slope stability
Tectonic Geotechnical Pty Ltd
PO Box 899
Buderim Qld 4556
Office: 07 5478 9016
Email: [email protected]
BH3
PROJECT:
PROPOSED RESIDENCES
12 – 14 WYANDRA STREET
NOOSA
TITLE:
SITE PLAN
BH1
CLIENT:
INTEGRA PARTNERSHIPS
BH4 DRAWN: DATE:
JPM 12/09/2022
CHECKED: DATE:
ACD 13/09/2022
BH2 SCALE:
AS SHOWN
LEGEND:
Approx. Borehole Locations
Notes: PROJECT NO.: FIGURE: REV:
Aerial imagery courtesy of Nearmap (14 August 2022) 0 5 10 15 20 m
22340-001 1 0