slope stability
Integra Partnerships 22340-001-Rev0
14 September 2022
carried out from the ground surface and extending below the borehole termination depth to between 4.0 m
and 4.7 m BGL.
The borehole logs and explanatory notes are attached to this report. The results of the desk-top study, walk-
over survey and borehole drilling are included in Section 2 below.
1.3 Qualifications of Responsible Engineer
This report has been reviewed by Mr Ashley Davey, an RPEQ with over 27 years of experience in
geotechnical engineering, including a number of slope stability projects on the Sunshine Coast.
2.0 DESCRIPTION OF EXISTING CONDITIONS
2.1 Geology and Subsurface Conditions
Available geological information 1 indicates that the site is underlain by Pleistocene age parabolic dunes
(“Qpd/2”) comprising “quartz sand” (Ref. Text Figure 4).
Approx. site location
Text Figure 4: Extract from Laguna Bay Geology Map
The boreholes encountered relatively consistent subsurface conditions, summarised as follows:
Fill – Borehole BH1 only, comprising very loose to loose silty sand to 0.4 m depth, then
Natural Sands – initially comprising very loose to loose silty sand/sand to depths between 1.8 m
and 2.5 m BGL, then becoming medium dense to the borehole termination depths (2.8 m to 3 m
BGL).
Results of the DCP testing completed below the borehole termination depths indicated inferred dense
sands at depths of 2.9 m to 3.8 m BGL extending to the DCP termination depths of 4.0 m to 4.7 m BGL.
Groundwater was not encountered during drilling of the boreholes, with the soils being moist.
1
1:100,000 Laguna Bay Surface Geology, Sheet 9545, Compilation Map, DNRME, 2018
3/10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.