Attachment 1—Conditions to be imposed

1805-5297 SER

 

 

 

 

 

 

 

 

 

 

 

 

Operational works in Tidal Waters
Schedule 10, Part 17, Division 3, Table 2, Item 1 — Operational works in tidal waters - The chief
executive administering the Planning Act 2016 nominates the Director-General of the Department of
Transport and Main Roads to be the enforcement authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following conditions:
No. | Conditions Condition timing
1. The development must be carried out generally in accordance with the | At all times
following plans:
- Site Plan, Pontoon Plan & General Notes, prepared by Aqua
Pontoons, dated 23/03/2018, reference AP3523-01
- Elevation, prepared by Aqua Pontoons, dated 23/03/2018,
reference AP3523-02
2. The structure must be lit/marked in accordance with the following | At all times
specifications, such that it does not cause a risk to the safe navigation
of other ships:
- Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting
3. The construction, operation or maintenance of the structure, and any | At all times
ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the work | While works are
must be removed from the waterway and suitably disposed of at the | occurring
applicant's expense.
5. All piles and/or structures to be demolished, both above and below the | Prior to the completion
waterline must be completely extracted/removed. of the works

 

Department of State Development, Manufacturing, Infrastructure and Planning

Page 3 of 4

 

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Supporting Documents - 49 Mossman Court Noosa Heads.pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.