Attachment B - Geotechnical Analysis

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                               51 640 311 842
                                                                                                                   CONTACT
                                                                                                  [email protected]
                                                                                                           Arcosgroup.com.au
                                                                                                                     OFFICES
                                                                                       Sunshine Coast | Brisbane | Gold Coast




 Teeland Architects                                                                                 09 Feb 2021
 By Email                                                                                   Letter 01 Revision 0
                                                                                             Project: AG200849

 [email protected]
Dear Team,

Report on Geotechnical Investigation
Proposed Residential Dwelling
20 Park Crescent, Sunshine Beach

At the request of Teeland Architects, Arcos Unit Group Pty Ltd (AG) undertook a geotechnical
investigation for the above project. The summary of the investigation is detailed in Table 1.
Table 1: Summary of Investigation Results
                       Site Classification in            Wind Classification in             Maximum Allowable
   Ys (mm)
                     Accordance with AS2870             Accordance with AS4055             Bearing Pressure (kPa)
                                                                                                 High Level
     <20                        Class S                              NA                                    100
Notes:   The above is a summary of the detailed investigation results discussed within this report. The entire report
must be read, understood, and kept in entirety.




We trust this information is satisfactory for your current needs. Should you have any questions,
please feel free to contact the undersigned.
 Geotechnical Engineer                                                 Principal Geotechnical Engineer




 Cody Surawski B.Eng(Civ)(Hons)/B.Env.Sc.           Billy Blake B.Eng(Civ)(Hons), CPEng, RPEQ, NER, MIEAust




09 Feb 2021                                                                      Proposed Residential Dwelling
Log in to download the original file

Attachment B - Geotechnical Analysis.pdf · 970 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 11 pages

Page 2

                                                                                                  51 640 311 842
                                                                                                      CONTACT
                                                                                     [email protected]
                                                                                              Arcosgroup.com.au
                                                                                                        OFFICES
                                                                          Sunshine Coast | Brisbane | Gold Coast




1.0 Introduction
Arcos Unit Group Pty Ltd (AG) was commissioned to undertake a geotechnical investigation
for the Proposed Residential Dwelling located at 20 Park Crescent, Sunshine Beach.


This report outlines the results of the investigation, laboratory testing, analysis and interpretive
reporting on the following items:
• All factual information resulting from the investigation (investigation methodologies,
   detailed desktop review, test location plans, bore logs);
• Summary of subsurface conditions and adopted subsurface conditions including
   groundwater;
• Earthworks and site preparation comments;
• Foundation soil reactivity in accordance with AS2870 (Site Classification);
• Suitable high level foundation options including allowable bearing pressures;
• Suitable deep level foundation options (if required);

This report must be kept in entirety.


2.0 Site Description & Geology
The site is described as 20 Park Crescent, Sunshine Beach totalling approximately 588 m2. The
block is steeply sloped requiring additional slope stability assessment, has good drainage, and
is irregular in shape.


Referencing available geology for the area, the site is underlain by Pleistocene aged Sand
which typically comprises Quartz sand; parabolic sand dunes. The encountered natural
materials are in agreement with the expected geology.


3.0 Fieldwork & Results
The fieldwork was undertaken on 5 February 2021 and included 1 bores drilled to to a
maximum depth of 3.5 m using a shovel and pick. The subsurface conditions were logged
through tactile and visual assessment of returned spoil by an experienced Geotechnical
Engineer.


The encountered subsurface conditions are described in detail on the attached bore logs;
however, in summary comprise natural sand.


Groundwater measurements or the lack of groundwater are made within the bore logs
attached; however, it must be noted that groundwater is transient and will fluctuate with
seasons and time.




09 Feb 2021                                                          Proposed Residential Dwelling

Page 3

                                                                                                  51 640 311 842
                                                                                                      CONTACT
                                                                                     [email protected]
                                                                                              Arcosgroup.com.au
                                                                                                        OFFICES
                                                                          Sunshine Coast | Brisbane | Gold Coast




4.0 Lab Testing
Laboratory testing is summarised in Table 2.

Table 2: Laboratory Testing Summary
      Test
                   Depth (m)                  Material                  Shrink-Swell Index (%)
    Location
      BH1           0.0 - 0.5                   Sand                                    1*



5.0 Geotechnical Comments
Geotechnical comments are based on the factual findings of the investigation, best practice,
local experience, published correlations; however, are fundamentally founded in opinion and
this should be considered.

5.1 Earthworks and Site Preparation
The following comments are provided in relation to site preparation for earthworks.
•   The area should be stripped of uncontrolled fill, soft, overly wet, foreign, or otherwise
    deemed unsuitable material (material that is potentially compressible) down to a relatively
    stiff dry base ensuring no organics material is present.
•   Stripped areas must be inspected by the geotechnical testing authority (GTA) to ensure no
    soft spots or loose zones are present. This should be done with the use of a loaded body
    truck or 12 tonne roller as a minimum. Areas showing signs of movement under the action
    of the testing equipment should be either over excavated and replaced with select fill or
    conditioned onsite through tyning, blending or other suitable methods.
•   Although no standard exists for the moisture content of soils, it is recommended that the
    site soils be placed at or near optimum moisture content (OMC) for general earthworks
    operations. This increases efficiency during earthworks operations. A range of +/- 2% of
    OMC is recommend for general earthworks.
•    Where site soils are proposed for use as fill in other areas, won material will need to have
    a maximum particle size of 75 mm or be observed to break down under the energy of
    compactive equipment.
•   Fill materials should be placed in relatively horizontal layers with a maximum placement
    thickness of 200 mm. The materials should be compacted to a minimum dry density ratio
    of 95% relative to Standard compactive effort.
•   Highly plastic clays at this site will be very sensitive to the presence or lack of moisture and
    therefore care should be used to place the material within the range nominated and to a
    maximum dry density of 102% relative to Standard compactive effort. Where this does not
    happen, the material could readily swell, soften, or be subject to significant trafficability
    issues.



09 Feb 2021                                                          Proposed Residential Dwelling

Page 4

                                                                                                 51 640 311 842
                                                                                                     CONTACT
                                                                                    [email protected]
                                                                                             Arcosgroup.com.au
                                                                                                       OFFICES
                                                                         Sunshine Coast | Brisbane | Gold Coast




•   Fill material will be subject to potential settlement post placement. Well compacted fill
    placed in accordance with AS3798 and otherwise, good earthworks procedure should
    typically be subject to settlement in the order of 0.5% to 1.0% of the fill thickness over a
    log cycle of time.

5.2 Site Classification
The results of the investigation, previous experience, and published correlations were used to
estimate the maximum characteristic ground surface movement (ys) value in accordance with
AS 2870. A suction change value of 1.2 was adopted along with a suction zone (Hs) of 1.5 m
were used in the calculations. In addition to this, the cracking depth was nominated to be
0.5Hs.


The results of the calculations indicate that at the time of the investigation, a ys value
approximately equal to <20 mm is considered suitable.


It is important to understand that numerous things can affect and consequently increase or
decrease the ys value for a site.


The following are items that may affect the site and as a result change the site classification to
a “Class P”.
•   Excessive moisture as a result of poor drainage, maintenance to drainage structures,
    excessive watering of gardens;
•   Placement or removal of vegetation that draws moisture from the soil surrounding the
    structure;
•   Additional earthworks outside the limitations set out in AS2870;


Long term maintenance is typically required for sites for maintenance. Useful information is
attached which should be read and understood by both the builder and property owner.

5.3 Foundations
It is recommended that all high level footings have perimeter, column and load bearing
footings found a minimum 0.3 m below surface levels. Where footings found into medium
dense (or stronger) sand, they may be dimensioned for a maximum allowable bearing pressure
of 100 kPa. All foundation excavations should be inspected by a suitably experienced and
qualified geotechnical engineer prior to the placement of concrete to confirm ground
conditions.




09 Feb 2021                                                         Proposed Residential Dwelling

Page 5

                                                                                                 51 640 311 842
                                                                                                     CONTACT
                                                                                    [email protected]
                                                                                             Arcosgroup.com.au
                                                                                                       OFFICES
                                                                         Sunshine Coast | Brisbane | Gold Coast




6.0 Limitations
Arcos Unit Group Pty Ltd (AG) has prepared this document for 20 Park Crescent, Sunshine
Beach for Teeland Architects. The document is specific to this particular project and for the
purposes as described within the document. The document cannot be used for any other
project on the same site or other sites or relied upon by a third party. Any party relying upon
this document beyond its exclusive use and purpose as stated above, and without the express
written consent of AG, does so entirely at its own risk and without recourse to AG for any loss
or damage. AG has necessarily relied upon information provided by the client and/or their
agents.

It is important to understand that ground conditions can be spatially variable over short
distances as a result of geological processes or human interference. These changes can occur
after the time of which field work was undertaken. Given this, the assumed subsurface
conditions within this document are only indicative of the conditions at the testing locations
to the depths investigated at the time of the fieldwork.

The advice given in this document is based upon the assumed subsurface conditions. The
relevance and accuracy of advice given is directly affected by variations in ground conditions
across the site between testing locations that has not been captured and time elapsed since
investigation works.

This document must be kept in entirety, read in full and understood. Interpretations or
conclusions made by others unless supported by an expressed written statement,
interpretation, outcome or stated within this document cannot be the responsibility of AG.

This document or parts of it should not be used as part of a specification or design for a project
without prior review and agreement by AG.

__________________________________________________________________________________


We trust this information is satisfactory for your current needs. Should you have any questions,
please feel free to contact the signed authors.




09 Feb 2021                                                          Proposed Residential Dwelling

Page 6

                                                                                                          51 640 311 842
                                                                                                                   MAIL
                                                                                                             PO BOX 851
                                                                                                Moffat Beach, QLD, 4551
                                                                                                                OFFICES
                                                                                  Sunshine Coast | Brisbane | Gold Coast




GEOTECH REPORT
These notes have been provided to clarify and               Arcos Unit Group Pty Ltd undertakes quality assurance
enhance the reader’s understanding of the terminology       checks in accordance with its’ quality system
used throughout the report, and also to identify where      requirements; however, restrictions on the project
limitations exist. All investigations are undertaken        outside of Arcos Unit Group Pty Ltd’s control can result
based on budgetary constraints which impart a level of      in unanticipated variations, changes in policy or
uncertainty as a result of limiting the amount of           interpretation of said policies by the relevant authority,
investigation undertaken.                                   or the actions of contractors subject to commercial
                                                            pressure.
Copyright
                                                            Site Variations
This report remains the property of Arcos Unit Group
Pty Ltd at all times unless ownership is transferred in     If site variations become evident at the time of
writing. It cannot be included in any documentation         construction or after the release of a report, Arcos Unit
without the express written permission of Arcos Unit        Group Pty Ltd requests immediately notification. This
Group Pty Ltd                                               notification is proposed in order to assist in remediation
                                                            prior to any permanent structures or design procedures
Subsurface Report Sheets (Bores etc)                        are undertaken.

The provided subsurface sheets are inherently an            Collaboration
interpretation undertaken by a suitably qualified and
experienced person; however, the reliability of the         Arcos Unit Group Pty Ltd strongly recommends open
provided information will rely on the method of             and collaborative communication about the use and
investigation. It is prudent to state that these sheets     inherent interpretation of Arcos Unit Group Pty Ltd’s
only represent a very small percentage of the               report. Please contact the author of the report to
subsurface conditions across a particular project.          arrange for an obligation free discussion regarding the
                                                            potential benefits of having geotechnical consultants.
It reasons that given the relatively small representation
of the subsurface conditions for a project, spacial
variability between testing locations must be taken into
consideration including the orientation of strata
intersections.

The presence or lack of groundwater is usually stated
on the subsurface sheets; however, it must be noted
that the measurements undertaken onsite are typically
very inaccurate and if the presence or lack of
groundwater will have any degree of affect on the
project, additional groundwater monitoring techniques
should be employed such as groundwater monitoring
wells.

Reporting

The report has been prepared and reviewed by suitably
qualified and experienced persons. The persons draw
on previous experience, local knowledge, published
literature, and otherwise standard engineering
approaches and principals. The context of which the
report has been prepared for must be considered and
if the context changes, due consideration should be
given to the possibility that the report is no longer
considered relevant and review by Arcos Unit Group
Pty Ltd must be undertaken.

Page 7

                                                                                                          51 640 311 842
                                                                                                                   MAIL
                                                                                                             PO BOX 851
                                                                                                Moffat Beach, QLD, 4551
                                                                                                                OFFICES
                                                                                  Sunshine Coast | Brisbane | Gold Coast




Interpretation of the
Subsurface Sheets
                                                            Very Low Strength (VLS)                  < 2 MPa (UCS)
The terminology included on Arcos Unit Group Pty
                                                            Low Strength (LS)                        2 to 6 MPa (UCS)
Ltd’s has been evolved from AS1726:2016. Typically
                                                            Medium Strength (MS)                     6 to 20 MPa (UCS)
a soil’s strength, colour, plasticity, grain size, other
                                                            High Strength (HS)                       20 to 60 MPa (UCS)
inclusions, and moisture will be described. A rock’s
                                                            Very High Strength (VHS)                 60 to 200 MPa (UCS)
strength, weathering, colour, grain, and other
                                                            Extremely High Strength (EHS)            > 200 MPa (UCS)
inclusions are typically described.

Soil                                                        Very Low Strength (VLS)                  < 0.1 Is(50)
                                                            Low Strength (LS)                        0.1 to 0.3 Is(50)
Soil is typically described by the components that          Medium Strength (MS)                     0.30 to 1.0 Is(50)
make it up by percentage or whichever has a                 High Strength (HS)                       1.0 to 3.0 Is(50)
governing behaviour. The types and sizes                    Very High Strength (VHS)                 3.0 to 10.0 Is(50)
reproduced from AS1726 are:                                 Extremely High Strength (EHS)            > 10.0 Is(50)
 Boulder                 >200 mm
 Cobble                  63 to 200 mm                      The Is(50) values are based on a correlation
 Gravel                  2.36 to 63 mm                     between the unconfined compressive strength
 Sand                    0.075 to 2.36 mm                  (UCS) of 20. This value varies significantly and site
 Silty                   0.002 to 0.075 mm                 specific testing must take precedence.
 Clay                    < 0.002 mm
                                                           Rock weathering is broken down as follows:
The strength of soil is usually assessed by suitably
experienced persons through the use of laboratory           Extremely weathered       Behaves as soil but rock
test results, published literature, field assessments or    (EW)                      structure evident
a combination of the above. The strength of soil is         Highly weathered          Colour and strength of original
characterised into either cohesive (clays and silts) or     (HW)                      fresh rock is not recognisable.
cohesionless (sands and gravels) as shown below:                                      Decomposition of rock evident
                                                            Moderately                Defects are heavily stained with
 Cohessive Soil           Strength Term                     weathered (MW)            rock mass showing signs of
 Very Soft                < 12.5 kPa                                                  discolouration
 Soft                     12.5 to 25 kPa                    Slightly weathered        Some staining but minimal to no
 Firm                     25 to 50 kPa                      (SW)                      change in strength
 Stiff                    50 to 100 kPa                     Fresh stained             Minor staining evident
 Very Stiff               100 to 200 kPa                    (FS)
 Hard                     > 200 kPa                         Fresh rock                No change
                                                            (FR)
 Cohesionless Soils       Strength Term (uncorrected Qc)
 Very Loose               <2 MPa                           Rock fracturing is broken down as follows and can
 Loose                    2 to 5 MPa                       only be accurately described where undamaged
 Medium Dense             5 to 15 MPa                      continuous sampling has been undertaken:
 Dense                    15 to 25 MPa
 Very Dense               > 25 MPa                          Fragmented (Fg)             Defect spacings < 20 mm
                                                            Highly Fractured (HF)       Defect spacings 20 to 50 mm
Rock                                                        Fractured (Fr)              Defect spacings 50 to 200 mm
                                                            Slightly Fractured (SF)     Defect spacings 200 to 1000 mm
Rock is typically described by the components that          Unbroken (Ub)               Defect spacings > 1000 mm
make it up by percentage or whichever has a
governing behaviour. The strength of rock is typically
the most important component. Typically, the
strength of rock is based on laboratory testing, tactile
assessment and other observations as relevant. The
industry standard method for assessing the strength
of rock in the field is to use the point load strength
index (AS4133.4.1). It is important to note that the
point load strength index does not take into
consideration the degree of fracturing of a rock mass
which can both lower and increase the overall rock
strength. The strength of rock is broken down as
follows:

Page 8

                                                   CLIENT:       Teeland Architects                        PROJECT #: 200849                BORE
                                                   PROJECT: Proposed Residential Dwelling
                                                   ADDRESS: 20 Park Crescent, Sunshine Beach
                                                                                                           LOGGED:     CS
                                                                                                                                            1
                                                                                                           EASTING:
                                                   DRILL RIG:                                              NORTHING:                        TEST DATE: 05/02/2021

                                                                                                                         Sampling & Testing
              Graphic Log




                                                                                                                                                         DCP Results
                                                                        Material Description                                    Results &
                                                                                                                      Type                           (blows per 100 mm)
                                                                                                                                Comments
                            Water




 RL Depth
 (m) (m)                                                                                                                                               5   10   15   20
                                    SAND SW: loose, white, fine to coarse grained, moist                                                         0



                                                                                                                                                 0



                                                                                                                                                 0



                                                                                                                                                 0



                                                                                                                                                 0


                             0.5 SAND SW: loose, white, fine to coarse grained, moist - Inferred
                                                                                                                                                 0



                                                                                                                                                 1



                                                                                                                                                 1



                                                                                                                                                 0



                                                                                                                                                 1
        1
                                                                                                                                                 0



                                                                                                                                                 1



                                                                                                                                                 1



                                                                                                                                                 2



                                                                                                                                                 1



                                                                                                                                                 1



                                                                                                                                                 2



                                                                                                                                                 1



                                                                                                                                                 2



                                                                                                                                                 2
        2
                                    medium dense                                                                                                 3



                                                                                                                                                 3



                                                                                                                                                 4



                                                                                                                                                 5



                                                                                                                                                 5



                                                                                                                                                 5



                                                                                                                                                 5



                                                                                                                                                 6



                                                                                                                                                 7



                                                                                                                                                 7
        3
                                                                                                                                                 8



                                                                                                                                                 8



                                                                                                                                                 8



                                                                                                                                                 8



                                                                                                                                                 8


                             3.5 Bore Terminated at 3.5 m.




        4



DRILLING METHOD: Hand Auger                                                                                                      CASING: Nil
GROUNDWATER: No groundwater observed at the time of investigation.
REMARKS:

                                                                                      LEGEND:
       D     - Disturbed Sample from Auger                               SPT - Standard Penetration Test          - Groundwater Seepage Level
       B     - Bulk Sample from Auger                                    Is50 - Point Load Result (MPa)           - Standing Groundwater Level
       C     - Rock Core                                                 PP - Pocket Penetrometer (kPa)           - Partial Groundwater Loss
       U50   - Undisturbed Sample (mm)                                                                            - Perched Groundwater Level

Page 9

Foundation Maintenance
and Footing Performance:
A Homeowner’s Guide

casino

err is

replaces
Information
Sheet 10/91

Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause
of movement in buildings can usually be related to one or more problems in the foundation soil. & is important for
the homeowner to identify the soil type in order to ascertain the measures that should be put in place in order to

ensure that problems in the foundation soil can be prevented, thus protecting agains building movement.
This Building Technology File is designed to identify causes of soil-related building movement, and to suggest

methods of prevention of resultant cracking in buildings.

The types of solls asually present under the topsoil In land zoned for
residential buildings can be split Into two approximate groups ~
granular and clay. Quite often, foundation soll Is 2 mixture of both
types. The general problems associated with solls having granular
content are usually caused by eroston Clay sols are subject to
saturation and swell/shrink problems

Classifications for 2 given area can generally be obtained by
application to the local authority, bur these are sometimes unreflable
and if there Is dowhrt, a geotechnical report should be commissioned.
As most bulldings suffering movement problems are founded on clay
solls, there & an emphasis on classification of soils according to the
aenqunt of swell and shrinkage they experience with variations of
water content. The table below ts Table 2.1 fram AS 2870, the
Residential Stab and Footing Code.

Settlement due to construction

‘There are two types of settlement that occur as a result of

construction.

© Immediate settiement occurs when a building & first placed on Its
foundation soll, 23 a result of compaction of the soll under the
weight of the structure, The cohesive quality of clay soll mitigates
against this, but granular (particularly sandy) soll ts susceptible.

* Consolidation setriement sa fearure of clay soll and may take
Place because of the expulsion of motsture from the soll or because
of the soll's lack of resistance to local compmressive or shear stresies.
This will usually take place during the first few months after
construction, but has been known to take mary years in
exceptional cases.

‘These problems are the province of the butider and should be taken

Eraston

All sols are prone to erosion, bur sandy sotl ts particularly suscepethle
to being washed away. Even clay with 2 sand component of say 10%
of more can suffer from erosion,

Saturation

‘This & particularly a problem In clay sols. Saturation creates a bog-
Nike suspension of the soll that causes if to lose virmuaily af] of ts
bearing capactty. To a lesser degree, sand ts affected by saturation
because saturated sand may undergo a reduction in volume -
particularly imported sand fill for bedding and blinding layers,
However, this usually occurs as immediate settlement and should
norenally be the prowince of the builder.

Seasonal swelling and shrinkage of soll

All days react to the presence af water by slowly absorbing tr, making
the soll Increase In volume (see table below). The degree of Increase
varies considerably between different clays, as does the degree of
decrease during the subsequent drying out caused by fair weather
periods. Because of the low absorption and expulsion rate, this
Phenomenon will not usually be norkceable unless there are
Prolonged rainy or dry periods, usually of weeks or months,
depending on the land and soll characteristics.

‘The swelling of sol creates an upward force on the footings of the
bullding. and shrinkage creares subsidence that takes away the
support needed by the footing to retain equilibrium.

Shear failure

‘Tht phenomenon occurs when the foundation soll does not have
sufficient strength to support the weight of the footing. There are
two major post-comstruction causes:

* Significant load increase.

* Reduction of lateral support of the soll under the footing due to

 

 

 

 

 

 

 

 

 

ce CE cg a aor la a
problems. adjacent to or under the footing.
GENERAL DEFINITIONS OF SITE CLASSES
Class Foundation
A Mast sand and rock sites with little or no ground movement fram matsture changes
5 Slightly reactive clay sites with only slight ground movement from malisture changes
M Moderately reactive clay or sii sites, which can experience moderate ground movement from matsture changes
H Highly reactive clay sites, which can experience high ground movement from molsture changes
E Extremely reactive sites, which can experience extreme ground movement from matsture changes
AwP Filted sites
> || ee eee ae ee nee

 

 

 

 

Page 10

Tree root growth
Trees and shrubs that are allowed to grow in the vicinity of footings
can cause foundation soil movement in two ways:

* Roots that prow under footings may increase in cross-sectional
size, exerting upward pressure on footings.

* Roots in the vicinity of footings will absorb much of the moisture
in the foundation soil, causing shrinkage or subsidence.

Unevenness of Movement
The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of-
© Differing compaction of foundation soil prior to construction.
© Differing moisture content of foundation soil prior to
construction.
Movement due to non-construction causes is usually more uneven
still. Erosion can undermine a footing that traverses the Flow or can
create the conditions for shear failure by eroding soil adjacent to a
footing that rans in the same direction as the flow.
Saturation of clay foundation soil may occur where subfloor walls create
adam that makes water pond. [t can also occur wherever there is a
source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear failure.
Seasonal swelling and shrinkage of clay soil affects the perimeter af
the building first, then gradually spreads to the interior. The swelling
process will usually begin at the uphill extreme of the building, or on
the weather side where the land is flat. Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun's heat is greatest.

Effects of Uneven Soll Movement on Structures

Erosion and saturation

Erosion removes the support from under footings, tending to create

subsidence of the part of the structure under which it occurs.

Brickwork walls will resist the stress created by this removal of

support by bridging the pap or cantilevering until the bricks or the

mortar bedding fail. Older masonry has little resistance. Evidence of

failure varies according tm circumstances and symptoms may include:

© Step cracking in the mortar beds in the body of the wall or above!
below openings such as doors or windows.

* Vertical cracking in the bricks (usually but not necessarily in line
with the vertical beds or perpends).

Isolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fall over. The floors that have lost this support will become bouncy,
sometimes rattling ormaments etc.

Seasonal swelling/shrinkage in day

Swelling foundation soil due to rainy periods first lifts the most exposed
extremities of the footing system, then the remainder of the perimeter
footings while gradually permeating inside the building footprint to lift
internal footings. This swelling first tends to create a dish effect,
because the external footings are pushed higher than the internal ones.
The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.

As the moisture absorption process completes its journey to the
innermost areas of the building, the internal footings will rise. If the
spread of moisture is roughly even, it may be that the symptoms will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms. In buildings with timber flooring sapported by bearers
and joists, the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of flooring.
As the weather pattern chanpes and the soil bepins to dry out, the
external footings will be first affected, beginning with the locations
where the sun's effect is strongest. This has the effect of lowering the

 

external footings. The doming is accentuated and cracking reduces
or disappears where it ocourred because of dishing, but other cracks
open up. The roof lines may become convex.

Dorning and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail, water
migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity is toward dishing.

Movement caused by tree roots

In general, growing roots will exert an upward pressure on footings,
whereas soil subject to drying because of tree or shrub roots will tend
to remove support from under footings by inducing shrinkage.

Complications caused by the structure itself

Most forces that the soil causes to be exerted on structures are
vertical — i.e. either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of all these
forces is usually rotational. This resultant force often complicates the
diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.

Effects on full masonry structures

Brickwork will resist cracking where it can. It will attempt to span
areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings for windows or doors.

In the event of construction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.

With local shear or erosion, cracking will usually continue to develop
until the original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on other footings that remain effective.

In the case of swell/shrink effects, the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect will noe be exactly reversed,
and it is also usual that brickwork will settle in its new position and
will resist the forces trying to return it to its original position. This
means that in a case where swelling takes place after construction
and cracking occurs, the cracking is likely to at least partly remain
after the shrink segrnent of the cycle is complete. Thus, each time the
cycle is repeated, the likelihood is that the cracking will become
wider until the sections of brickwork become virtually independent.
With repeated cycles, once the cracking is established, if there is no
other complication, it is normal for the incidence of cracking to
stabilise, as the building has the articulation it needs to cope with the
problem. This is by no means always the case, however, and monitoring
of cracks in walls and floors should always be treated seriously.
Upheaval caused by growth of tree roots under footings is not a
simple vertical shear stress. There is a tendency for the mot to also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.

Page 11

The normal structural arrangement is that the inner leaf of
brickwork in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking that should be the main focus of
attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should be
checked if there is any doubt. In any case, externally visible cracking
is important as a puide to stresses on the structure generally, and it
should also be remembered that the external walls must be capable of
supporting themselves.

Effects on framed structures

Timber or steel framed buildings are less likely to exhibit cracking due
to swell/shrink than masonry buildings because of their flexibility.
Also, the doming/dishing effects tend to be lower because of the
lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation causes a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings, particularly where there is a weak
point in the structure caused by a door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
symptoms for a considerable period. The same warning period should
apply in the case of upheaval. It should be noted, however, that where
framed buildings are supported by strip footings there is only ome leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.

Effects on brick veneer structures

Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.

Water Service and Drainage

Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough to
saturate a clay foundation. A leaking tap near a building can have the
same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble is used as fill. Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation.

Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem. Poor roof plumbing can result in large volumes of rainwater
being concentrated in a small area of sail:

© Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves etc.

© Corroded guttering or downpipes can spill water to ground.

* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.

Seriousness of Cracking

In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair of even ignored. The table
below is a reproduction of Table C1 of AS 2870-2011.

AS 2870-2011 also publishes figures relating to cracking in concrete
floors, however because wall cracking will usually reach the critical
point significantly earlier than cracking in slabs, this table is not
reproduced here.

Prevention /Cure

Plumbing

Where building movernent is caused by water service, roof
plumbing, sewer or stormwater failure, the remedy is to repair the
problem. It is prudent, however, to consider also rerouting pipes
away from the building where possible, and relocating taps to
positions where any leakage will not direct water to the building
vicinity. Even where gully traps are present, there is sometimes
sufficient spill to create erosion of saturation, particularly in modern
installations using smaller diameter PVC fixtures. Indeed, some
gully traps are not situated directly under the taps that are installed
to charge them, with the result that water from the tap may enter
the backfilled trench that houses the sewer piping. If the trench has
been poorly backfilled, the water will either pond or flow along the
bottom of the trench. As these trenches usually ran alongside the
footings and can be at a similar depth, it is not hard to see how any
water that is thus directed into a trench can easily affect the
foundation's ability to support footings or even gain entry to the
subfloor area.

Ground

In all soils there is the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain. If necessary, a grated drain system
connected to the stormwater collection system is usually an easy
solution.

Ie is, however, sometimes necessary when attempting to prevent water
migration that testing be carried out to establish watertable height
and subsoil water flows. This subject is referred to in BT F 19 and
may properly be regarded as an area for an expert consultant.

Protection of the building perimeter

Ie is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problems

For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of paving be installed around
as much of the building perimeter as necessary. This paving should

 

 

 

 

 

 

 

 

Approximate crack width Damage

Description of typical damage and required repair limit (see Note 3) category
Hairline cracks <0.1 mm o
Fine cracks which do not need repair <l mm
(Cracks noticeable but easily filled. Doors and windows stick slightly. <Smm 2
(Cracks can be repaired and possibly a small amount of wall will need to be 5-15 mm (or a number of cracks 3
replaced. Doors and windows stick. Service pipes can fracture. Weathertightness 3 mm or more in one group)
often impaired.
Extensive repair work involving breaking-out and replacing sections of walls, 15-25 mm but also depends on 4
especially over doors and windows. Window and door frames distort. Walls lean number of cracks
or bulge noticeably, some loss of bearing in beams. Service pipes disrupted.

 

 

 

 

Page 12

 

extend ourwards a minimum of 900 mm (more in highly reactive
soil) and should have a minimum fall away from the building of
1:60. The finished paving should be no less than 100 mm below
brick vent bases.

It is prudent to relocate drainage pipes away from this paving, if

possible, to avoid complications from furure leakage. If this is not
practical, earthenware pipes should be rephced by PVC and

Pilling chnald beef te soos eal pve cathe marooasdng soil

and compacted to the same density.

Except in areas where freezing of water is an issue, it is wise to

remove taps in the building area and relocate them well away from

the building — preferably noe uphill from it (see BTF 19).

Tt may be desirable to install a grated drain at the outside edge of the

paving on the uphill side of the building. If subsoil drainage is
needed this can be installed under the surface drain.

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where there is little clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloor and significantly slows the process of drying

Warning: Although this Building Technology File deals with
cracking in buildings, it should be said thar subfloor moisture can

result in the development of other problems, notably:

© Water that is transmiteed into masonry, metal or timber building
elements causes damage and/or decay to those elements.

* High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.

© Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.

The garden

The ideal vegetation layout is to have lawn oc plants that require only
light watering immediately adjacere to the drainage or paving edge,
then moce demanding plants, shrubs and trees spread our in thar order.
Overwatering due to misuse of automatic watering systems isa
common cause of saturation and water migration under footings. If ir
is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is causing a problem of soil drying or there is the
existence or threat of upheaval of footings, if the offending mots are
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent furure root growth in the direction of
the building, If it is not possible to remove the relevant roots without
damage to the tree, an application to remove the teee should be made
to the local authority. A prudent plan is to transplant likely offenders
before they become a problem.

Information on trees, plants and shrubs

State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gardens are also sources of
information. For information on plant roots and drains, see Building
Technology Pile 17.

Excavation

Excavation around footings must be properly engineered. Soil
supporting fooeings can only be safely excavated at an angle that
allows the soil under the footing to remain stable. This angle is called
the angle of pose (or fiction) and varies between soil
types and conditions. Removal of sail within the angle of repose will
cause subsidence.

Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density. Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialise consultant.

Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempeed to alleviate floor bounce by filling
the gap thar has appeared between the bearer and the pier with
blocking. The danger here is that when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil. If
ir is necessary to use blocking, it should be by a pair of fine wedges
and monitoring should be carried our fortnightly.

This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.

‘The Information In this and other Issues in the series was derived from various sources and was belleved to be correct when published.

 

‘The Information ts advisory. Its provided In good falth and not claimed to be an exhaustive treatment of the relevant subject.

 

Further profossional advice needs to be obtained before taking any action based on the Informatkn promded.

 

Disinbutod by
CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia

Tal (03) 9662 7666

Fax [03] 96627555

wew.publish.csira.au

Email: publishing [email protected]
© CSIRO 2003. Unauthorised copying of this Bullding Technology File ts prohibited

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.