Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

07/0521 - MCU - Detached House - Bud Brannigan Architect [As Published] · 132007.521

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

a NceeKy we Checklist - Applications Involving Land
Development & Land Use Sections

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1. APPLICATION FORMS — Ce
1.1. FormiPartA
1.1.1 Ensure that the form is fully completed. S

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

 

1.4.2.1 Ensure that each of Forms B-O which are attached are fully completed. [/]

2.. REFERRAL.INFORMATION, ~ _ dee em ee ne atl

2.4 Ensure that items 1-23 have been checked and/or completed with | regard to referrals.

3, ENVIRONMENTALLY RELEVANT ACTIVITIES 0 TOT a
3.1. Ensure that Part G is completed if EPA referral is required. 7

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

‘4, ° FORM 2- REQUEST.TO CHANGE APPROVAL ne opt

41 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

5. PLANS - : . . . an . ar!
5.1. Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! uy
Works) accompanies the application. In addition ensure that each set is complete. +
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is vw
unbound.

6. SUPPORTING INFORMATION .

6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is

capable of reproduction. [7]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. J

7. FEE. ye -
7A Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid. Y
7.2 Ensure that the fee which has been paid is recorded on the application form. “1

Receiving Officer PSK neo ba fevecveeteseseneceees Date 2Yal29 beeeeseneees

Having completed this form and accepted the\adplication, please deliver both to the following IDAS Application Receiving

trays:-

¢ ‘If the application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

e  Inall other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

 

 

 

 

 

 

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 29 pages

Page 2

BUD BRANNIGAN

ARCHITECT

1 MARCH, 2007

. Chief Executive Officer,
Noosa Council,
P.O. Box 141,
TEWANTIN. Q. 4565.

ATTENTION : Land Use Section
Dear Sir/Madam,

RE: PROPOSED NEW RESIDENCE,
16 SHEARWATER STREET, PEREGIAN BEACH

i

With reference to the above, and further to our recent meetings, are Development Application
documents for your consideration, ‘comprising application forms { iDAS Forms A and D, checklist ),
and architecturat drawings { SD01B, SD02B, SDO3A, SDO4A, SDOSA, SDO6A, SD07A, SDO8A, SDOPA },
together with a report.

If you have any queries about any of the above, please do not hesitate to contact me.

Yours Faithfully,

bd Wn—_Ager-e.

Bud Brannigan

 

 

 

6} LUGG STREET
BARDON
Q  . ,
4065

@ O7 3368 3105
wat CR MEE tee ees

Page 3

BUD BRANNIGAN
ARCHITECT

Ll
1 MARCH, 2007
. DEVELOPMENT APPLICATION REPORT
PROPOSED NEW RESIDENCE,
16 SHEARWATER STREET, PEREGIAN BEACH
LOT 425 ON P93116
PROPOSAL OVERVIEW . . \
The proposal is for the construction of a new residence at 16 Shearwater Street, Peregian Beach,
Lot 425 on P93114. The proposed new work requires the demolition and removal of an existing
residence, together with the removal of a number of existing trees ( refer architectural drawing no.
$D02B }.
COMPLIANCE REQUIREMENTS
DESIGN AND SITING OF BUILDING
BUILDING HEIGHT
The proposal does not exceed 8 metres above the site's natural ground level.
Number of storeys
The building contains two storeys, together with basement space at the westem end of the house,

together with air space, both types of spaces being indicated on the architectural drawings. The
latter spaces are in accordance with Implementation Note 2, April 2006, of the Noosa Plan.

BUILDING SETBACKS
Road Setback

Concession is sought under the conditions of the Queensland Development Code Part 12 - Design
and Siting Standard, as per the following :

 

PERFORMANCE CRITERIA _

ACCEPTABLE SOLUTION

 

Pi The location of a building or structure
facilitates an acceptable streetscape for —

A1 a. For a dwelling, the minimum road setback
is-

 

6 metres; or

where there are existing dwellings

on both adjoining lots and at least

one is set back between 3m and

6m, and the difference between

their road setbacks is —

(A) not more than 2metres - a
distance between the two
dwellings

+ the bulk of the building or structure; and
the road boundary setbacks of
neighbouring buildings or structures:
and

the outlook and views of neighbouring
residents; and ,

nuisance and safety to the public

ti)
ti

The road setback on the adjacent property to
the north of 16 Shearwater Street Is 5 metres.
The road setback to the existing house at 16
Shearwater Street Is 5 metres.

The property immediately to the south of 16
Shearwater Street Is a public beach accessway
easement.

_| The road setback for the new proposal Is 5
metres ( refer to architectural drawings ).

 

 

 

61 LUGG STREET
BARDON
Q

4065

@O7 3368 3105
FAX O7 3368 3572

 

Page 4

Side Boundary Clearance

Northem and southem side, and rear { eastern } boundary clearances are compliant with the
Queensland Development Code Part 12 - Design and Siting Standard :

 

PERFORMANCE CRITERIA

ACCEPTABLE SOLUTION

 

 

P2 Buildings and structures ~
- provide adequate daylight and
ventilation to habitable rooms; and
- allow adequate daylight and
ventilation to habitable rooms on
adjoining tots.

 

A2 (a) The side and rear boundary clearance
for a part of a building structure is -

(i} where the height of that part is 4.5
m or less — 1.5m;
(ii) where the height of that part is
greater thah 4:5m but not more
- than7.5m — 2m

(iii) where the height is greater than
’ 7.59 - 2m plus 0.5m for every 3m or

part exceeding 7.5m

The proposal compiles with (il) and (ill) above.

 

ROOF PITCH -

The proposed roof pitch iss degrées minimum.
SITE COVER

The proposed site cover is 40 %.

COASTAL PROTECTION PRECINCT

The site is located within the Coastal Protection Precinct, and the proposal is in partial accordance
with the requirements of Table 13.17 of the Noosa Plan, as per the following. Concession is sought

where indicated :

 

SPECIFIC OUTCOMES

PROBA BLE SOLUTIONS

 

 

Coastal Protection Precinct and Erosion Prone
Areas-Eastern Beaches Locality

017 The siting and design of development and
materials used within the Coastal Protection
Precinct.as identified on the Natural Resources
Overlay Maps, do not cause any significant
adverse impacts on the coastal resources of the
location nor interrupt the natural cycles of
erosion and accretion of foreshore areas and
beaches :

AND

 

$17.1 Buildings and ofher structures including
swimming pools, retaining walls and
landscaped teraces,,but excluding
cantitevered deck that are unclovered and
unenclosed-
a) donot extend seaward of the coastal
- building line: or
b) where a coastal 5uilding fine does not
exist on properties fronting the
beachfront or reserve adjoining the
beachfront-are setback a minimum of
&m from the seaward boundary of the
site: .
The proposed rear ( beachside ) house wall is
set back ém from the seaward boundary.
AND

 

 

 

Page 5

 

 

018 Buildings, structures and works within the
Coastal Protection Precinct that are visible from
the beach-

-a} are designed to protect the character’
of the beachfront when viewed from
the water and integrate with the

. surrounding natural landscape and
skyline vegetation: and
b} are finished predominanily in colours
and hues of the surrounding natural
landscape;

 

$17.2 Cantilevered decks that are uncovered
and unentlosed located seaward of the
coastal building line- .

a) donot extend seaward of the average
of the outermost seaward projection of
buildings on directly adjoining
properties; and

b). are a maximum depth of 3m;

c) are setback a minimum of 6m from the
seaward boundary of the site:

Council concession Is sought. A 3m deep

cantlievered deck Is located on the seaward
side of the house. The deck Is covered witha
lightweight roofing to provide protection form

_| the sun for the property owners, and contains a

screen on the southern side, to provide privacy
and security from the adjacent public
accessway.

AND .

$17.3 Where a coastal building line does not
exist on properties fronting the beachfront or a
reserve adjoining the beachfront-
Cantilevered decks are setback a minimum of
6m from the seaward boundary of the site;

Council concession Is sought. The average rear
setback to walls of the proposed house Is in the
order of 12.5 metres { ranging from 16 through
13.5 to 6 metres ). The cantilevered deck will be
lightweight In materials and nature.

AND

$17.4 Dense iandscaping, comprising a mix of
native coastal species of ground cover, scrubs
and trees, is provided for a width of 5m from the
seaward or rear boundary of the site to provide
adequate landscape buffering to protect the
coastal dune system.

The property owners intend to undertake a
landscape program In accordance with the
above. :

$18.1 The proposed new residence will not be
visible from the beach.

 

 

Page 6

 

 

AND '

O19 Rear- fences adjacent to the beachfront
within the Coastal protection Precinct are
designed and sited to be sympathetic with the
visual amenity of the beachfront character.

 

$19.1 The proposed rear fence will be -

- 1.2 metres In height

- open construction ( 50% transparency )

- timber

- colours to blend with the natural
landscape

AND

$19.2 The rear fence will not contain a gate.

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

     

eee see enieneve eon

Common details  /

 

The completion of alt applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.qov.au,
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 4.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fnctuding house number, street name, suburb/ocality name & postcode) (if applicable)

Alt land the subject of the application, must be

identified. Howaver, a description ofthe land is not [ 16 SHEARWATER STREET, PEREGIAN BEACH. Q. 4573 |

eee aceon naw eee 2. Name of water body or watercourse, within which the development is proposed: (if epplicabie)

Advice for completing Q2 - Q2 applies if

development is proposed within a water body or [ — - |

watecourse, 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:

Advice for completing Q3 - Most land can be

Kents by alton pen deste. These dts [ LOT 425 ON P93116 |

ealgoennet ' |4, ‘The above description is for: (ick applicable box)

However, if the land on which the development is [XJ (i) the land on which the development is proposed; or

Meee panpocad ra waterbody or | fe C (ii) the land adjoining the water body or watercourse, within which the development is

watercourse) provide - proposed; or

o aang or ine CO (iii) the water body or watercourse.

i) GPS coordi here there i

® ehoinnaladlrent Ind foe Noraion Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):

Advice for completing Q7 - O7 does not apply if the

development is within a water body or watercourse, | 2 [ 546 SQ. METRES
- lies + . + . . 7 ,

Se Ne ccrarent ee. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ete.) (if applicable}

Note: Areas below high water mark are not within a RI

Jocal govemment's area unless provided for under the | NOOSA SHIRE

Loca! Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the

Advice for completing 09 - Q9 appties if j |. ite) (i

development is on strategic portland or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)

port land tidal area, For more details refer to Guide 41. [ |

Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)

if there Is insufficient room available, details may be

provided In an attachment to the application. [ DETACHED HOUSE

 

11. Proposed use of the land: (eg. 6 unit apartment building, 30 tot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).

 

 

 

 

 

 

 

 

 

| NEW DETACHED HOUSE
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part f, etc)
Part A must ghways be accompanied by other [ PART D ]
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making th fication. Thi
Oe [ BUD BRANNIGAN ARCHITECT | [BUD BRANNIGAN |
When signing and lodging this apntication 14. Contact number: 16. Facsimile number/e-mail address:
The licant i ibte for ing th A
Pee eh wearet To emvasment [ 07 33683105 | [([email protected] |

 

manager, any referral agency & the Chief Executive .
(where applicable) wil rely on this information when 117. Postal address:

 

 

assessing and desing he application [ 61 LUGG STREET, BARDON. Q. 4065. ‘|
ithe applicant 1s a company - a contact person
must be shown. 18. Signature: 19. Date:

 

h. ba -r— otis,

 

 

 

 

 

Page 8

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land owner's consent (if appficable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an .
application must contain, or be supported by, the Name Signature Date
written consent of the and owner/s, if the application
involves: {i)
(i) amaterialchangecfuse; fe eee c eee eee cee e dee cc ccc eeee eeeceee eee e ee dec e eee eee e ed
(ii) reconfiguration of a fot, ve
(ii) work on land below high-water mark & not within a {ii)

canal as defined under the Coastal Protectonand yee eee eee ee ee eee ewe fee cece eee ed

Management Act 1995,or ve
(v) work on rail corridor land defined under the (iii)

Transport infrastructure Act199%, fh nee cee eee eden cece eee eee cece cece eee cee ee dee eee ed
Section 3.8.1(2)(a} of the IPA provides that 7
landowner’s consent is not required for a mobile or {iv)
temporaryERA, fl Panne eee een nee ee eee eee ee de eee eee denne eee eed
For more information refer to Guide 1, (vy)
Resource entitlement (if appicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3,2.1(5) of the {PA requires evidence of quarry material on State coastal fand under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that
involve a prescribed State resource. BX NO - go to Q24 LD YES - goto a22
Section 3.2.1(10)(a)(i) of the (PA prescribes that : ste . .
apptcaon cmt tes be propery made 22. This application is accompanied by evidence: (tick applicable box)
womens one resource entitement, {1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)

mi 8 ' . woe . . .

Refer to schedule 10 of the éntagrated Planning Ci (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence j i r .
retired by he Slate i support of he lodging of his development is consistent with an allocation of, or entitlement to, the resource - go
development application,

[7 (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to Q23

Adve for comleting G23 23. Evidence of the resource entitlement:
he information in {i) ~ (v) is mandatory if evidence is fn , A f a q
required under 022 Gi) o Gil above (i) Resource entitlement / authority details (vii) Official stamp fn the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the im applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Section 32.1064) allows tho enianicne em
1a time the evidence may be used. vi} Must ii nit
cornleted ithe evidence i ine finite. (iii) Position of a officer

(iv) Signature of delegated officer

(vy) Date

(vi) pe date of evidence a

Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checklist does not apply if the application requires . an
the completion of Parts A and 8 of the Form only. It & Yes LINO - the assessment manager may refuse to accept this application on the
must be completed for ail other applications. grounds that the application has not been properly made
Plans | drawings / reports 25. Plans/drawings/reports accompanying this application:
An application should be ied by details to . *
support the proposal & crablolbe! assescment Plan / Drawing / Report Number Title Date
manager, referral agencies and any person viewing (i) Drawings
the application during public scrutiny or public ig PLANS, ELEVATIONS AND
notation to undersond the soope of the praposal $001B,SD02B,SD03A,SD04A,SD05A, SECTIONS DEC, 2006
Bd any potential impact SD06A,SDO7A, SDO8A, SDO9A
.. DEVELOPMENT 1 March,
(i) Report dated 1 March, 2007 APPLICATION REPORT 2007
(ili)
(Ww)

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the ime of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (eppiicabie to assessment manager's)

DATE

| FEE (8) RECEIVED

S7s_|

AVING OFFICER’
NAMES

REFERENCE

| 22/a}e7 | Fee NUMBERIS

[Kan | Lor/s2.
U

Page 9

19/43/2867 18:48 54482665 GOOCHIES PAGE 42

Section 3.2.1(3) of ne IPA prescribes that an application must contain, or be supponed by, the wifttert correent of the land oyneris, # the appliestian involves:
4 (iierial change of uae,

feconfigurebon of a lot,

work on dard Deliw high-water mark & not within ¢ canal at defined under fe Coestef Protection and Mamsgenant Act 1295.or

‘work on rail cortider fared defined under the Transport Amirestructure Act 1994.

aaa iaah ania sodaihinhnainehnninihie NN AiETETEE
For mora informetion refer fp HYPERDING. Titty itereni ict tit cone puslaed ae pe
making of this application: \ {
Name od Ul PRaa meced

sown Alice.

  

owner's consent fo the

(i) FORMTEXT (A % [oY
FORMTEXT

FORMTEXT

(i) | FORMTEXT
FORMTEXT

FORMTEXT

(ii) = FORMTEXT
FORMTEXT
FORMTEXT

(hv) FORMTEXT
FORMTEXT

@ FORMTEXT

(vy) FORMTEXT
FORMTEXT

FORMTEXT

Section 3.2.1(6) of the IPH requires evidence of resoutte eneterment be given for apovicadons thet Involve a prescribed Sista resouroo.
Section 3,2.1(t0 (a) of the IPA prescribes ther an applicator caaant be taker to he property mats without evidence of fhe resoutat enittiement,

Stttien ine commeteting 021.422
Refer to schedule 10 of the iniegnaled Planning Reguistion 1998 tet prescribes te natyre ‘of evidence required by lire State itt support of the lodging of this development
meterion Does this appiication inva a State resource prescrbed unde” 8 roguaton eran mon uy mee

Page 10

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)

To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Date ofengagement / | — Accreditation Number. Name: Signature:

 

 

Page 11

INTEGRATED PLANNING ACT 1997

   

Material change of use

assessable against a local government’s planning scheme

Pait D, Version 2.0, 4 October 2004

paren

 

on i Det e elec en an

 

 

 

Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.

 

Nature of the application 1.

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.

This application is for: {tick 1 or both if applicable)

Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie.
consideration of the proposal concept)

AND/OR

Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

The subject land 2.

For the definition of “gross floor area” go to
the planning scheme against which the
application will be assessed,

How the subject land is identified in the planning scheme (name the zone, precinct etc.)
{ COASTAL PROTECTION PRECINCT

 

 

 

 

 

 

 

 

 

 

3. Existing gross floor area: (if applicable) | |
4. Are there any existing easements on the land?
JNO
(YES - attach plans of the jocation and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
| REPLACE EXISTING DETACHED HOUSE WITH NEW DETACHED HOUSE |
6. Number of employees: | |
7. Operating days and hours: | |

 

 

Associated building works details (if | ¢.
applicable)

For the definition of “site cover’, “grass floor
area” and “storey* go to the planning scheme
against which the application will be

assessed. 10.
11.

12.
13,

Gross floor area: [FT

Number of on-site car parking spaces: [2
Number of storeys / maximum height above natural ground:
Number of employees |

Hours and days the use willoperate = |

 

 

 

 

 

Associated operational works details | 14,
(if applicable)

 

Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.)

|

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

requested by Part A and any other relevant part of Form 4.

 

OFFICE USE ONLY (applicable to assessment manager}

DATE RECEIVED

REFERENCE
NUMBER/S

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

 
   

"IDAS Assessment
Checklist

(Formerly the “Referrals Checklist")

 

{MPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrais Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmentat Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensiand State entity and may also assist the applicant to
determine the assessment manager’ for the application.

4. Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only}.

5. Itls the responsibitity of the applicant to accurately complete this checklist.

6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

7 Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8, The assessment manager for the application will rely on the Information provided in this checklist (as wel! as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.

9.  Toassist you in answering the following questions a series of guides are avaitable free from the IPA website www.ipa.aid.qov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from

11, Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

 

Environmentally relevant activity 4. The application involves: (tick applicable box/es)

For more information refer to Guide 4. (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
ihe oppvonion reyes ensesoment ty fe at, has not been made - complete Part G of Form 1

administering authority? oO (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
if an entity, other than the administering made - complete Part G of Form 1

authority, Is the assessment manager for the & (iii) none of the above

application, the administering authority is a
concurrence agency for the application in retation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kz of Form 4
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (eppiicabie to assessment manager}
DATE RECEIVED REFERENCE NUMBER/S

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?
3 The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant local government {for a devolved ERA) or the Queensland Department of Primary industries and

Page 13

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

 

State-controlied road matters 2. The application involves: (tick applicable boxes)
Fer more information refer to Guide 3, . .
Unless you answered ‘none of the above” to 02, C1 (i) development on land contiguous to a State controlled road and for
the application triggers referral to the Denartment C1 (a) material change of use assessable against the planning scheme;
ahen ket (OMR) oad . (1) (b) reconfiguring a lot unless -
agency, while in other circumstances DMR will + the total number of lots is not increased; and
be a concurrence agency. + the total number of lots abutting the State-controlled road is not increased;
Sener 2 ofthe I Regulation assist youto Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}—
* associated with access to a State-controlled road; or
+ for filling or excavation; or
* involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LA di) development on land not contiguous to a State-controlled road and -
OC @) material change of use -
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation

and exceeding the thresholds set by that schedule;

C1 (c) operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a lot mentioned in (b) above}
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
& (ii) none of the above
Clearing vegetation 3. The application involves: (tick applicable boxes)
For more information refer to Guide 12. o (i) material change of use -
f swered "I f the * , . .
to anteaten ies oeecsmenl by % (a) assessable against the planning scheme;
Qepariment of Natural Resources and Water ining —
(NR, (b) on a lot containing
{fan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a + if there is no property map of assessable vegetation for the lot - remnant vegetation;
Concurrence agency forthe application in relation (c) where the existing use of the land is a rural or environmental use; and
if you ticked 03() oF (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
teferral to NRW for assessment regardless of oO (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. .

(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger,

(c) where 2 or more lots are created; and

(d) where the size of any ‘ot created is 25 hectares or smaller - complete Part J of Form 1

(ii) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form t

XI (iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

if you ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

(J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part | of Form

LU (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Pert ! of Form 1

Bx (iii) none of the above

 

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land Is within 100m of the State-controfled road; or that is part of a future State-

Page 14

INTEGRATED PLANNING ACT 1997

Acid sulfate soits 5.

For more information refer to Guide 10,

Unless you answered “none of the above” to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

if an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

 

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

if you answered “YES” to Q6, the application
requires assessment by the Department of
Ememency Services (DES).

If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves development on land situated in an identified’ local government area
and where the surface of the land is: (tick applicable box)

(1 (i) below 20m AHDS and the development will involve the excavation of 1000m: or more of
soil or sediment at or below 5m AHD, or

C1 (i) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material

EX (i) none of the above

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

NO

(YES - complete Part t of Form 1

 

Water related development under the | 7.

Water Act 2000

For more information about items (a) — {f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above" to Q7,
the apptication requires assessment by the

Department of Natura) Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

The application involves:

CO (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es}

oO (a) in a watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Kz, Ks, Ke, or Ke of Form 1 whichever is applicable;

(2 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form f,

C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
US€ - complete Part K; of Form 1;

CO (d) fora subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;

(0 €e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1,
Of

for interfering with overland flow water in a drainage and embankment area -
complete Part Ke of Form 1
(1 @) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
XI (ii) none of the above.

 

Removal of quarry material from a 8.

watercourse

For more information refer to Guide 16.

If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is 2
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
Tequiring an allocation notice under the Water Act 2000?

EI No

[YES - complete Parts Kr and G of Form 1

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cains, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervay Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Matoochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

6 Australian Height Datum {AHD)}.

7 The declared ground water areas are listed in Guide 13 Development in a daciared catchment area.

8 Referable dam is defined under the Water Act 2000.

Page 15

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or

IDAS Assessment Checklist, Version 19.0, 2 March 2007

9, The application involves operational work that is: ( tick the applicable box/es)

 

workin coastal management district Ci) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed fidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
local government tidal areas refer to Guide 24, C (ii) tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF
the cpnteston eit ore oe te 8, DO (tii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to {i} below are ticked.
reereserememees | O10 cea ne a oniaanee
Laan i other than (S$ in fda!
relator to tis gency for the application in to be assessable against the Water Act 2000 ; is
tol salir assessment manager (J (b) constructing a canal12 intended to be connected to tidal waters;
° CJ (c) constructing an artificial waterway;
((d) reclaiming land under tidal water,
(1 (e) disposing of dredge spoil or other solid waste material in tidal water,
(1 (f) interfering with quarry material on State coastal land above high-water mark;
(1(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
C1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{I (iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
mai

For more information refer to Guide 18, For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Untess you answered "none of the above” to
Q10, the application triggers referral to

3 In iti

Qid) as a concurrence agency.

Local government is the assessment manager
for all prescribed tidal work.

C1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the

Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or

C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
O (ii) carried out within a coastal management district's under the Coastal Act and for -

iv)

Cle)

disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;

(1 (b) reclaiming tand under tidal water - complete Part M of Form 1; of
Ci (c) constructing a canal12, if the canal is associated with reconfiguring a lot -

complete Part M of Form 1,
none of the above,

 

Coastal management
For more information refer to Guide 18.

Untess you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.

11,

 

The application involves: (tick the applicable box/es)

ma)
Di)

Diiiii
Ov
a)

a material change of use assessable under a planning scheme Involving operational
work carried out completely or partly in a coastal management district"

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

+ the construction of a new premises with a GFA'® of at least 1000m?
+ the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a fot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12. Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work Is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a focal government tidal area.

15 Coastal management district is defined in sch 10 of the [PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration ts associated with the construction of an artificial waterway, must be

Page 16

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

If you answered “YES" to 012, the apptication

‘triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

* within 200m of a shipping channel or an entry
and exit shipping corridor for the port

¢ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

* within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994,

in all other situation the Port Authority is an

advice agency.

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
goverment is the assessment manager for ail
prescribed tidal work,

Hf you answered “YES” to Q13, the application

triggers referral to Queensland Fire and Rescue
Service as an advice agency.

12.

13.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

INO

(C1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?

— No

(C1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

Tidat works in strategic port land tidal
areas
For more Information refer to Guide 18.

Unless you answered “NO” to 014, the retevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage

For further information refer to Guide 19.

\f you answered “YES” to 015, the application
triggers referral to the Queensland Heritage

15,

Does the application involve tidal works within a strategic port land tidal area2?
RINo

[YES - complete Part Mof Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

KINO

 

Counell as concurrence agency for the [DYES - complete Part C of Form 1
application,
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

For more information, including a list of the
declared catchment areas within Queenstand,
refer to Guide 13.

Unless you answered “none of the above” to
Q146, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW Is a
concurrence agency for the application in
relation to this matter.

 

involves: (tick the applicable box/es)

OC(i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
(1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
EX (ili) none of the above

 

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995.

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

Contaminated land 47. The application involves: (tick the appiicable box/es)

Applications involving material change of use 7 i i i: -

and/or reconfiguring a lot may tigger this Dw reconfiguring a fot for which all of part of the premises are

referral, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~

For more information refer to Guide 5. * item 5, including the exemption otherwise provided for by paragraph (4);

Unless you answered ‘none of the above” to * item 6, inctuding the exemption otherwise provided for by paragraph (e), or

Q17, the application requires assessment by the + item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an activity; or

agency other than EPA Is the assessment . , . . .

manager for the application, EPA will be a {b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 4

relation to this matter.

LO ti) a material change of use —

(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -

complete Part N of Form 1

{& (ili) none of the above

Electricity infrastructure 18. The application involves: (tick the applicable boxes)
fe more information refer to schedule 2of the IP (J (i) reconfiguring a fot where any part of the lot is -
Unless you answer ed “none of the above" to * subject to an easement in favour of a distribution entity or transmission entity under the
18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act; or
favour of as advice agency. * situated within 100m of a substation site;

(J (i) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

+ any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

Oi (il) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

C(iv) operational work that is filling or excavation assessable against the planning scheme,
Not associated with reconfiguring a lot, if —

+ any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

+ the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure

Applications involving development on land
designated for community infrastructure may
trigger this referral.

For mare information refer to schedule 2 of the
IP Regutation.

If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
\fan agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application In relation to this
matter.

 

designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
KI No
CyYes

 

Page 18

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Regulation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 4997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 19.0, 2 March 2007
20. The application involves (tick appicable bowes) -
O14) amateriat change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
DO @)  anurban activity -
[1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
* the IPA, section 3.1.6 applies to the application for the material change
of use; or
+ the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
» impact assessment is required under the relevant planning scheme

J (i) _ intensive animal husbandry, or
CJ (iti) residential development involving a rural residential purpose

(b)_ in the Regional Landscape and Rural Production Area tor -
1 (i) anurban activity and not specified in section 2.4(2); or
(1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the investigation Area for -
C1 (i) an urban activity and not specified in section 2.10(2);
(1) (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
0 (ii) intensive animal husbandry

(sii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
(1 (iii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the [P
Renylation.

Unless you answered “none of the above" to
Q21, the application requires assessment by the
Oe fi Industries and Fisheri
(OPI&F).

If an agency other than DPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
relation to items (1) - (lv) and an advice agency
in relation to item (v).

 

21. The application involves: (tick the applicable box/es)

Ci) anassessable material change of use for aquaculture - complete Part 0; of Form 1;

C({ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 7;

LC (ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 7;

CU (iv) assessable operational work that is the removal, destruction or damage of a marine

plant - complete Part 02 of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a

declared fish habitat area;

none of the above.

 

 

Page 19

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
BA of the IPA, & schedule 2 of the IP Requtation.

IDAS Assessment Checklist, Version 19.0, 2 March 2007

22. The application involves: (tick the applicable box/es)—

CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that

 

Unless you answered ‘none of the above", the schedule.
application tiggers referral to QT as a
concurrence agency. Dil) reconfiguring a fot—
CJ (a) __ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
(O(c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(Od) for a residential purpose within the 25 ANEF contour for an airport;
Ce) _ for a residential purpose resulting in 100 or more allotments.
(CO (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) _ will result in work that encroaches into an airport's operational airspace.
DX] (iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es}—

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency,

 

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

O (ii) reconfiguring a lot—

(a) __ ontand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

CJ (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

O(c) _ on tand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases,

(1 (4) _ on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

(J (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

(( for a residential purpose resulting in 100 or more aflotments.

(iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—

C) (a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(1 (b) is completely or partly within future railway land, or a railway tunnel easement,

(0 (©) abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
(iv) none of the above.

 

Moonie to Brisbane pipeline 24.

For more information refer to schedule 2of the IP
Regulation.

Uniess you answered “none of the above”, the
application triggers referral to the holder of
Pipeline ticence No 1 issued under the Petroleun
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring alot, and any structure or work will be located wholly or partly in the
easement.

CO (ii) reconfiguring a lot

(2 (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

Ed] (iv) none of the above.

 

Page 20

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedute 2 of the IP Requlation.

Unless you answered “none of the above’, the
application requires referral to the Environmentat
Protection Agency as a concurrence agency.

IDAS Assessment Checklist, Version 19.0, 2 March 2007

25. The application involves: (tick the applicable box/es)—

CD (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in ~
(a) clearing of native vegetation over an area greater than 2500m?;

CJ (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

{7 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;

[)(d)_ extracting gravel, rock or sand from an area greater than 5000m2,

CL) {e) excavating or filling an area greater than 5000m?;

(1 (f) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

(1) (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(a) an increased number of lots;
{[] (b) clearing of native vegetation over an area greater than 2500m2.

LD (ili) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

() (a) clearing of native vegetation over an area greater than 2500m?,
(]{b) extracting gravel, rock or sand from an area greater than 5000m?;
LD (c) excavating or filling an area greater than 5000m?.

[q (v) none of the above.

 

Wild river area
For more information, refer to Guide 27

If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
‘iver area because the application cannot be
accepted by the assessment manager.

Referral coordination

An information request requires referral
coordination if the application Involves —
() 3 of more concurrence agencies; or
(i) a facility or area assessable under a
planning scheme and prescribed in
schedule7 or 8 of the IP Regulation; or
{iii} development which is subject to an
application for preliminary approval
mentioned in s3,1.6 of the IPA.

For mare information go to Guide 2 and Guide 6.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

CNno
(YES

27. Does the application trigger referral coordination?
No

(YES, as the application: (tick the applicable boxes)

[1 (i) triggers 3 or more concurrence agencies;

OO (ii) involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

C(iii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;

C1 (iv) _ is for apreliminary approval mentioned in s3.1.6 of the IPA

 

Referral agency responses prior to
lodgement

Under s3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an
pplication for the proposal is made to the
assessment manager.

This is commonly the case where an application
requires referral to a building referral agency (eg.
Qld Fire and Rescue Service).

28. Did a referral agency give a referral agency response under s3.3.2 of the IPA before the
application was made to the assessment manager?

No

(1YES - attach a copy of the referral agency/s response/s

 

 

 

Page 21

 

 

| : .
ee eee eee eee mannan ee es ee ae kere ee tee none arene ee arte weer ene ert
eens 4
| LOaLiH Duy {
[RVI US ais |

 

       
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

~.” a
vy. . ro 1
“Yt Ore
gd ;
| C rm Coed atl
\ 4 nop Lepd {
oop ay :
l pe
|
| |

one a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LE ASU

’

peo an \¢

os | cr Ys ey

L pea ve re
PP May da

eto NN rod) ; ee el
Crna) ssed aye) :
Pt ns rope tape by dope eA oy) wash db .

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22

 

NOGuva

sf.

    
 
     

a : ae | \\ wd | . | ~,

 

 

 

\
Seis VOI LF J,
moe dBhiuarrg| oma oe “Hy .

\\ " 2G ab }

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\
Oh

\ Shp CALAN SSK Gs A | _ ~ |

Page 23

la2vZi ! —_

a

             

- Y Seas IG
CAI CUS vid 6 GTAP
2. peer ;

1tOF
ar)
NOGVE

Ne a
AS MONTLP .

 

 

NY¥SINNVUG Ang

‘
\

        

h-hA hh

  

 

+ et Hh Bre ae sy S —

nw x0 4

 

NEA

 

 

Page 24

  

   

tet +

Tee
oo yee | :
pike |
we Te Sala |

    

a
reoeva | pool |
i2ahi. Song ° \ 4 t
DELI OEY

: Loo.
NVSINNVES Gnd! ; og

           

   

   

 
 

 

 

ae |

\ :

|

|
io i

ic

. |

|
f ;
v
== ¢
|

|

 

 

 

—— ow’

 

Page 25

forza?) |

                   

ceca Tepe
& ae ser
yoOY

Oo

Cx @) ws[ | yes

NOouva
12323815 DONTLG

NYOINNYY ane

 

 

Page 26

Le 20°71 | |
¥90qs .6mg | oa |
ie e@)ces) 1 O75 |

 

 

 

 

 

 

+
{
Noqduva : |
LIBVLSQONTLP ‘ {
. . . TT
—prardq LORLIHOUY
ith co
rv bored NVOINNVYS ana . nergy

 

Page 27

+4 boas , bang
GUS ors] 75

go, AAS NYY

Ga ae

 

  

Eo Rin Cr nao aes
eisune ed
-P9O¥

D

NoOQzuva
432318 99N1 19

4DaLlIHOav

| NVOINNVUE ang

 

 

 

 

 

 

 

 

 

 

Page 28

L9°20'UI
Boas Gnd
<vae)reiil 4 OFS

99. peop ae

   

Foor
5
NOQSVE
. LURLS DONT LS
_ . LOFLIHOUV
“Pore” J NVOINNVES GAg
FO poet

 

 

 

 

 

vee

 

|

 

Page 29

¥ bo Is Gua

Tad ©) sil aye7s
92 Para TY

    
 

ABRs SONT LD
LOaLIHOV

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 30

1 ~
a MNOLOA

 

 

LAND USE SECTION FEES

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation : 520
Copy of Permit/Approval Letter : 110
The Noosa Plan Documentation 4417
APPLICATION FEES ~
Material Change of Use - Code/impact ,
Consistent 525 521
Inconsistent . 521
Assessment under Superseded Planning Scheme . : _ $21
. Modification to a Development Permit : 521
@ ‘Extension of a Currency Period 521
Operational Works - Landscaping : 521
Bldg Work assessable against the Planning Scheme . . -  §24
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522
ADVERTISING
. Purchase Advertised Applications 523
‘JETTIES :
Jetty Application Fee : 524
_Jetty Bond: _ . Se SI (u)
BONDS.
. * Performance Bond 50
es ,
: Registration Fee 222
‘SEARCH FEE : “
Search of Land Use Section file . 112
Liquor Licensing Request 113

 

TOTAL $ S75.

 

 

 

 

 

 

names Gut Brolga FL

ADDRESS: fl baw cys Bacate, O OCS
FILE NO: e7/ 524 “DATE: Zi 3 [ep

RECEIPT NO: oe . Signature of TP Officer: (7, Oaks a
AUTHORITY. NO:

| '3/ 2os) Sa},

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0521 - MCU - Detached House - Bud Brannigan Architect [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.