Council archive · source document
07/0521 - MCU - Detached House - Bud Brannigan Architect [As Published] · 132007.521
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
IDAS Assessment Checklist, Version 19.0, 2 March 2007
9, The application involves operational work that is: ( tick the applicable box/es)
workin coastal management district Ci) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed fidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
local government tidal areas refer to Guide 24, C (ii) tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF
the cpnteston eit ore oe te 8, DO (tii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to {i} below are ticked.
reereserememees | O10 cea ne a oniaanee
Laan i other than (S$ in fda!
relator to tis gency for the application in to be assessable against the Water Act 2000 ; is
tol salir assessment manager (J (b) constructing a canal12 intended to be connected to tidal waters;
° CJ (c) constructing an artificial waterway;
((d) reclaiming land under tidal water,
(1 (e) disposing of dredge spoil or other solid waste material in tidal water,
(1 (f) interfering with quarry material on State coastal land above high-water mark;
(1(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
C1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
{I (iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
mai
For more information refer to Guide 18, For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Untess you answered "none of the above” to
Q10, the application triggers referral to
3 In iti
Qid) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work.
C1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or
C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
O (ii) carried out within a coastal management district's under the Coastal Act and for -
iv)
Cle)
disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
(1 (b) reclaiming tand under tidal water - complete Part M of Form 1; of
Ci (c) constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1,
none of the above,
Coastal management
For more information refer to Guide 18.
Untess you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.
11,
The application involves: (tick the applicable box/es)
ma)
Di)
Diiiii
Ov
a)
a material change of use assessable under a planning scheme Involving operational
work carried out completely or partly in a coastal management district"
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
+ the construction of a new premises with a GFA'® of at least 1000m?
+ the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a fot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1
none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12. Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work Is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a focal government tidal area.
15 Coastal management district is defined in sch 10 of the [PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration ts associated with the construction of an artificial waterway, must be
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0521 - MCU - Detached House - Bud Brannigan Architect [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.