Report on Geotechnical Investigation Proposed Mixed-Use Development 36-38 Duke Street, Sunshine Beach Prepared for: Faris Cosic Cambooya Pty Ltd Level 14, 131 Macquarie Street Sydney NSW 2000 Report Number: J001873-001-R-Rev0 February 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 37 pages
Page 2
Cambooya Pty Ltd Table of Contents 1.0 INTRODUCTION .................................................................................................................................... 1 2.0 PROPOSED DEVELOPMENT ............................................................................................................... 1 3.0 SITE DESCRIPTION .............................................................................................................................. 1 4.0 METHODOLOGY ................................................................................................................................... 3 4.1 Fieldwork................................................................................................................................................. 3 5.0 INVESTIGATION FINDINGS .................................................................................................................. 4 5.1 Geology & Landslide Hazard Mapping ................................................................................................... 4 5.2 Ground Conditions .................................................................................................................................. 4 6.0 GEOTECHNICAL RECOMMENDATIONS ............................................................................................. 5 6.1 Earthworks .............................................................................................................................................. 5 6.1.1 Site Preparation & Filling .................................................................................................................... 5 6.1.2 Temporary Batter slopes .................................................................................................................... 6 6.1.3 Excavatability ...................................................................................................................................... 6 6.2 Foundations ............................................................................................................................................ 6 6.2.1 Site Classification ............................................................................................................................... 6 6.2.2 Footing Design .................................................................................................................................... 6 6.3 Retaining Wall Design ............................................................................................................................ 7 6.4 Drainage & Erosion Control .................................................................................................................... 7 7.0 STABILITY RISK ASSESSMENT ........................................................................................................... 8 7.1 General Foundation Maintenance .......................................................................................................... 8 8.0 LIMITATIONS ......................................................................................................................................... 8 Tables Table 1: Lateral Earth Pressure Coefficients. .................................................................................................... 7 Table 2: Stability Risk Levels. ............................................................................................................................ 8 Table 3: Qualitative Risk Assessment for Property (Based on AGS 2007)....................................................... 8 Appendices Appendix A Site Plan Appendix B Reports of Boreholes and Explanatory Notes Appendix C Qualitative Terminology for Use in Assessing Risk to Property (AGS 2007) Appendix D A Guide to Preventing Structural Damage V3 (QBCC 2015) Appendix E Limitations J001873-001-R-Rev0 Page ii
Page 3
Cambooya Pty Ltd 1.0 INTRODUCTION As requested by JFP Urban Consultants Pty Ltd, on behalf of Cambooya Pty Ltd, Core Consultants Pty Ltd (Core) has carried out a geotechnical investigation and slope stability assessment for a proposed mixed-use development at 36-38 Duke Road, Sunshine Beach. 2.0 PROPOSED DEVELOPMENT We understand that the proposed development is to comprise a four-storey building that is to be terraced up the sloping ground surface, as shown on Image 1. The lower level on the southern part of the site is anticipated to require minor excavation and retention of the upslope ground. The construction of the development will require the demolition of the existing structure. Excavation depths in the order of 3 m are anticipated for the under-croft area as shown on Image 1. Design drawings and foundation loads have not been provided at the time of writing; however, it is anticipated from similar type developments that foundation working loads for a four-level building will be in the order of about 1,500 kN to 2,500 kN under columns (depending on the column/wall spacing configuration). Image 1: Section view of proposed development 3.0 SITE DESCRIPTION The site has frontage to Duke Street along the southern end of the property boundary, with Douglas Lane along the northern property boundary. Mixed-use retail and residential buildings are situated to the east and west. The existing building is positioned on the southern half of the site. The topography on the northern half of the site generally comprises two breaks in slope, with measured slope angles of between 3° and 19° towards the south-east. A small retaining wall is located just to the north of the existing building. Photographs 1 to 3 show the general site conditions at the time of our investigation. Figure 1 in Appendix A displays the site layout. J001873-001-R-Rev0 Page 1
Page 4
Cambooya Pty Ltd Photograph 1: Looking approximately south-east along the eastern site boundary, from Douglas Lane. Photograph 2: Looking approximately south over the centre of the site. J001873-001-R-Rev0 Page 2
Page 5
Cambooya Pty Ltd
BH2
Photograph 3: Looking approximately north over the centre of the site from the western corer of the existing
building.
4.0 METHODOLOGY
Our investigation and assessment included the following:
A review of geological and landslide hazard overlay plans.
Subsurface investigation at two borehole locations.
A slope stability risk assessment in accordance with the Australian Geomechanics Society (AGS)
Guidelines for Landslide Risk Management (March 2007).
4.1 Fieldwork
Fieldwork was carried out on 9 February 2023. The subsurface investigation comprised two boreholes
(designated BH1 and BH2). Borehole BH1 was drilled with a 4WD-mounted auger rig to 6 m below ground
level (BGL), and borehole BH2 was hand-augered to 1.6 m BGL.
Dynamic cone penetrometer (DCP) testing was undertaken adjacent to/within the boreholes to assess soil
consistency/density.
The borehole locations are shown on Figure 1 in Appendix A, and Reports of Boreholes are presented in
Appendix B, together with explanatory notes. The ground conditions are discussed in Section 5.2.
The fieldwork was carried out by a geotechnical engineer from Core who logged subsurface conditions in
accordance with AS1726-2017 Geotechnical site investigations.
J001873-001-R-Rev0 Page 3
Page 6
Cambooya Pty Ltd
5.0 INVESTIGATION FINDINGS
5.1 Geology & Landslide Hazard Mapping
The Gympie Special Geology map 1 indicates that the site is underlain by Quaternary aged dune quartz sand,
as shown on the extract in Image 2.
Approximate site location
Image 2: Site geology from the Gympie Special Geology Map.
The Noosa Council Landslide Hazard overlay mapping, refer Image 3, indicates that the site is within an area
of moderate to high landslide hazard (susceptibility).
Location of subject site
Image 3: Extract from Noosa Council Landslide Hazard Overlay Map.
5.2 Ground Conditions
The natural subsurface conditions encountered in the boreholes generally comprised:
Topsoil between 0.2 m and 0.4 m thick, overlying
1
GYMPIE SPECIAL 100K 1:100,000 Geological Series. Map Sheet 9445 and Part 9545, First Edition, Department of Mines and Energy, Brisbane, 1999.
J001873-001-R-Rev0 Page 4
Page 7
Cambooya Pty Ltd
Loose grading to very dense dune sand (aeolian) with layers of weakly cemented indurated sand (i.e.,
‘coffee rock’; refer below for description of coffee rock formation).
Groundwater was not encountered in any of the boreholes.
Coffee rock on the Sunshine Coast: what, where and why?
Coffee rock is the colloquial term for cemented (indurated) sand, that often has the physical characteristics of
weathered rock.
It comprises ancient alluvial / aeolian sands of the Pleistocene age (2 million to 10,000 years ago). Coffee
rock is typically dark brown in colour, and when disturbed breaks up into dark brown silty sand (hence the
colloquial name ‘coffee rock’).
Cementation in these sands is thought to have occurred as a result of the interaction of organic matter and
mineral-rich sand, e.g., flocculation at the interface of a fluctuating groundwater level.
Coffee rock can be weakly or strongly cemented and is often discontinuous and of variable strength and
thickness. It is generally of low permeability, and often associated with high ‘perched’ groundwater.
On the Sunshine Coast, coffee rock is common at many locations along the coastline, generally buried under
younger alluvial soils (e.g., dune or beach sand). Coffee rock is often exposed and re-buried in the intertidal
zone by cycles of natural sand movement.
Previous investigations have found the coffee rock to be underlain by dense, non-cemented sand in most
areas, or soft alluvial clay in some instances.
Coffee rock presents geotechnical constraints and opportunities to infrastructure development and
maintenance, e.g., excavatability, groundwater management, and foundations. It is considered a key element
in the stability of the region’s coastline, likely providing protection from erosion and storm events.
6.0 GEOTECHNICAL RECOMMENDATIONS
6.1 Earthworks
6.1.1 Site Preparation & Filling
Prior to construction at-grade, the following works are recommended:
Strip the surface of existing vegetation and root affected soils and loose disturbed material likely to be
present following the demolition of the existing building. Localised deeper stripping/excavation may
also be required where larger tree root systems need to be removed and/or beneath the existing
building if any debris or remnant building items remain. Any organic rich topsoil must not be used as
fill in proposed building areas, however it may be used for non-structural purposes (i.e., landscaping).
‘Proof roll’ the stripped surface by several passes of a minimum 10 tonne smooth drum roller to
identify loose areas.
A suitably qualified and experienced geotechnical engineer should carry out inspections of the
subgrade to help identify any areas of unsuitable material or weak subgrade that may be present
following stripping. Loose and/or over dry sand will require moisture adjustment and compaction.
Loose areas identified by proof rolling should be treated by over excavation and re-compaction of the
natural aeolian sand (providing these are free from organic matter).
Contractors carrying out compaction of existing subgrade will need to be aware of potential damage to
adjacent buildings due to vibration effects. Compaction may need to be carried out without vibrations. We
also recommend undertaking a condition assessment (dilapidation survey) of adjacent and neighbouring
structures prior to commencement of earthworks. It would also be prudent to confirm the foundation systems
of the adjacent properties, to ensure that these foundations are not undermined during any excavation
works.
J001873-001-R-Rev0 Page 5
Page 8
Cambooya Pty Ltd Re-compaction of materials should be undertaken under ‘Level 1’ inspection and testing as detailed in Australian Standard AS3798-2007 Guidelines on Earthworks for Residential and Commercial Developments. Working platform assessments must be undertaken by a suitably qualified person (i.e., RPEQ geotechnical engineer) for large plant (e.g., cranes). 6.1.2 Temporary Batter slopes Temporary unsurcharged batters in loose to very dense sand up to 3 m vertical height should not be formed steeper than 1V:3H. Flatter batters may be required if localised instability or groundwater is encountered during construction. 6.1.3 Excavatability Cut excavations of up to about 3 m high are anticipated. Excavations within this depth range should be achievable with small to medium earthmoving equipment (i.e., 8 to 12 tonne excavators). Larger machinery will however improve production rates. Depending on the strength of cementation of the exposed indurated sand (i.e., coffee rock), ripping attachments may be required. 6.2 Foundations 6.2.1 Site Classification The site classification derived in accordance with Australian Standard AS 2870-2011 Residential slabs and footings is not directly applicable to developments of this type but can provide an indication of the likely magnitude of reactive (shrink and swell) movements associated with normal seasonal soil moisture variations; and be used for plumbing design. The site, in its state at the time of our investigation, would be classified as ‘Class ‘S’ in accordance with AS 2870-2011. The estimated characteristic ground surface movement due to seasonal moisture variation (‘ys’ value) is less than 20 mm. It should be noted that the predicted order of movement is based on the existing soil profile (i.e., no cutting or filling), and moisture content changes within soils due to normal seasonal moisture variations only (i.e., does not consider soil settlement). 6.2.2 Footing Design Conventional high-level strip and pad footings could be considered to support the proposed building. Footings should found at least 0.4 m into the underlying very dense sand, designed using an allowable bearing pressure of 400 kPa. Base on the investigation results this will mean footings up to about 1.2 m depth. Footing settlements would not be expected to exceed around 1 % of footing width for pads and strips, under serviceability loads. A geotechnical engineer must confirm the design bearing pressures during construction. Footing excavations must be dry and cleaned of any loose, disturbed, or saturated materials prior to pouring concrete. An alternative to standard footings would be the use of screw pier foundations. This option would reduce the risk of requiring deeper strip and pad footings if the loose soils are locally deeper in some areas. If any soil conditions encountered during the footing excavations are found to differ from those noted in the geotechnical investigation, Core should be notified immediately, and an assessment of the footing excavations should be carried out to assess if changes to footing design are required. All footings should found such that they are not adversely affected by any adjacent excavations, batter slopes, trenches, or retaining walls that are not designed to support building or fill loads. J001873-001-R-Rev0 Page 6
Page 9
Cambooya Pty Ltd
To minimise the potential for any adverse interaction effects, footings should found at least below a plane
extending 1 m horizontally from the base of trenches/batter slopes/excavations/retaining walls, then rising up
at 1V:1H. This requirement is illustrated in the following diagram.
6.3 Retaining Wall Design
It is anticipated that the proposed structure walls will retain the excavated soils, therefore, these
structure/retaining walls are considered to be ‘rigid’. Rigid walls are defined as being unable to rotate or tilt,
and should be designed using ‘at-rest’ earth pressure coefficients (K0), as given in Table 1.
Passive pressure (Kp) should be ignored where there is potential for in-ground services trenches (or similar)
in front of the wall.
Table 1: Lateral Earth Pressure Coefficients.
Lateral Earth Pressure
Coefficients
Bulk Friction
Retained Material Density Angle
(kN/m3) (degrees) Kp Ko
Loose sand 17 27 2.66 0.55
Medium dense Sand 18 32 3.26 0.47
Dense sand 19 37 4.02 0.4
Very dense sand 21 42 5.05 0.33
If appropriate, an allowance of 10 kPa should be made for lateral stress induced by compaction plant
operating behind the walls. The effects of surcharge should be included by multiplying the vertical pressure
developed by the surcharge by the appropriate lateral earth pressure coefficient from Table 1.
Drainage material behind the wall should be installed for the full height of the wall, for a width of at least
0.3 m. The material must be free draining and granular and have a perforated or slotted drainage pipe at the
heel of the wall to rapidly remove the water into the stormwater system. Alternatively, the wall will need to be
designed for the full hydrostatic pressure.
6.4 Drainage & Erosion Control
Site drainage should be designed to readily remove surface water and to prevent ponding of water.
Stormwater should be piped to an engineer-designed dissipation system. Concentrated surface water flows
(e.g., roof runoff) should be avoided.
J001873-001-R-Rev0 Page 7
Page 10
Cambooya Pty Ltd
7.0 STABILITY RISK ASSESSMENT
A qualitative slope stability risk assessment for the proposed structure has been carried out following the
AGS 2007 guidelines. The risk assessment relates to property. Relative levels of risk and their implications
are given in Table 2 below and the qualitative terminology (i.e., likelihood and consequence definitions) for
use in assessing risk to property are attached in Appendix C.
Table 2: Stability Risk Levels.
Risk Level Example Implications(1)
Unacceptable without treatment. Extensive detailed investigation and research,
VERY HIGH planning and implementation of treatment options essential to reduce risk to
VH
RISK Low; may be too expensive and not practical. Work likely to cost more than
value of property.
Unacceptable without treatment. Detailed investigation, planning and
H HIGH RISK implementation of treatment options required to reduce risk to Low. Work would
cost a substantial sum in relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but
MODERATE requires investigation, planning and implementation of treatment options to
M
RISK reduce risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
L LOW RISK Usually acceptable to regulators. Where treatment has been required to reduce
the risk to this level, ongoing maintenance required.
VERY LOW
VL Acceptable. Manage by normal slope maintenance procedures.
RISK
Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the
nature of the property at risk; these are only given as a general guide.
Table 3: Qualitative Risk Assessment for Property (Based on AGS 2007).
Assessed
Hazard Likelihood Consequence Comments
Risk
Shallow translational failure in the loose sands
Shallow failure of is considered Rare, and if the
soils above the recommendations in this report are
Rare Insignificant Very Low
footing zone (< 2m implemented, the consequence to property is
depth) assessed as Insignificant. The resulting
assessed risk is Very Low.
The likelihood of a deep failure through the
Deeper failure dense (or denser) sand is assessed as Rare
through soils below Rare Major Low based on the slope profile. Although the
footing depth consequence of such a failure would likely be
Major, the resultant risk is Low.
Refer Appendix C, Qualitative Risk Analysis Matrix (Australian Geomechanics Vol 42 No 1 March 2007).
Subject to the implementation of the recommendations in this report, it is our opinion that there is a Very Low
to Low Risk of global instability of the remediated retaining structure assessed in accordance with the AGS
guidelines (March 2007).
7.1 General Foundation Maintenance
The Queensland Building and Construction Commission (QBCC): A guide to preventing structural damage
V3 (2015) is attached in Appendix D for your information. This advice should be considered in the
construction and maintenance of the proposed development.
8.0 LIMITATIONS
Your attention is drawn to the document, Limitations which is attached in Appendix E.
J001873-001-R-Rev0 Page 8
Page 11
Cambooya Pty Ltd Core Consultants Pty Ltd Yours sincerely, Brodie Hare Geoff Hurley MEngSc BEng(Hons) MIEAust MSc DIC C.Geol RPEQ 5716 Geotechnical Engineer Principal Geotechnical Engineer BH/GAH/bh A.B.N. 75 603 384 050 J001873-001-R-Rev0 Page 9
Page 12
Appendix A Site Plan
Page 13
7079405
7079400
NE
LA
A S
U GL
7079395
DO
Breaks in slope
7079390
Small retaining wall
BH1
7079385
3º
19º
7079380 3º
BH2
Northing (m)
7079375
7079370
EXISTING BUILDING
7079365
7079360
7079355
ET
RE
ST
KE
7079350 DU
7079345
7079340
510980 510985 510990 510995 511000 511005 511010 511015 511020 511025 511030
Easting (m)
LEGEND
Denotes approximate borehole location
3º Denotes slope angle and direction
THIS DOCUMENT MUST BE READ IN CONJUCTION WITH CORE DOCUMENT J001873-001-L-Rev0.
BASE IMAGE FROM NEARMAP
DRAWN CLIENT: CAMBOOYA PTY LTD
BH
CHECKED GAH PROJECT:
Scale (m) PROPOSED MIXED-USE DEVELOPMENT
DRAWN 21/02/2023 36-38 DUKE STREET, SUNSHINE BEACH
0 2 4 6 8 DATE
CHECKED 22/02/2023 TITLE: SITE PLAN
DATE
ORIGINAL PROJECT NO.: FIGURE NO.: REV
A3 J001873 001 0
SIZE
Page 14
Appendix B Reports of Boreholes and Explanatory Notes
Page 15
REPORT OF BOREHOLE: BH1
East 510993.0 m
North 7079386.0 m MGA94 Zone 56 Sheet 1 OF 1
Client Cambooya Pty Ltd Surface RL 18.36 m AHD Logged: BH
Project Mixed-Use Development Contractor Core Consultants Pty Ltd Logged Date: 09/02/23
Location 36-38 Duke Street, Sunshine Beach Drill Rig Edson CP1 Checked: GAH
Job No. J001873 Inclination -90° Hole Dia. 100 mm Checked Date: 22/02/23
Drilling Sampling Field Material Description
GROUP SYMBOL
CONSISTENCY
PENETRATION
RECOVERED
DCP TEST
RESISTANCE
CONDITION
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION Blows per 100 mm
(metres)
WATER
FIELD TEST
DEPTH
LOG
DEPTH 0 5 10 15 20 25
RL
0
18.36 SP TOPSOIL SAND trace silt trace gravel: fine grained, brown;
gravel fine to medium grained, sub-angular; grass rootlets. L
0.20
18.16 SP SAND (AEOLIAN) trace silt trace gravel: fine grained, brown to
pale brown; gravel fine to medium grained, sub-angular.
D MD
L
Augered to this depth before
1.00 commencing test
1
17.36 SP SAND (AEOLIAN) with silt: fine grained, dark grey; tending to
indurated sand.
1.50
16.86 SP SAND (AEOLIAN) with silt: fine grained, dark grey; weakly
cemented.
2
CORE 2.01.1 LIB.GLB Log IS AU BOREHOLE 3 J001873-UNIT DEVELOPMENT-BH1-2.GPJ <<DrawingFile>> 21/2/2023 15:52 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Core 2.01.1 2020-05-19 Prj: Core 2.00 2020-03-24
Augered to this depth before
D- recommencing test
M
M
Not Encountered
ADT
3
VD
3.80
14.56 SP SAND (AEOLIAN) trace silt: fine to medium grained, brown
and orange brown.
4
L-M
4.50
13.86 SP SAND (AEOLIAN) with silt: fine grained, dark grey; weakly
cemented.
M
5
M
5.50
12.86 SM Silty SAND (AEOLIAN): fine grained, dark brown.
Augered to this depth before
6.00 recommencing test
6
Hole Terminated at 6.00 m
Target depth
Backfilled
This report must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical
purposes only, without attempt to consider possible contamination. Any references to potential contamination are for information
only and do not necessarily indicate the presence or absence of soil or groundwater contamination.
Page 16
REPORT OF HAND AUGER BOREHOLE: BH2
East 510998.0 m
North 7079376.0 m MGA94 Zone 56 Sheet 1 OF 1
Client Cambooya Pty Ltd Surface RL 15.90 m AHD Logged: BH
Project Mixed-Use Development Contractor Core Consultants Pty Ltd Logged Date: 09/02/23
Location 36-38 Duke Street, Sunshine Beach Drill Rig Hand Auger Checked: GAH
Job No. J001873 Inclination -90° Hole Dia. 50 mm Checked Date: 22/02/23
Drilling Sampling Field Material Description
GROUP SYMBOL
CONSISTENCY
PENETRATION
RECOVERED
DCP TEST
RESISTANCE
CONDITION
MOISTURE
SAMPLE OR
GRAPHIC
METHOD
DENSITY
SOIL/ROCK MATERIAL DESCRIPTION Blows per 100 mm
(metres)
WATER
FIELD TEST
DEPTH
LOG
DEPTH 0 5 10 15 20 25
RL
0
15.90 SM TOPSOIL Silty SAND: fine grained, dark brown; grass rootlets.
0.40
L
15.50 SP SAND (AEOLIAN) trace silt: fine grained, brown.
L
Not Encountered
HA
D
MD /
D
1
M-H D
1.20
14.70 Dark brown; tending to indurated sand.
>20
H VD
1.60
Hole Terminated at 1.60 m
Practical Refusal
Backfilled
2
CORE 2.01.1 LIB.GLB Log IS AU BOREHOLE 3 J001873-UNIT DEVELOPMENT-BH1-2.GPJ <<DrawingFile>> 21/2/2023 15:53 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Core 2.01.1 2020-05-19 Prj: Core 2.00 2020-03-24
3
4
5
6
This report must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical
purposes only, without attempt to consider possible contamination. Any references to potential contamination are for information
only and do not necessarily indicate the presence or absence of soil or groundwater contamination.
Page 17
EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
USED ON BOREHOLE AND TEST PIT REPORTS
DRILLING/EXCAVATION METHOD
AS Auger Screwing RD Rotary blade or drag bit NQ Diamond Core - 47 mm
AD Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm
*V V - Bit RAB Rotary Air Blast HQ Diamond Core - 63 mm
T TC - Bit, e.g. ADT RC Reverse Circulation HMLC Diamond Core – 63mm
HA Hand Auger PT Push Tube BH Tractor Mounted Backhoe
ADH Hollow Auger CT Cable Tool Rig EX Tracked Hydraulic Excavator
DTC Diatubre Coring JET Jetting EE Existing Excavation
WB Washbore or Bailer NDD Non-destructive digging HAND Excavated by Hand Methods
PENETRATION/EXCAVATION RESISTANCE
L Low resistance . Rapid penetration possible with little effort from the equipment used
M Medium resistance. Excavation possible at an acceptable rate with moderate effort from equipment used
H High resistance to penetration/excavation. Further penetration is possible at a slow rate
R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement
or machine.
These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling tools,
and the experience of the operator.
WATER
Water level shown at date Partial water loss
Water inflow Complete water loss
GROUNDWATER NOT The observation of groundwater whether present or not, was not possible due to drilling water, surface seepage or cave in
OBSERVED of the borehole/test pit.
GROUND WATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be present in less permeable strata.
ENCOUNTERED Inflow may have been observed had the borehole/test pit been left open for a longer period.
SAMPLING AND TESTING
SPT Standard Penetration Test to AS1289.6.3.1-2004
4,7,11 N=18 4,7,11 = Blows per 150mm N = Blows per 300mm penetration following 150mm seating
30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported
RW Penetration occurred under the rod weight only
HW Penetration occurred under the hammer and rod weight only
HB Hammer double bouncing on anvil
DS Disturbed Sample
BDS Bulk disturbed sample
G Gas Sample
W Water sample
FP Field permeability test over section noted
FV Field vane shear test expressed as uncorrected shear strength (sv = peak value)
PID Photoionisation Detector reading in ppm
PM Pressuremeter test over section noted
PP Pocket penetrometer test expressed as instrument reading in kPa
U63 Thin walled tube sample - number indicates nominal sample diameter in millimetres
WPT Water pressure tests
DCP Dynamic cone penetration test
CPT Dynamic cone penetration test
CPTu Static cone penetration test with pore pressure (u) measurement
ROCK CORE RECOVERY
TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quantity Designation (%)
Page 18
METHOD OF SOIL DESCRIPTION USED ON BOREHOLE AND TEST PIT
REPORTS
FILL CLAY (CL,CI, or CH)
GRAVEL (GP or SW) ORGANIC SOILS (OL or OH or Pt)
SAND (SP or SW) COBBLES or BOULDERS
SILT (ML or MH)
Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.
CLASSIFICATION AND INFERRED STRATIGRAPHY
Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in AS 1726 - 2017. The material proper-
ties are assessed in the field by visual/tactile methods.
PARTICLE SIZE PLASTIC PROPERTIES
Major
Sub Division Particle Size
Division
Boulders >200 mm
Cobbles 63 - 200 mm
Gravel Coarse 20 - 63 mm
Gravel Medium 6.7 - 20 mm
Gravel Fine 2.36 - 6.7 mm
Sand Coarse 0.6 - 2.36 mm
Sand Medium 0.21 - 0.6 mm
Sand Fine 0.075 - 0.21 mm
Silt 0.002 - 0.075 mm
Clay <0.002 mm
MOISTURE CONDITION FOR COARSE GRAINED SOIL AS 1726 - 2017
Symbol Term Description
D Dry Non-cohesive and free running
M Moist Soil feels cool, darkened in colour, tends to stick together
W Wet Soil feels cool, darkened in colour, soil sticks together, free water forms when handling
MOISTURE CONDITION FOR FINE GRAINED SOIL AS1726 - 2017
Symbol Term Description
W<PL Moist dry of liquid limit Hard and friable or powdery
W = PL Moist near plastic limit Soils can be molded at a moisture condition approximately equal to the plastic limit
W >PL Moist, wet of plastic limit Soils usually weakened and free water forms on hands when handling
W = LL Wet near plastic limit
W > LL Wet, wet of liquid limit
CONSISTENCY TERMS FOR AS1726—2017 RELATIVE DENSITY OF COARSE GRAINED SOILS AS1726—2017
COHESIVE SOILS
Symbol Term Density Index % SPT ‘N’ #
Symbol Term Undrained Shear
VL Very Loose Less than 15 0 to 4
Strength
L Loose 15 to 35 4 to 10
VS Very Soft 0 to 12 kPa
S Soft 12 to 25 kPa MD Medium Dense 35 to 65 10 to 30
F Firm 25 to 50 kPa D Dense 65 to 85 30 to 50
St Stiff 50 to 100 kPa VD Very Dense Above 85 Above 50
VSt Very Stiff 100 to 200 kPa In the absence of test results, consistency and density may be assessed from correlations with
the observed behaviour of the material.
H Hard Above 200 kPa
Page 19
TERMS FOR ROCK MATERIAL STRENGTH & WEATHERING AND
ABBREVIATIONS FOR DEFECT DESCRIPTIONS
ROCK MATERIAL STRENGTH CLASSIFICATION AS1726—2017
Symbol Term Uniaxial Point Load Field Guide
Strength Is (50)
Compressive
(MPa)
Strength (MPa)
VL Very Low 0.6 to 2 0.03 to 0.1 Material crumbles under firm blows with sharp end of pick. Pieces up to 30 mm thick can
Strength be broken with finger pressure.
L Low Strength 2 to 6 0.1 to 0.3 Easily scored with knife. Indentations 1 mm to 3 mm show in the specimen with firm
blows of the pick point. A piece of core 150 mm by 50 mm may be broken by hand. Sharp
edges of core are friable and break during handling.
M Medium 6 to 20 0.3 to 1 Readily scored with a knife. A piece of core 150 mm by 50 mm can be broken by hand
Strength with difficulty.
H High Strength 20 to 60 1 to 3 A piece of core 150 mm by 50 mm cannot be broken by hand but can be broken by a pick
with a single firm blow. Rock rings under hammer.
VH Very High 60 to 200 3 to 10 Hand specimen breaks with pick after more than one blow. Rock rings under hammer.
Strength
EH Extremely High Above 200 Above 10 Specimen requires many blows with geological pick to break through intact material. Rock
Strength rings under hammer.
= Diametral Point Load Test = Axial Point Load Test
CLASSIFICATION OF MATERIAL AS1726—2017
WEATHERING
Symbol Term Field Guide
RS Residual Soil (Note 1) Material is weathered to such an extent that it has soil properties. Mass structure and material texture and
fabric of original rock are no longer visible but the soil has not been significantly transported.
XW Extremely Weathered Material is weathered to such an extent that is has soil properties. Mass structure and material texture and
(Note 1) fabric of original rock are still visible.
HW Highly Weathered (Note 2) The whole rock mass is discoloured, usually by iron staining or beaching to the extent that the colour of the
original rock is not recognizable. Rock strength is significantly changed by weathering. Some primary miner-
als have weathered to clay minerals. Porosity may be increased by leaching, or may be decreased due to
deposition of weathering products in pores.
MH Moderately Weathered The whole of the rock material is discoloured, usually by iron staining or bleaching to the extent that the
(Note 2) colour of the original rock is not recognizable, but shows little or no change in strength from fresh rock.
SW Slightly Weathered Pock is partially discoloured with staining or bleaching along joints but shows little or no change of strength
from fresh rock.
FR Fresh Rock shows no signs of decomposition of individual minerals or colour change.
Note 1 The term ‘Extremely Weathered rock’ is misleading as the material has soil properties. The word ‘rock’ should be replaced with the name
of the original rock of the word ‘material’, eg. Extremely Weathered granite or Extremely Weathered material.
Note 2 Where it is not possible to distinguish between ‘Highly Weathered’ and ‘Moderately Weathered’ rock the term ‘Distinctly Weathered’ may
be used.
DEFECT TYPE/DESCRIPTION DEFECT PROFILE DEFECT ROUGHNESS
Symbol Description DESCRIPTION
B Bedding Parting V Vein
PL Planar
Symbol Description
J Joint HB/DB Handling/Drilling St Stepped
Break Sl Slickenside
Un Undulating
EW Extremely Weathered C Contact Sm Smooth
DEFECT INFILL DESCRIPTION
Seam
Symbol Description Ro Rough
FZ Fracture Zone L Cleavage Vertical Boreholes - The dip
Cn Clean: No visible
coating (inclination from horizontal) for the
CZ/S Crushed Zone/Seam X Foliation defect is given.
Sn Stain: Coated 1 to
3 mm Inclined Boreholes - The inclination
IS Infilled Seam S Schistocity is measured as the acute angle to the
Vr Veneer: < 1 mm core axis.
SZ/S Sheared Zone/Seam Ct Coating: 1 to 3
mm
Page 20
Appendix C Qualitative Terminology for Use in Assessing Risk to Property (AGS 2007)
Page 21
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OF LIKELIHOOD
Approximate Annual Probability
Implied Indicative Landslide
Description Descriptor Level
Indicative Notional Recurrence Interval
Value Boundary
10-1 5x10-2
10 years The event is expected to occur over the design life. ALMOST CERTAIN A
20 years The event will probably occur under adverse conditions over the
-2
10 100 years
design life.
LIKELY B
-3
-3 5x10 200 years
10 1000 years The event could occur under adverse conditions over the design life. POSSIBLE C
5x10-4 2000 years
The event might occur under very adverse circumstances over the
10-4 10,000 years
design life.
UNLIKELY D
-5 5x10-5 20,000 years
10 The event is conceivable but only under exceptional circumstances
100,000 years RARE E
over the design life.
-6 5x10-6 200,000 years
10 1,000,000 years The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor Level
Indicative Notional
Value Boundary
Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200% CATASTROPHIC 1
stabilisation. Could cause at least one adjacent property major consequence damage.
100%
Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
60% MAJOR 2
stabilisation works. Could cause at least one adjacent property medium consequence damage.
40%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
20% MEDIUM 3
Could cause at least one adjacent property minor consequence damage.
10%
5% 1% Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4
Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
0.5% INSIGNIFICANT 5
notional boundary of 0.1%. See Risk Matrix.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa
91 Australian Geomechanics Vol 42 No 1 March 2007
Page 22
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)
QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
LIKELIHOOD CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
Indicative Value of 1: CATASTROPHIC 2: MAJOR 3: MEDIUM 4: MINOR 5:
Approximate Annual 200% 60% 20% 5% INSIGNIFICANT
Probability 0.5%
A – ALMOST CERTAIN 10-1 VH VH VH H M or L (5)
-2
B - LIKELY 10 VH VH H M L
C - POSSIBLE 10-3 VH H M M VL
D - UNLIKELY 10-4 H M L L VL
-5
E - RARE 10 M L L VL VL
-6
F - BARELY CREDIBLE 10 L VL VL VL VL
Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time.
RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
VH VERY HIGH RISK options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
H HIGH RISK
risk to Low. Work would cost a substantial sum in relation to the value of the property.
May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
M MODERATE RISK implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
L LOW RISK
required.
Acceptable. Manage by normal slope maintenance procedures.
VL VERY LOW RISK
Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
given as a general guide.
92 Australian Geomechanics Vol 42 No 1 March 2007
Page 23
Appendix D A Guide to Preventing Structural Damage V3 (QBCC 2015)
Page 24
A guide to preventing structural damage Build better.
Page 25
Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from - under normal conditions. The movement in clay soils caused by performance of footings under this varying moisture conditions around the standard requires normal conditions to perimeter of homes. be maintained around the house. The majority of Queensland homes This guideline identifies abnormal are situated on what are termed conditions that should be avoided reactive clay soils. These soils are and/or corrected. subject to expansion and contraction Dry seasons cause soils to dry out depending on seasonal weather and rapidly. Wet seasons cause soils to site conditions. Sandy sites and rocky become wet quickly. This results in terrain are usually not prone to this sudden extreme volume changes and expansion and contraction. movement in soil. In Queensland, engineers design Abnormal conditions (other than footings to the Australian Standard seasonal changes), may include the AS2870 – 2011 Residential slabs effect of trees, poor surface drainage and footings. Footings correctly and/or leaking plumbing. If not allowed designed to this standard are intended for in the engineer’s design, these to accommodate the expected types of abnormal conditions may lead movements caused by seasonal to movement and damage varying volume changes in the soil (swelling from minor to extreme. when wet and shrinking when dry) NORMAL MOVEMENT EXPECTATIONS FOR BUILDINGS CONSTUCTED ON REACTIVE CLAY SOILS
Page 26
How much can the soils under my
house move?
The amount of movement that may occur depends on the site classification,
which is defined under the Australian Standard AS2870.
The relevant classifications and expected movements under normal site
conditions and seasonal influences are:
Site Description of type of clay and reactivity Expected range of
classification movement
A Mostly sand and rock with little or no ground movement 0
from moisture changes.
S Slightly reactive clays that do not present significant 0 to 20mm
trouble. Very limited damage could be expected in the life
of the building.
M Moderately reactive clays that may cause minor 20 to 40mm
movement and damage in the life of the building.
Reasonable care is required in planning the site.
H Highly reactive clays have potential to move more, and H1 40 to 60mm
(H1 & H2) react to variable moisture change conditions. Some minor
damage may occur in the life of the building under normal
H2 60 to 75mm
conditions. More significant damage may occur where site
maintenance conditions are a problem e.g. influence of
trees or leaking underground plumbing or poor drainage.
Particular care is required in planning the site.
E Extremely reactive clays have the potential to react >75mm
significantly to any variable moisture changes in the
foundation clays and require significant attention to
(Note: Movements
detail in planning the site works. Extreme movement and
on E sites have been
damage may occur if the site conditions and foundation
known to move up
maintenance requirements are not observed. Footing
to and in excess
systems and site conditions on “E” sites require very
of 100 to 150mm
detailed specification from an engineer.
in SE Qld)
Page 27
Is it normal to expect cracking
to occur in brickwork, walls
and ceilings?
Yes, damage in varying degrees can
be expected in the life of the building Key points to consider when
depending on the relevant site planning landscaping to avoid
classification. structural damage.
If cracking becomes apparent the site • Plan type and location of
maintenance conditions should be gardens, paths, driveways,
checked as noted under “key points lawns, filling and retaining walls
to consider...” • Take care in selection of trees
Corrective action should be carried out and shrubs. Do not over plant
immediately and may include regrading next to the house
surface drainage, moving gardens and • Keep trees with high water
trees or repairing leaks in water supply, demand well away from
stormwater and/or sewer drainage. buildings in reactive clay areas.
A sound plan for a reactive clay site • Avoid variable conditions
is to provide a consistent moisture around the house and maintain
regime around the building by installing adequate moisture/watering.
paths and patios against the house. Do not over water and avoid
Locate lawns up against paths & patios. the use of unregulated
Garden beds, the most heavily watered sprinkler systems.
parts of a garden, should be kept well
• Locate ponds and water
away from the house.
features away from the house.
If gardens must be placed in close
• Direct surface water away from
proximity to the house, they should be
the house. Do not allow water
sealed with plastic and contain only
to be trapped or pond near
a few small plants. Take care not to
the house.
trap water against the building if using
garden edging. • Repair leaking pipes and taps.
Caution: Care should also be taken if Note: these issues should be
placing filling against the house. Always considered as part of planning
ensure weep holes are not covered and maintaining the home. Aim
and that existing Termite Management to provide a consistent moisture
Systems are not compromised. regime around the house. This will
minimise soil moisture variations
that may cause movement and
result in structural damage.
Page 28
Common sense guidelines for
landscaping and gardens
1. Gardens
Important: It is quite impractical to try If gardens must be placed in close
to prevent gardening activities from proximity to the house, they should be
increasing the moisture content sealed with plastic and contain only
around the foundations of your a few small plants. Take care not to
home. The only practical course is to trap water against the building if using
keep such activities away from the garden edging.
immediate vicinity of the building and Caution: Care should also be taken
so minimise their effects. if placing filling against the house.
A sound plan for a reactive clay site Always ensure weep holes are not
is to provide a consistent moisture covered and that existing Termite
regime around the building by installing Management Systems are not
paths and patios against the house. compromised.
Locate lawns up against paths & patios.
Garden beds, the most heavily watered
parts of a garden, should be kept well
away from the house.
RECOMMENDED LAYOUT FOR GARDENS AND LANDSCAPING
TREES AND
Trees and GARDEN
garden bedsBEDS REQUIRING
requiring HEAVY WATERING
heavy watering SHOULD
should be kept BE KEPT from
well removed WELL REMOVED
the dwelling.
FROM THE DWELLING.
Page 29
2. Paths, patios and driveways
Paths should be laid hard against Concrete pavements should be
brickwork or footings with a fall away constructed in a way that will not
from the house to a stormwater impede surface water flowing away
discharge point. from the building or cause water to
Avoid placing large expanses of pond adjacent to the footings causing
concrete on one side of the house clay foundations to swell.
and heavily watered garden beds On “H” & “E” site classifications,
on the other. particular detail is required to prevent
The water saturated clay in the gardens pavement from moving away from
will expand and swell while the soil the building. Movement in paths could
under the concrete may not move. cause stress on pipes and inspection
Structural damage can result from openings and/or breakages in pipes.
this unco-ordinated movement. Resulting leakages may cause
movement and damage as a result of
clay soils under the house swelling.
RECOMMENDED LANDSCAPING
Page 30
3. Lawns 5. Excessive watering of gardens
If placing lawn areas against the house, and lawns
ensure that filling built up against the
The erection of a building also
wall is graded away and will not allow
indirectly brings with it changes in the
ponding of water to occur. The filling
moisture content to the site. While it
should be impervious clay soil and not
is normal to water gardens and lawns,
sandy loam.
excessive or over watering should be
REMEMBER: Do not cover weep holes. avoided. Consistent and adequate
watering should be observed at all
4. Filling times.
Prior to preparing for gardens, lawns or The location of sprinkler systems next
filling as part of site works, care should to houses should also be avoided on
be taken to ensure the sub-grade or H and E sites.
ground level is graded or sloped away, Sprinkler systems should be as well
especially when filling or top dressing controlled and maintained as practical,
with sandy loam. The sub-grade should and only used in gardens and on lawns
consist of impervious natural site clay. away from the building.
Where elevated floors exist ensure that
the final finished ground level outside
the house is not higher than the sub-
floor area and that water cannot flow
back under the house.
Page 31
6. Site drainage and sloping sites
Design for site conditions, location of
retaining walls, paths, swimming pools,
future structures or proposed extensions
etc. should all be considered when
preparing the site for correct surface
water flow.
If the ground slopes towards the house,
paths with spoon drains should be
provided.
It is also important to place drains uphill
of the footings so as to direct water
around the house and away from the
footings. A stormwater and roof water Seek advice from an engineer
drainage management plan should be
1. To ascertain surface falls which
considered and take into account water
allow for the specific potential
flowing from adjoining properties.
soil movement of the site without
loss of free drainage
2. To provide correct mechanical
connection of perimeter paths
of footings
RECOMMENDED DRAINAGE AND
MAINTENANCE ADJACENT TO DWELLING
Page 32
7. Trees and shrubs
The roots of trees and shrubs can Height of Tree(h)
affect footings by removing moisture Distance from house (d)
from clay soils immediately underneath d = 1 h for class H and M sites.
the building causing subsidence as the
d = 1.5 h for class E sites.
clays shrink.
d = 2 h for rows or groups of trees.
In its search for water, a tree root
system can spread a lateral distance 10 to 20 20 to 30 30 to 60
equal to the height of the tree. If in metres metres metres
rows or grouped with other trees the Acacias But-But Blue Gum
roots may spread up to twice the
Ash Cedars Cypress
height of the tree.
Athel Tree English Oak English Elm
Care should be taken when selecting
trees and, as a guide, the trees listed Candlebark Lemon Gum Figs
should not be planted within the Manna Gum Palms Karri
distance of their mature height from Pepper tree Planes Pines
the house depending on the site
Willows Sheoaks Poplars
classification and whether they are to
be planted in a line or in a group. Yate Silky Oak River Gum
Yellow Gum Spotted Sugar
Gum
Casuarina
TREES AND SHRUBS
Page 33
Summary of owner responsibilities for houses under warranty 1. Maintain the site drainage at all times. 5.Do not plant trees within a distance 2.Do not alter the site drainage provided from a building that equates to by the builder. Any changes to the site their mature height. Always plant in drainage should ensure that water will accordance with the requirements for be directed away from the building the relevant site classification. and not pond adjacent to the footing 6.Regularly check and maintain and slab system. Care should also be plumbing, drainage and stormwater taken to avoid directing water flow to systems by immediately carrying adjoining properties. out repairs to leakages or breakages 3.Where possible on reactive clay sites when observed (usually displayed by (Type M,H,E Classifications), avoid seepage and/or greener lawns etc.), placing gardens or installing garden or when minor damage or cracking edging, gravel pavements etc next to exceeding 3-5mm appears in walls the building. This may cause water or ceilings. retention and/or promote a greater By observing these requirements, variation in moisture conditions movement and damage which may be around the building. expected in the life of the building can 4.Installation of sprinkler systems be minimised and maintained within next to dwellings on highly and normal performance requirements. extremely reactive sites (Type H & E Classifications) should be avoided. Adequate and consistent watering only is recommended. Over watering should be avoided. UNSATISFACTORY METHOD FOR CREATING SURFACE FALL AWAY FROM DWELLING
Page 34
Notes: Note: this document has been developed to provide homeowners with general guidance on the maintenace of their homes. It does not purport to address site specific issues. Homeowners should seek professional advice from their builder or engineer when they experience movement in their home or need advice on issues which may affect their home.
Page 35
Need more information?
Visit qbcc.qld.gov.au or call us on 139 333.
QBCC20150210_FCTbrstructuraldamageV3
299 Montague Road,
West End Qld 4101
GPO Box 5099,
Brisbane Qld 4001
T: 139 333
F: 07 3225 2999
W: qbcc.qld.gov.au
Page 36
Appendix E Limitations
Page 37
LIMITATIONS This Document has been provided by Core Consultants Pty Ltd (“Core”) subject to the following limitations: This Document has been prepared for the particular purpose outlined in Core’s proposal and no responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for any other purpose. The scope and the period of Core’s Services are as described in C o r e ’s proposal, and are subject to restrictions and limitations. Core did not perform a complete assessment of all possible conditions or circumstances that may exist at the site referenced in the Document. If a service is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not assume that any determination has been made by Core in regards to it. Conditions may exist which were undetectable given the limited nature of the enquiry Core was retained to undertake with respect to the site. Variations in conditions may occur between investigatory locations, and there may be special conditions pertaining to the site which have not been revealed by the investigation and which have not therefore been taken into account in the Document. Accordingly, additional studies and actions may be required. In addition, it is recognised that the passage of time affects the information and assessment provided in this Document. Core’s opinions are based upon information that existed at the time of the production of the Document. It is understood that the Services provided allowed Core to form no more than an opinion of the actual conditions of the site at the time the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings, or any laws or regulations. Any assessments made in this Document are based on the conditions indicated from published sources and the investigation described. No warranty is included, either express or implied, that the actual conditions will conform exactly to the assessments contained in this Document. Where data supplied by the client or other external sources, including previous site investigation data, have been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is accepted by Core for incomplete or inaccurate data supplied by others. Core may have retained subconsultants affiliated with Core to provide Services for the benefit of Core. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have any direct legal recourse to, and waives any claim, demand, or cause of action against, Core’s affiliated companies, and their employees, officers and directors. This Document is provided for sole use by the Client and is confidential to it and its professional advisers. No responsibility whatsoever for the contents of this Document will be accepted to any person other than the Client. Any use which a third party makes of this Document, or any reliance on or decisions to be made based on it, is the responsibility of such third parties. Core accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this Document. Limitations Page 1 of 1 Date: 12/07/2018 FRM-065 Uncontrolled When Printed Issue: 1.02
Page 38
CLIENTCHOICE Awards CLIENTCHOICE Awards 2022 2022 e e G BEST CONSULTING. ENGINEERING FIRM
Used in these records
Appendix E - Geotechnical Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.