                      e.      The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               21.    Pathways must:
                      a.      terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety; and
                      b.      be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               22.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-051 and any associated addendum.
               23.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               24.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete;
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway;
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path; and
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               25.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with the guidelines. A certificate must be provided by a RPEQ and
                      submitted to Council prior to the commencement of the use.
               26.    Fall protection must be provided to retaining walls that are over 1m high.
               27.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies
                      b.      1 in 4 for grassed areas.
                      c.      1 in 3 for planted areas.
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               28.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               29.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g. by blocking or interfering with natural overland flows).



                                                                                                        Page 5 of 12
Document Set ID: 22388440
Version: 2, Version Date: 28/04/2023


[OCR of page images]
21.

22.

23.

24.

25.

26.
27.

28.

29.

Document Set ID: 22388440

e. | The required work includes any modifications to ensure the footpath finishes flush with
all existing service covers and the like, or alternatively these services are raised or
altered, so as not to create a pedestrian safety hazard.

Pathways must:

a. terminate in a manner that ensures smooth transition to existing surfaces for public
safety; and

b. be designed and constructed to comply with the Disability Discrimination Act (DDA),
Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
access and mobility.

Site Access and Driveways

Driveway crossovers must be constructed in accordance with council’s Standard Drawings
RS-051 and any associated addendum.

Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.

The following must be complied with during the construction of the required
crossover/driveway:

a. | The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete;

b. | The driveway must be constructed so as not to concentrate stormwater runoff onto
neighbouring properties;

Cc. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway;

d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path; and

e. The property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage. The developer is responsible for any necessary relocation
of existing services to provide this clearance and must contact the relevant service
authorities and comply with their requirements in relation to these works.

Earthworks and Retaining Walls

All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with the guidelines. A certificate must be provided by a RPEQ and
submitted to Council prior to the commencement of the use.

Fall protection must be provided to retaining walls that are over 1m high.
Slope and batters are a maximum grade of:

a. 1 in 6 where in proximity to waterbodies

b. 1 in 4 for grassed areas.

Cc. 1 in 3 for planted areas.

d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage

Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.

Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g. by blocking or interfering with natural overland flows).

Page 5 of 12

Version: 2, Version Date: 28/04/2023

Used in these records

About this file

File size
173 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - OPW22 0319 [As Published].pdf · 173 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.