Council archive · source document
22-0533_H-101-02-Cover Sheet & Schedules -Stormwater Drainage · OPW24/0017
100mm| 50. 100mm | 50_ | 40_ | 30_ | 20 | 10_ Omm HYDRAULIC SERVICES DRIVEWAY DRAINAGE TO EXISTING RESIDENCE 38 PLOVER STREET, PEREGIAN BEACH, QLD 4573 Lot 12 RP9313 Sunshine Coast Regional Council PROJECT NOTES General Notes 1, THE CONTRACTOR IS OBLIGATED TO INSPECT THE SITE & BE SATISFIED AS TO THE CONDITIONS UNDER WHICH THE WORK WILL BE CARRIED OUT PRIOR TO THE SUBMISSION OF A TENDER OFFER. 2, DO NOT SCALE DRAWINGS, REFER TO ARCHITECTURAL DRAWINGS FOR ALL SET-OUT DIMENSIONS. 3. LAYOUTS OF SERVICE LINES SHOWN ON THE DRAWINGS ARE DIAGRAMMATIC ONLY EXCEPT WHERE FIGURED DIMENSIONS ARE PROVIDED OR CALCULABLE. 4. ALL WORK UNDERTAKEN ON THE SITE BY THE CONTRACTOR IS TO COMPLY WITH THE REQUIREMENTS OF THE WORKPLACE HEALTH & SAFETY REGULATIONS. 5. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL LIAISE DIRECTLY WITH THE APPROPRIATE AUTHORITIES & SHALL ASCERTAIN THE EXACT POSITIONS OF ALL SERVICES. THE CONTRACTOR SHALL NOT WORK NEAR THESE SERVICES WITHOUT THE PERSONAL SUPERVISION OR THE WRITTEN PERMISSION OF THE RELEVANT AUTHORITIES. 6. DATUM FROM WHICH LEVELS HAVE BEEN CALCULATED - A.H.D. Authority Requirements 1, ALL PLUMBING AND DRAINAGE WORK OR ON-SITE SEWERAGE WORK MUST COMPLY WITH THE COUNCILS LOCAL LAWS AND POLICIES AND RELATED DEVELOPMENT PERMIT CONDITIONS. 2. PROVIDE ALL NECESSARY TESTING OF THE SERVICES SHOWN ON THE DRAWINGS AS REQUIRED BY THE RESPECTIVE AUTHORITIES. 3. IF ANY DOUBTS EXIST AS TO WHETHER A SECTION OF THE DESIGN IS ABLE TO COMPLY WITH THE RELEVANT AUTHORITY'S REGULATIONS, THE SUPERINTENDENT SHALL BE NOTIFIED PRIOR TO COMMENCEMENT OF ANY WORKS. NO CONSIDERATION OF CLAIM FOR REDUNDANT WORK SHALL BE GIVEN IF THE SUPERINTENDENT IS NOT NOTIFIED. 4. CONTRACTOR TO ALLOW ALL COST FOR PREPARATION OF 'AS CONSTRUCTED DRAWINGS' PRESENTED TO THE SAME STANDARD AS THE APPROVED PLANS. Minor Works 1. MINOR WORK TO BE INCLUDED. a. PROVIDE MINOR WORKS WHICH ARE REQUIRED, OR MINOR PARTS WHICH ARE NECESSARY, FOR THE COMPLETION OF THE WORK(S) NECESSARY TO PRODUCE A COMPLETE AND OPERATIONAL SYSTEM WITHOUT ADDITIONAL COST TO THE CONTRACT. b. PROVIDE TEMPORARY CONSTRUCTION PHASE DIVERSION WORKS TO MAINTAIN SERVICE AND FUNCTION OF EXISTING OPERATIONAL FACILITIES ON-SITE WHETHER DOCUMENTED OR OTHERWISE. Existing Services 1. NO WARRANTY IS GIVEN TO THE COMPLETENESS OR ACCURACY OF EXISTING SERVICES INFORMATION WHETHER DOCUMENTED OR OTHERWISE. WHERE CONNECTION IS REQUIRED TO EXISTING SERVICES THE CONTRACTOR SHALL ALLOW ALL COSTS TO HIRE OR PURCHASE EQUIPMENT NECESSARY TO VERIFY THE PRECISE LOCATION AND DEPTH OF THE EXISTING SERVICE CONNECTION POINT PRIOR TO THE INSTALLATION OF ANY ASSOCIATED WORKS. 2. _ EXISTING SERVICES HAVE BEEN DRAWN FROM VISUAL INVESTIGATION ONSITE AND ARE INDICATIVE ONLY. CONTRACTOR TO LOCATE, TRACE AND VERIFY BEFORE COMMENCING ANY ASSOCIATED WORKS. 3. ALLOWALL COSTS TO PROTECT AND/OR REPAIR EXISTING RETAINED SERVICES IMPACTED BY CONSTRUCTION PHASE ACTIVITIES. Coordination THE CONTRACTOR SHALL COORDINATE ALL PIPEWORK WITH THE OTHER TRADE SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. 1, PROVIDE COMPLETE COORDINATION WITH ALL OTHER SUBCONTRACTORS AND. THE MANAGING CONTRACTOR. FIT INTO CONSTRAINTS PROVIDED BY ARCHITECTURAL AND OTHER SERVICES ELEMENTS AND REFLECTED IN THE DESIGNED LAYOUT. Cross Reference 1, | THESE HYDRAULIC AND WET FIRE SERVICES DRAWINGS AND ASSOCIATED PERFORMANCE SPECIFICATIONS (IF APPLICABLE) SHALL BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, LANDSCAPE, IRRIGATION, ELECTRICAL AND OTHER DRAWINGS, SPECIFICATIONS, CONTRACT DOCUMENTS AND WITH SUCH OTHER WRITTEN INSTRUCTION THAT MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. Compliance, Standards and Codes GENERAL CODES: a. VOL 2-CLASS 1 AND 10 BUILDINGS b. VOL 3-PLUMBING CODE OF AUSTRALIA - AS/NZS 3500.3 : 2021 Authorised Products 1. | PRODUCTS LISTED IN THE WATER MARK PRODUCT DATABASE, UNLESS OTHERWISE REQUIRED BY THE NETWORK UTILITY OPERATOR. 2. PROVIDE ALL PLUMBING AND DRAINAGE PRODUCTS IN ACCORDANCE WITH THE ABCB WATERMARK CERTIFICATION SCHEME. 3. ANY REFERENCE WITHIN THE SPECIFICATION TO PROPRIETARY BRAND NAMES OR TO A PARTICULAR MANUFACTURED PRODUCT WITHOUT THE USE OF "OR EQUAL" IS TO BE INTERPRETED THAT THE PARTICULAR ARTICLE OR PRODUCT IS THE ONLY ONE TO BE SUPPLIED OR USED. DEFINITION: A PROPRIETARY ITEM SHALL BE ANY ITEM IDENTIFIED BY GRAPHIC REPRESENTATION ON THE DRAWINGS, OR BY NAMING ONE OR MORE OF THE FOLLOWING: MANUFACTURER, SUPPLIER, INSTALLER, TRADE NAME, BRAND NAME, CATALOGUE OR REFERENCE NUMBER, AND THE LIKE. Substitution 1. IDENTIFIED PROPRIETARY ITEMS: IDENTIFICATION OF THE PROPRIETARY ITEM DOES NOT NECESSARILY IMPLY EXCLUSIVE PREFERENCE FOR THE ITEM AS IDENTIFIED, BUT INDICATES THE NECESSARY PROPERTIES OF THE ITEM. ALTERNATIVES; IF ALTERNATIVES TO THE DOCUMENTED PRODUCTS, METHODS OR SYSTEMS ARE PROPOSED, SUBMIT SUFFICIENT INFORMATION TO PERMIT EVALUATION OF THE PROPOSED ALTERNATIVES, INCLUDING; - EVIDENCE THAT THE PERFORMANCE IS EQUAL TO OR GREATER THAN THE SPECIFIED. - EVIDENCE OF CONFORMITY TO THE CITED STANDARDS. - ESSENTIAL TECHNICAL INFORMATION, IN ENGLISH. - REASONS FOR THE PROPOSED SUBSTITUTIONS. - STATEMENT OF THE EXTENT OF REVISIONS TO THE CONTRACT DOCUMENTS. - STATEMENT OF THE EXTENT OF REVISIONS TO THE CONSTRUCTION PROGRAM. - STATEMENT OF COST IMPLICATIONS INCLUDING COSTS OUTSIDE THE CONTRACT, - STATEMENT OF CONSEQUENT ALTERATIONS TO OTHER PARTS OF THE WORKS. AVAILABILITY: IF THE DOCUMENTED PRODUCTS OR SYSTEMS ARE UNAVAILABLE WITHIN THE TIME CONSTRAINTS OF THE CONSTRUCTION PROGRAM, SUBMIT EVIDENCE. CRITERIA: IF THE SUBSTITUTION IS FOR ANY REASON OTHER THAN UNAVAILABILITY, SUBMIT EVIDENCE THAT THE SUBSTITUTION: - IS OF NET ENHANCED VALUE TO THE PRINCIPAL. - IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND IS AS EFFECTUAL AS THE IDENTIFIED ITEM, DETAIL OR METHOD. Manufacturers’ or Suppliers' Recommendations 1. PROVIDE, SELECT (IF NO SELECTION IS GIVEN) TRANSPORT, DELIVER, STORE, HANDLE, PROTECT, FINISH, ADJUST AND PREPARE FOR USE, MANUFACTURED ITEMS IN ACCORDANCE WITH THE CURRENT WRITTEN RECOMMENDATIONS AND INSTRUCTIONS OF THE MANUFACTURER OR SUPPLIER. Certification 1. PROVIDE CERTIFICATION THAT THE PLANT AND EQUIPMENT SUBMITTED MEETS ALL REQUIREMENTS AND CAPACITIES OF THE CONTRACT DOCUMENTS EXCEPT FOR DEPARTURES THAT ARE IDENTIFIED IN THE SUBMISSION. 2. PROVIDE ALL WARRANTIES, TECHNICAL DATA, TESTING CERTIFICATES, ASPECT & COMPLIANCE CERTIFICATES PRIOR TO HANDOVER. Differential Movement 1. SOIL CLASSIFICATION: 'TBC’ 2. GENERAL: IF THE GEOTECHNICAL SITE INVESTIGATION REPORT PREDICTS DIFFERENTIAL MOVEMENTS BETWEEN BUILDINGS AND THE GROUND IN WHICH PIPES OR CONDUITS ARE BURIED, PROVIDE MOVEMENT CONTROL JOINTS IN THE PIPES OR CONDUITS. MAGNITUDE: ACCOMMODATE THE PREDICTED MOVEMENTS. 2 PROVIDE MOVEMENT CONTROL JOINTS AS REQUIRED & IN ACCORDANCE WITH THE GEOTECHNICAL REPORT, THE SITE SOIL CLASSIFICATION, MANUFACTURERS RECOMMENDATIONS AND AS3500.2 Drainage - General 1, THE HYDRAULIC SERVICES CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL TRADES AND TRADE DOCUMENTATION PACKAGES ON-SITE PRIOR TO THE COMMENCEMENT OF INSTALLATION INCLUDING INCLUDING BUT NOT LIMITED TO: - STRUCTURAL SLABS, FOOTINGS, BEAMS & COLUMNS. - CIVIL STORMWATER. - MECHANICAL A/C DUCT & TUNDISH LOCATIONS. - ELECTRICAL CABLE TRAYS & HIGH-VOLTAGE IN-GROUND CONDUITS. BEDDING FOR PIPELINES TO BE WASHED 5MM SCREENING WITH A MINIMUM 150MM BELOW AND ABOVE PIPES. 3. WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS NOT EXCEEDING 300MM (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION WHEN TESTED IN ACCORDANCE WITH AS 1289 (MODIFIED COMPACTION). TESTING SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER AND CERTIFICATES MADE AVAILABLE CERTIFYING THAT THE REQUIRED COMPACTION HAS BEEN ACHIEVED. S WHERE SERVICES ARE CAST WITHIN THE BUILDING STRUCTURE THE PIPING MATERIAL MUST BE HDPE OR SOLVENT WELD UPVC WITH A STIFFNESS RATING OF N10 (MIN). PROVIDE SUITABLE PIPE PROTECTION IN THE FORM OF LAGGING - DOUBLE WRAPPED WITH LOW DENSITY POLYETHYLENE CLOSED CELL FOAM (OR EQUAL) WITH TAPED JOINTS TO SAFEGUARD THE INTEGRITY OF THE PIPE, PERMIT EXPANSION, CONTRACTION & PROVIDE THERMAL PROTECTION. CAST-IN SERVICES SHALL BE FILLED WITH WATER DURING CONCRETE POUR & WATER LEVELS ARE TO BE MONITORED & MAINTAINED FOR A PERIOD OF 24 HOURS THEREAFTER. 5. _ PROVIDE MOVEMENT CONTROL JOINTS IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS TO ACCOMMODATE ANTICIPATED MOVEMENT. (REFER GEOTECHNICAL REPORT). Trench Grates & Covers AREA OF WORK ==== Stormwater Drainage 1 THE WHOLE OF THE STORMWATER DRAINAGE WORKS SHALL BE IN ACCORDANCE WITH THE NATIONAL CONSTRUCTION CODE (NCC), AS/NZS 3500.3, & THE LOCAL GOVERNMENT GUIDELINES & REGULATIONS, & THE QUEENSLAND DEVELOPMENT CODE (QDC). 2. ALL STORMWATER DRAINAGE SHALL BE FREE OF LEAKS WHEN TESTED IN ACCORDANCE WITH AS/NZS 3500.3. Materials 1. STORMWATER uPVC /SWJ Linetypes - Existing STORMWATER Linetypes - Proposed — — —_ STORMWATER 4—+++-++++++-___ REDUNDANT SERVICES sw Abbreviations e Existing FFL Finished Floor Level IP Inflow Pit RL Reduced Level SL Surface Level SW Stormwater Drain TG Trench Grate TGO Trench Grate Outlet TOG Top of Grate UNO Unless Noted Otherwise NOTE: DRAWING SHOULD BE PRINTED IN COLOUR LOCALITY MAP SCALE: NTS AT SHEET A1 Covers & Grates Channel Description Clear Material Manufacturer / Model Load Classification Description Manufacturer / Model Installation Directions Opening Trafficable Other TG-1 LONGITUDINAL TRENCH 300mm CAST DUCTILE IRON | EJCOLG30Dim CLASS D POLYMER CONCRETE CHANNEL EJCO C3000.0 Part No 15370 CONTRACTOR TO BED BASE OF CHANNEL GRATE, FRAME & CHANNEL 330mm DEEP CHANNEL COMES IN 1mLENGTHS, —_| ONSITE AT 1% GRADE TO THE OUTLET PROVIDE No of LENGTHS AS REQUIRED TG-3 HEEL GUARD GRATE, FRAME |100mm STAINLESS STEEL ACCO 447D CLASS B POLYMER CONCRETE CHANNEL ACO KS100 & CHANNEL 150mm DEEP Covers & Grates Schedule Type Covers & Grates Features \ Comments Description Clear Material Manufacturer / Model Load Classification Opening Trafficable Other GRATE & FRAME (GMS GRATE) 600x600 GALVANISED MILD STEEL EJ GRATES / M66# CLASS D CLASS B Notes: e# denotes load class as required. e Pit surfaces shown are indicative only. Coordinate onsite with finished levels. © All infill lids to include surface finish to match surrounding pavement. Provide precast 150mm wide concrete surround to all grates or covers in grass and/or landscaped areas Provide precast or insitue pits in trafficable areas. Provide glass reinforced concrete pits in non trafficable areas. © All pits & chambers to be compatible with grate & cover selections, include riser rings where necessary to finish at required level. 10 100mm Omm| 06.02.24 | CD [ISSUED FOR TENDER/ CONSTRUCTION Tot | RP DESCRIPTION DATE STAGE [rev wo] AUTH. ARCHITECT \ BUILDING DESIGNER JO CASE architect CLIENT JO CASE ARCHITECT 47 CORMORANT CRESCENT, PEREGIAN BEACH, QLD 4573 P: 0754713097 HYDRAULIC CONSULTANT MRP HYDRAULIC & FIRE SERVICES CONSULTANTS PTY LTD © BRISBANE = SUNSHINE COAST A: Unit 1/47 Owen Creek Rd, Forest Glen, QLD. PO Box 646, Cotton Tree, QLD, 4558. P: — (07) 5443 1000 E: [email protected] PROJECT DESCRIPTION & ADDRESS DRIVEWAY DRAINAGE TO EXISTING RESIDENCE 38 PLOVER STREET, PEREGIAN BEACH 4573 HYDRAULIC SERVICE SHEET DESCRIPTION COVER SHEET NOTES, LEGENDS & LOCALITY PLAN P: — mrp.com.au VERIFIED BY: SIMON LYNCH | DATE JUN 2024 DESIGNER BSA: 1137134 ABN: 23 126 270 326 QBCC: 1137134 | DATE JUN 2024 ISSUED FOR TENDER & CONSTRUCTION SCALE Noted Al PROJECT NUMBER 22-0533 SHEET SIZE ‘SHEET NUMBER H -101 NUMBER REVISION Omm a 50 100mm)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.