipients ofthis document ara prohibited from cscosing the
information herein to any person without he wrt consent of
PLACE Design Group,

‘Annotated dimensions take precedence over any measures of
FY scale. Very al dimensions on to prior to constuction.

This drawing may display wth permission a combination of
specialist and other consultants) input and inawork,

"Nominated specialist and constant information contained win
this documents referenced from their supped documentation and
is contained in this document as indicative only and not for
construction or certification purposos

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

 

 
 
       

r APPROVED

 

 

 

 

 

E|COAST REGIONAL COUNCIL

3/9 9 18 JAN 2012

 

    

sssue| issueoescrprion _ | By Date
Pi_| PRE | REVIEW @ COORDWATION | KH [WS | 30002017

2 | CA | OPWORKSAPPROVAL | KN | MS | 22112011

Preuiany | GA Gennet Bape | T

DRAWING TITLE
TREE PLANTING PLAN

DESIGN :MS

 

DOCUMENT : KH, MS
PROJECT AVI15
SCALE 2 1:200 @A3
meres
SHEET NUMBER REVISION

 

603 P2

 

Page 10

    

 

S SHEET 601

PLACE

PLANNING
DESIGN
ENVIRONMENT
SUNSHINE COAST

{1192 BULGOCK STREET

‘a0 ast
R

F on sea

  

 

© PLACE Design Group Pty Ltd A.C.N. 082 370 063,

 

 

 

Altinformation displayed, transmitted orcad within ths drawing
Is protected by Copyright and Intellectual Property iw.

 

 

‘The information contained in this document is confidential
Recipients ofthis document ae proibited from disclosing the
information hrein to any person without the writen consent of
PLACE Design Group

 

 

Annotated dimensions take precedence over any measures of
scale, Vey all dimensions on site prior to constructon

This drawing may display with permission a combination of
speciaist and other consultants) input and inework.

Nominated specialist and consultant information contained within
this document is referenced from ther supplied documentation and
is contained inthis document as indicative only and nt for
Construction or cercation purposes,

 

 

 

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

 

 

NOTES

 

 

 

 

 

 

JOINS SHEET 602

 

     
 

RRR RRR RR RR RR RR RR RR RR RR BRR RR RR RR BR

TEA: Gouna peo | Tender | a

| DRAWING TITLE
SUNSHINE COAST REGIONAL COUNCIL

__~--~APPROVED
DESIGN MS “en

opw 110599 18 JAN 2012 DOCUMENT : KH, MS oS

 

TREE PLANTING PLAN

Lee

PROJECT AVIS
SCALE 4:200 @ A3

9.

 

 

 

Q tea og Be me

SHEET NUMBER REVISION.
604 P2

 

 

 

 

 

 

Page 11

 

 

\
Ps
\
%

\ PLACE

 
 
 
  
 
  
  
  
 

 
 

% PLANNING

\ DESIGN

\ Ewvinonnen

% ‘SUNSHINE COAST
Siapeucoce saeer
meee Beer ced
* ?
Wy ay ay \
Woy ay iy — Ny iy ‘PLACE Design Group Pty Lid ACN, 082 370069

 

 

 

‘Alinfration displayed, tronsmited or ceed within this dewing
oo is protectd by Copyright and intelectual Property ows,
—_—_!
"~The formation contained in this dacumentis confident
Recipients ofthis document are probitted from disclosing the
| infrmaton herein to any person without the writen consant of

PLACE Design Group

 

 

 

 

‘Annotated dimensions take precedence over any measures of
scale, Very all mensions onsite prior to construction,

 

This drawing may display with permission a combination of
specials and other constants) input and linework,

C1 a Kayo Ew

Ls aa o> 20 -Cab' ¢

Nomina specialist and consuttant information contained within
this documents referenced frm their supped documentation and
is contained in this document as indicative ony and not for
constueton or certification puposes,

 

 

i a ae 26 Di» wt PROJECT
ELYSIUM COMMUNITY

ere CENTRE

! 25- HiBscr CLIENT
19-CALLT AV JENNINGS PROPERTIES

KN LIMITED

| = | NOTES
& oo -w 6 ; SUNSHINE COAST REGIONAL COUNCIL
8 | poe APPROVED

 

 

199 18 JAN 2012

 

 

| 1 a2 Seah. a
Vi —_—
4o Hay vir 20 ay2cr8

 

 

    
    
 
       
 
  

JOINS SHEET 704=

 

 

 

 

 

t— Jo S42 Clek RUB —
- Bp SYZDCAS

 

 

   
  

av ate

 

 

a | us | soca 2011

 

 

 

wa [ws [221 2007

 

 

 

 

 

 

 \ JOINS SHEET 703

 

\ea

 

 

 

 

aR 4
2%

RI na

CoH. Gaara

TT] DRAWING TITLE
SHRUB PLANTING PLAN

“4 DESIGN =: MS
§ DOCUMENT : KH, MS
PROJECT : AVJ15 <a
SCALE +: 1:200 @ A3

Page ee

  

JOINS SHEET 702

_—— +

 

 

 

 

 

 

— =a ay SHEET NUMBER REVISION
Pe , \ *s Pam 4 " Se 701 P2

 

Page 12

 

=e

a -
JOINS SHEET 791°

 

QI =L_r VE

JOINS SHEET 701 abner
porn
4 [I

 

BE-OSA

1) LOMAT B
B-— BAA Rowe
4O MYo

 

 

eer

—

%

ry

t

_ JOINS SHEET 704

 

 

SUNSHINE COAST REGIONAL COUNCIL

APPROVED

 

opw 110399 18 JAN 2012

“ee

 

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE COAST
et

 

® PLACE Design Group Pty Lid ACN. 082.370 063,

  
 
 

PLACE Design Gr

‘Annotated simon
seal. Verity al i

‘This draing may display wih pe
specialist and other consultants input and linework

 

  
 
 

tant information contained within
ther supplied documentation and
indicative only and not for
construction or cartfiation purposes.

PROJECT

ELYSIUM COMMUNITY

CENTRE

4 CLIENT

| AV JENNINGS PROPERTIES

LIMITED

NOTES

   
     
  

issue| cove rion —_| av ATE

Pi [Pre | Ra jOMATION [KH [ws | 30092017

ra [ca | cPworksarproval [kw [us | za tiaii

DRAWING TITLE

SHRUB PLANTING PLAN
DESIGN Ms om

DOCUMENT : KH, MS
PROJECT AVJ15
SCALE 1:200 @A3

SHEET NUMBER REVISION
702 P2

 

Page 13

 

 

     
     
  
  
   
 
 
 
   
   
    

23

10 MEL ASE
3510m 18

20 -BAN R6O
73-LbMTe

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT

 

‘© PLACE Design Group Pty Ltd A.C.N.082 370 063

Allinfrmation displayed,
Is protected by Copyright

 

ited or cared within this drawing
tollectual Property laws.

 

   

The information cor document is confidential
Recipients ofthis document are prohibited from dscosing the
information herein to any parson without the written consent of
PLACE Design Group.

Annotated dimensions take precedence over any measures of

This drawing may display wth pe
other consultants)

  

PROJECT

ELYSIUM COMMUNITY

-| CENTRE

CLIENT

AV JENNINGS PROPERTIES

a4 | LIMITED

NOTES

 

 

INE(COAST REGIONAL COUNCIL
‘APPROVED

99 18 JAN 2012

 

tssuelcooe]

TGA: Coone Repo | TTT

 

DRAWING TITLE
SHRUB PLANTING PLAN
DESIGN =: MS “a
DOCUMENT : KH, MS
PROJECT: AWI15
SCALE 1:200 @ A3

‘SHEET NUMBER REVISION

 

 

703

P2

Page 14

 

    
     

“Ie CALDEA/ \

PLACE

PLANNING
DESIGN
ENVIRONMENT

plo s¥zcas

   

F gn sea

© PLACE Design Group Pty Lid A.C.N, 082 370 063

  

Information displayed, transmitted or caved within this drawing
rolectd by Copyright and intellectual Property lav.

 

 

 
  
 
  
 
    
  

‘Tho information conti
Recipients ofthis docu
information heroin to an
PLACE Design Group,

 

 

 

 

 

 

Annotated dimensions take preced
seal. Verity all dimensions on

‘This rating may display wth pers
specidlst and other con

Construction or cartcation purposes.

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

    

& a

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ro
&
|
=
|
&
|
|
g
:
|
:
N . |
z g
a al
Ww é BICOL
a |
3 :
3 \
> & {
|
10 Zal BF :
& —_
| s
; So |
|
| DRAWING TITLE
SUNSHINE COAST REGIONAL COUNCIL || SHRUBPLANTING PLAN

APPROVED

3 DESIGN MS

 

a FR

 

 

 

 

a BE DOCUMENT : KH, MS
saene ne opw 1103599 18 JAN 2012 PROIECT : AVJ15
aR ee ix SCALE 1:200 @A3
me i
SHEET NUMBER REVISION

 

704 P2

 

Page 15

 

 

GENERAL NOTES:

ERADICATE WEEDS FROM GARDEN PRIOR TO
CONSTRUCTING BED. ENVIRONMENTALLY ACCEPTABLE
METHODS SHALL BE USED. A NON-RESIDUAL HERBICIDE MAY.
BE APPLIED TO AREAS AFFECTED BY WEEDS.
REGULARLY REMOVE WEED GROWTH THROUGHOUT
PLANTED AND MULCHED AREAS DURING THE COURSE OF
CONTRACT PERIOD. AMEND GROWING MEDIUM TO.

SPECIFICATION

    
 

300

ax GARDEN BED TYPICAL

(G07 1:20 @A3

 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
   
  

 

 

 

 

 

100mm ORGANIC
MULCH LAYER AS SPECIFIED.

300mm DEPTH CULTIVATED AND
AUGMENTED TOPSOIL AS PER
SPECIFICATION NOTES

 

_ 7 RIP SUBGRADE TO MIN 100MM

DEPTH AND GRADE EVENLY
PRIOR TO PLACING TOPSOIL

2.No, 50MM X 50MM HW TIMBER STAKE,
STAKE IS NOT TO PENETRATE
ROOTBALL. PENETRATE MINIMUM
200mm INTO EXISTING SUBGRADE

(2No,) FIGURE '8' NYLON / HESSIAN TIE
STAPLED TO (2No,) STAKE

-———— BERMED SOIL DISH RAISED ON DOWNHILL
SIDE TO FORMA 100MM DEEP BASIN

100mm MULCH AS SPECIFIED. MAINTAIN
MINIMUM 50mm SEPARATION BETWEEN
ORGANIC MULCH AND BASE OF STEM.

FINISHED GRADE

/~2==— GROWING MEDIUM PER SPECIFICATIONS

CONTAINER TREE.

 

GENERAL NOTES:

ERADICATE WEEDS FROM LAWN AREAS PRIOR TO LAYING / SOWING TURF /
‘SEED. ENVIRONMENTALLY ACCEPTABLE METHODS SHALL BE USED. A
NON-RESIDUAL HERBICIDE MAY BE APPLIED TO AREAS AFFECTED BY
WEEDS. REGULARLY REMOVE WEED GROWTH THROUGHOUT TURFED AND.
SEEDED AREAS DURING THE COURSE OF CONTRACT PERIOD. LIGHTLY
TAMP OR ROLL SURFACE OF TURF AFTER INSTALLATION, TO ENSURE THAT
TURF ROOTS ARE IN CONTACT WITH TOPSOIL. TURF ON LOW SIDE OF ANY
PATH OR EDGE TO FINISH 10MM BELOW FINISHED PATH/EDGE LEVEL

TURF AS SPECIFIED

FINISHED GRADE

100MM DEPTH TURF BLEND TOPSOIL
: CULTIVATED WITH LAWN STARTER
=|||= =i | FERTILIZER PER SPECIFICATION
pa ~~ RIP SUBGRADE TO MIN 100MM DEPTH
= AND GRADE EVENLY PRIOR TO PLACING
TOPSOIL

(2, TURF TYPICAL
\Qor7 1:20 @A3

2.No, SOMM X 50MM HW TIMBER STAKE,
STAKE IS NOT TO PENETRATE
ROOTBALL, PENETRATE MINIMUM.
200mm INTO EXISTING SUBGRADE

  
  

4||_ —=—_ (2No.) FIGURE '8' NYLON / HESSIAN TIE
STAPLED TO (2No.) STAKE

“= BERMED SOIL DISH 100MM DEEP BASIN

100mm MULCH AS SPECIFIED. MAINTAIN
MINIMUM 50mm SEPARATION BETWEEN
ORGANIC MULCH AND BASE OF STEM

FINISHED GRADE

 

 

   
       

A
LAT GROWING MEDIUM PER SPECIFICATIONS.
Lx

"7 ~ CONTAINER TREE.

 

 

 

 

 

NOTE: GARDEN EDGE TO BE INSTALLED TO ALL JUNCTIONS
BETWEEN PLANTED AREAS AND TURF AS INDICATED ON PLAN

TURF

REFER TO SPECIFICATIONS

100mm x 25mm ACQ (H5) TREATED PINE
EDGE. FIX TO STAKE USING 2 No. SS.
40mm NAILS PER CROSSING.

;—— 100mm MULCH

REFER TO SPECIFICATIONS
GROWING MEDIUM

=> 75 x 25 x 450mm LONG TIMBER FIXING
STAKE STAKES TO BE AT 1500mm
‘SPACING MAXIMUM, AT CHANGES IN
DIRECTION OR 100mm FROM END OF
BOARD.

| EXISTING SUBGRADE

  
 

 

 

 

 

 

 

aN TIMBER GARDEN EDGE TYPICAL

(oor 1:20 @ A3

SHRUB / GROUNDCOVER SPECIES AS.
PER PLANTING PLAN

CREATE 100MM DEEP WATERING BASIN
AROUND PLANT

100MM ORGANIC MULCH PER GARDEN
BED DETAIL, MULCH NOT TO BE IN

— CONTACT WITH PLANT STEM
8 300MM DEPTH CULTIVATED AND
AUGMENTED SITE TOPSOIL PER TYPICAL
GARDEN BED DETAIL
Z| EXCAVATE PLANTING HOLE 2X WIDER AND

100MM DEEPER THAN ROOTBALL AND
BACKFILL WITH AUGMENTED SITE TOPSOIL

 

 

 

 

 

 

 

 

 

 

TEASE OUT BASE OF ROOTBALL TEASE OUT BASE OF ROOTBALL APPLY SLOW RELEASE FERTILISER TO

PRIOR TO PLANTING PRIOR TO PLANTING BASE OF PLANTING HOLE, USE OSMOCOTE
PLUS 5-6 MONTH AT HALF THE

BACKFILL PLANTING HOLE WITH BACKFILL PLANTING HOLE WITH RECOMMENDED DOSE RATE.
TOPSOIL PER SPECIFICATION TOPSOIL PER SPECIFICATION
EXISTING SUBGRADE AS<<— EXISTING SUBGRADE

CA» TREE IN GARDEN AREA ON SLOPE (8 TREE IN GARDEN AREA TYPICAI 6 \ SHRUB IN GARDEN AREA TYPICAL

901/ 1:40 @ A3 901/ 1:40 @A3 \g0t/ 1:20@ A3
-l\ We KEEP MULCH CLEAR OF STEM

 

LFS SHRUB IN GARDEN AREA ON SLOPE

  
   
   
 
 

75mm DEEP WATERING BASIN

PLANTING HOLE WITH ROUGHENED
EDGES 2X POT DIA. BACKFILL WITH
AUGMENTED TOPSOIL PER
SPECIFICATION

75mm TUBE STOCK - 45L PLANT MATERIAL

 

\g01/ 1:20 @ A3

 

SUNSHINE COAST REGIONAL COUNCIL
APPROVED

opw 110399 18 JAN 2012

 

 

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE COAST
‘MIS2BULGDCK STREET
‘CALOUNORA OUD sat

AUSTRALIA
Toy sass6108
F py Sesser
‘BPLACE Design Group Pty Ltd A.C.N, 082 370 063

‘Allnformation csplayed, ransmited or cried wiin his eawing
{is protected by Copyright and Intellectual Property laws,

The information contained in his documents confidential
Reciionts of his document are prohibited from disclosing the
infertation herein to any person without the written consent of,
PLACE Design Group,

‘Annotated dimensions take precedence over any measures of
scale. Verify all dmensions on sit pric to constuction,

This drawing may ceplay with permission a combination of
specilist and other consultants) input and nework,

Nominated spocalist and consultant information contained within
this documentis referenced ftom thei supplied documentation and
's contained inthis document as indieabve only and not et
‘construction or certfcation purposes,

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

 

 

1ssvue| wssveoescarTion | By oare
Pr_| PRE | REVIeW AGOOROINATION | KH [WS | 02 102017,
2 | ca | cPwoKsapproval [ka | Ms | za1n20n

     

DRAWING TITLE

Tenor | TTandr |

LANDSCAPE DETAILS

DESIGN 2 MS

DOCUMENT : KH, MS
PROJECT =: AWJ15

SCALE AS SHOWN @A3

SHEET NUMBER REVISION
901 P2

 

Page 16

 

 

IGNEOUS STONE BOULDER
WALL . BOULDERS TO BE
ROUNDED NOM 300-500mmDIA_

   
 
  
  
 
    

100mm MULCH AS SPECIFIED
TOPSOIL AS SPECIFIED

SUBGRADE OR
APPROVED BACKFILL

GEOFABRIC AS
SPECIFIED
KEY BOULDERS INTO EXISTING
SUBGRADE MINIMUM 300MM DEEP.

C1» BOULDER RETAINING WALL WITH DRAINAGE

IGNEOUS STONE BOULDER
WALL . BOULDERS TO BE
ROUNDED NOM 300-500mmDIA.

  
   
 
  
   

TOP OF WALL YARIES
100mm MULCH AS SPECIFIED
TOP SOIL AS SPECIFIED

SUBGRADE OR
APPROVED BACKFILL

I= i= i=) “-Georasric as
Ii i SPECIFIED

KEY BOULDERS INTO EXISTING

E SUBGRADE MINIMUM 300MM DEEP

(2 LANDSCAPE ROCK RETAINING WALL WITHOUT DRAINAGE

4:4- 1:3 VEGETATED BATTER:

300MM WIDE DRAINAGE TRENCH WITH 20MM
SCREENINGS. WRAP WITH GEOFABRIC ALL
AROUND, BRING TO SURFACE AND COVER FABRIC
WITH 75MM DEEP SURFACE LAYER OF 25-50MM@

MARY RIVER GRAVEL.
100MM@ AG, PIPE MIN 0.5% FALL

  
 
 
 
 
 
 
 
 

EXISTING GROUND LEVEL

450MM@ PIT PER ENGINEER.
waxoePrHsoomi EE AL
ee a
150MM DISCHARGE PIPE

PER ENGINEER

 
 
     

(3 AGI DRAIN TYPICAL

 

(027 1:40 @ AS

(9027 1:40 @ A3

(9027 1:40 @ A3

 

SUNSHINE COAST REGIONAL COUNCIL
APPROVED

 

+79

 

 

PLACE

PLANNING
DESIGN
ENVIRONMENT

SUNSHINE COAST
‘yuazautooce STREET

caLouNORA c.0 5

USTRALA,

Ten seats

F on separ

© PLACE Design Group Pty Ltd A.C.N, 082 370 063,

Alintrmaton splayed, ransmitedor cared vithin is ring
is pretctodby Copyght and Intaetil Property iw,
Thenfrmaton contained in ths documents confine
Recipients of his document ae prohdted tom desing he
information erin to any person without he writen consent at
PLACE Design Group,

‘Annotated dimensions tak precedence over any measures of
scale Vor all dimensions on site prior to constuction,

This drawing may display wth permission a combination of
specialist and other consultants) input and inowork

Nominated specialist and consultant information contained within
this document i referenced from ther supplied documentation and
is contained inthis document as indicative ony and not for
construction or certification purposes.

PROJECT

ELYSIUM COMMUNITY
CENTRE

CLIENT

AV JENNINGS PROPERTIES
LIMITED

NOTES

  
  

tssue|cove| issu oescapnion | av DATE
Pi_| cA | _OPWORKSAPPROVAL | KH [us | 2211201

PRE Fran) | CA Eanah TT Tender] COW. Combaeion

DRAWING TITLE

LANDSCAPE DETAILS

DESIGN :MS

DOCUMENT : KH, MS
PROJECT : AVJI5

SCALE AS SHOWN @A3

SHEET NUMBER REVISION
902 Pt

 

Used in these records

About this file

File size
17.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans.pdf · 17.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.