               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Development Planner, Georgina Schramm
                                       Development Assessment



                APPLICATION DETAILS

                Application No.                   MCU22/0052

                Applicant                         Quentin & Tamara Ellis C/-JDBA Certifiers

                Proposal                          Material Change of Use - Short-term accommodation (3 cabins)

                Properly Made Date                26 May 2022

                Information Request Date          9 June 2022

                Information Response Date         17 April 2023

                Further Advice Request            26 June 2023

                Further Advice Response           7 November 2023

                Decision Due Date                 12.12.2023 (extended by agreement)

                Report Reviewed &                 Tara Norley - 12.12.2023
                Finalised By


                PROPERTY DETAILS

                Property Address                  332 Eastern Branch Rd Kin Kin Qld 4571

                RP Description                    Lot 218 MCH 186

                Land Area                         196580.00 m² / 19.6 hectares

                Existing Use of Land              Residential – Dwelling house, rural pursuits


                STATUTORY DETAILS

                SEQRP Designation                 Regional Landscape and Rural Production Area

                Zone                              Rural

                Precinct                          Not Applicable

                Local Plan Area                   Not Applicable

                Overlays                          Agricultural Land Conservation Area
                                                  Biodiversity, Waterways and Wetlands
                                                  Bushfire Hazard




Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Full text of the other 17 pages

Page 2

                                               Landslide Hazard

                Assessment Type                Code

               1.     PROPOSAL
               The application seeks approval for a Material Change of Use - Short-term accommodation (3
               cabins). The 3 cabins are located on the western side of the waterway, with access from an
               existing, informal track.
               Each cabin is raised on stilts, 51m2 in size, accommodating a bedroom, bath, kitchen and living
               with a combined deck and alfresco area. A common area for parking is proposed with a
               pedestrian footpath to each cabin to avoid the amount of traffic through the identified riparian
               buffer of the Biodiversity, Waterways and Wetland Overlay and having to cross culverts.
               The applicant has provided a flood and ecological assessment in support of the application.
               Stage 1 will include the construction of the Cabins 1 and 2.
               Stage 2 will include the construction of Cabin 3.
               The locality and proposal plan are included below.




                                                        Figure 1 – Locality




                                                                                                  Page 2 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 3

                                       Figure 2 – Site Plan




                                       Figure 3 – Floor Plan


                                                               Page 3 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 4

                                                      Figure 4 – Elevations

               2.     APPLICATION BACKGROUND
               The application was originally lodged in April 2022 for Nature Based Tourism (6 permanent
               tents). There was limited detail provided in support of the application for the purpose of Nature
               Based Tourism (NBT) as NBT requires the use of the premises for a tourism activity for the
               conservation or interpretation of the natural environment, local ecosystem in addition to provide
               accommodation for tourists.
               The application did not adequately demonstrate the tourism activity on the site and the
               application was changed from Nature Based Tourism to Short Term Accommodation.
               3.     SITE DETAILS
               3.1. Site Description
               The subject site is approximately 19.64ha and adjoins Eastern Branch Road to the east.
               The eastern branch of Kin Kin Creek traverses through the eastern site extent. The site is
               currently improved with an existing dwelling and associated infrastructure. The site is
               characterised by large expanses of historically cleared areas with remnant vegetation extending
               into the south-western and north-western site extents. The site is located in a hilly landscape
               characterised by low hills interspersed with drainage gullies which flow into Kin Kin Creek
               (Eastern Branch) which is located in a narrow alluvial valley between the hills.
               3.2. Surrounding Land Uses
               Surrounding premises are of similar topography and predominately used for rural pursuits.
               4.     ASSESSMENT
               4.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:


                                                                                                  Page 4 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 5

               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020.
               4.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •      Rural Zone Code;
               •      Visitor Accommodation Code;
               •      Works Codes;
               •      Biodiversity, Waterways and Wetlands Overlay Code;
               •      Bushfire Hazard Overlay Code;
               •      Landslide Hazard Overlay Code.
               The subject site is located in Kin Kin and is zoned Medium Density Residential. The proposed
               use is identified as a consistent use within the zone and is required to follow a code assessable
               application process.
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below:

                Criteria                     Planning Scheme                 Proposal             Complies

                Building height
                •    storeys                 2 storeys max                   1 storeys            
                •    metres                  8 metres                        4.2 metres           

                Gross floor area             90m² max (each)                 51m² (each)          

                Boundary setbacks
                   • Frontage                10 metres min                   131 metres           
                   • Side                                                    22 metres            

                ALCA                         200 metres                      22 metres            X

                Carparking                   3 spaces                        4 spaces             

               Agricultural Land Classification Area
               Acceptable outcomes AO2.3 & AO2.4 of the Rural Zone Code seeks –
               AO2.3 Where located in the Agricultural Land Conservation Area accommodation is of a
               temporary or semi-permanent nature (such as tents, yurts, relocatable dwellings or recreational
               vehicles) or it adaptively reuses well-established rural buildings.
               AO2.4 No sensitive land use is established closer than 200 metres from land on an adjacent
               property included in the Rural zone and mapped as Agricultural Land Conservation Area as
               shown in Agricultural Land Overlap Maps in schedule 2.
               The proposed short term accommodation cabins are located in an area identified as Agricultural
               Land Conservation Area (ALCA) and located within 200 metres from land on an adjacent
               property included in the Rural zone and mapped as ALCA. Therefore the development is to be
               assessed against the corresponding Performance outcome PO2 of the Rural Zone Code, which
               seeks –


                                                                                                   Page 5 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 6

               Development does not result in the loss or diminished productive capacity of Agricultural Land
               Conservation Area.
               Each cabin is raised and therefore has reversible impacts, should the desire be to revert the land
               to agricultural land. In addition, the portion of land mapped as ALCA, at approximately 2100m2,
               is heavily constrained, being surrounded by biodiversity and riparian mapped areas and is not of
               a sufficient size or location to be meaningfully utilised for rural purposes.




                               Figure X: Excerpt of subject site showing location of cabins in ALCA mapped area

               In regard to the reduced boundary setback of 22 metres in lieu of 200 metres, following a site
               inspection it is clear that the subject site and adjoining premises are not undertaking rural
               operations of a scale to raise conflict with one another. The addition of the cabins is not
               considered to diminish the productivity of the subject site or the adjoining premises, the
               development complies with the Performance outcome.
               Vehicles
               Acceptable outcome AO11.1 of the Visitor Accommodation Code seeks –
               Visitor Accommodation is directly accessible from a sealed road or a good standard gravelled
               road.
               Eastern Branch Road is an unsealed, dirt road and therefore is to be assessed against the
               Performance outcome.
               The corresponding Performance outcome PO11 of the Visitor Accommodation Code seeks -
               Safe vehicular access is provided to and from the site without adversely impacting on the safety
               of the road network.
               The road is an all-weather constructed road, that is on a routine maintenance schedule with
               Council, comparable to other unsealed road networks with the Shire. The applicant has provided
               a Road Assessment undertaken by BAX Engineering to assist in determining the suitability of the
               road and access for the intended use.
                      Eastern Branch Road commences from the Pomona Kin Kin Road approximately 3.4km to
                      the north. The Pomona Kin Kin Road is a sealed road while the full length of the Eastern
                      Branch Road is a gravel formation that terminates at a dead end approximately 550m to
                      the south of the project site.
                      There are several creek crossings along the Eastern Branch Road of which some are
                      concreted. The road formation at the frontage of the project site is a gravel formation of
                      approximately 5m to 5.3m in width. There is also opportunity for vehicles to pass at the site
                      entrance without any modifications. There are scattered mature trees on the both the


                                                                                                              Page 6 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 7

                      eastern and western side verges. All vegetation along the road frontage is clear of the
                      formation and does not appear to pose a risk for vehicle sight stopping distance.
               The road is considered to be constructed to an adequate standard for 3 cabins, therefore the
               development complies with the Performance outcome.
               Flood Hazard
               A portion of the site is identified as being susceptible to flooding along the creek and in the lower
               lying portion of the lot in the northeastern corner of the site. The 3 cabins, associated structures
               and car parking area are all located clear of the flood hazard. In addition, the applicant provided
               a Hydraulic Assessment in the Information Request response, with the applicant stating:
                    The following conclusions have been made:
                         •   based on the proposed locations of the cabins, the areas proposed appear to be free
                             of flood during the modelled storm events.
                         •   Access to the cabins would be restricted during the design storm events modelled.
                             Nonetheless so would access to the property based on the unpassable creek
                             crossings on Eastern Branch Road. Therefore, access from the cabins to a point of
                             refuge has been considered and can be achieved. This point of refuge would be the
                             existing dwelling/managers residence at a higher elevation.
                         •   Stormwater quality treatment can be achieved through rainwater harvesting tanks and
                             buffer areas.
                         •   The environmental footprint for the cabins would be minimal based on the areas
                             already cleared and the tracks and culverts already in place.
                    In summary, the proposed cabin locations on the subject site will result in non-actionable
                    nuisance of stormwater runoff, be free of flooding and have safe refuge opportunities should
                    it be faced with unpredicted intermittent weather.
               Biodiversity, Waterways and Wetlands
               Acceptable outcome AO6.1 of the Biodiversity, Waterways and Wetlands seeks - Development
               and clearing of vegetation does not occur within:
                          a) a riparian buffer area;
                          b) a wetland area; or
                          c) 10 metres either side of the centre line of other waterways identified on
                             a Biodiversity, Waterways and Wetlands Overlay Map.
               The applicant seeks to construct 3 Short term accommodation cabins, 1 of the cabins is
               proposed to be partially located in the riparian buffer. The proposed access and Cabin 3 are
               located in the riparian buffer, and therefore is to be assessed against the corresponding
               Performance outcome.
               PO6 The biodiversity and ecosystem values of waterways, wetlands and adjacent riparian zones
               are protected by:
                       a) avoiding any new development in a riparian buffer area and wetland area;
                       b) retaining aquatic and terrestrial habitat in riparian zones;
                       c) maintaining and enhancing wildlife corridors and connectivity along watercourses
                           and drainage lines for native fauna movement;
                       d) avoiding edge effects and damage from adjacent land uses;
                       e) maintaining stream integrity and bank stability by minimising bank erosion and
                           slumping;
                       f) maintaining water quality through filtering sediments, nutrients and other pollutants;
                           and
                       g) removing pest species and replacing them with local native species.
               Council’s Senior Environment Officer has provided the following comments regarding the
               proposed development within the mapped Biodiversity, Waterways and Wetlands Overlay:


                                                                                                         Page 7 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 8

               This site is flanked by a stream order 1 on its southern side and native vegetation to its north.
               Areas of this paddock have been historically planted with a range on non-native species including
               fruit trees. An area of approximately 750 square metres is available on this platform that is not
               constrained by either biodiversity significance or riparian protection area. This area is identified
               by Council Officers as an appropriate location for the proposed cabins. A small area equal to 100
               square metres of the riparian protection area to the northeast is also identified as a potentially
               suitable location for infrastructure for the following reasons:
               •     More than 30 metres from the southern stream order 1
               •     More than 70 metres from the eastern stream order 3-4
               •     Appears to be located in a mapping anomaly, as the southern stream order 1 should be
                     afforded 10 metres of separation however in this instance is provided with approx. 30-35 m.
               •     The area is currently maintained pasture that contains no riparian vegetation or vegetation
                     that would be associated within the riparian zone of a waterway
               The location of the cabin in the riparian area is considered reasonable given the circumstances of
               the site, the development will be conditioned to be rehabilitated along the waterways. The
               development therefore complies with the Performance outcome.
               Bushfire Hazard
               Acceptable outcome AO1.1 of the Bushfire Hazard Overlay Code seeks - Development which
               will materially increase the number of people living or congregating on premises,
               including reconfiguring a lot, is not located within a medium or high bushfire hazard area.
               The development is located in the Medium Potential Impact Buffer of the Bushfire Hazard
               Overlay and therefore is to be assessed against the corresponding Performance outcome.
               Performance outcome PO1 seeks - Development maintains the safety of people and property
               from the adverse impacts of bushfire.
               A bushfire hazard assessment has been completed for Lot 218 on MCH186, located at 332
               Eastern Branch Road, Kin Kin. A Local Hazard Map has been prepared for the site consistent
               with the State Planning Policy – Natural Hazards, Risk and Resilience – Technical Manual.
               The Local Hazard Map presented in the bushfire hazard assessment has identified that the
               proposed development area and majority of the surrounding landscape is located within a Low
               Potential Bushfire Intensity Area. A Potential Impact Buffer extends 100m from a High Potential
               Bushfire Intensity and occurs close to the proposed development area, however no part of the
               development (including proposed access) extends into this Buffer Area.
               Standard bushfire / emergency bushfire conditions have been provided which include provision of
               water for firefighting purposes, and an emergency evacuation plan for the site. The development
               will be appropriately conditioned to comply with the Performance outcome.
               5.     CONSULTATION
               5.1. Referral Agencies
               Not Applicable
               5.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or
               comment:
               •      Development Engineer – as recommended.
                      The proposed development includes the construction of 3 cabins along Eastern Branch
                      Road, Kin Kin. The development site is encumbered by Council’s mapped Landslide
                      Hazard, Flood Hazard, Bushfire Hazard and Biodiversity, Waterways and Wetlands
                      Overlays. The roads that lead into the subject site are subject to flooding, limiting access
                      to/from nearby townships. Engineering recognises that visitors of the site are likely to be
                      unfamiliar with the natural hazard patterns of the local area (i.e., bushfires, flash flooding,

                                                                                                       Page 8 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 9

                      etc.) which may create unsafe conditions for those visitors driving to the subject site.
                      Engineering believes that the risk can be minimised by preparing and implementing a
                      Natural Hazard Management strategy. Engineering believes that the proposed
                      development can achieve compliance with the relevant scheme requirements and
                      recommends the following conditions.
               •      Senior Environment Officer – as recommended.
                      Comments provided by Council’s Senior Environment Officer are referenced in the above
                      assessment.
                      Further to our site inspection, please see comments regarding the ground truthing of the
                      site and the area proposed for the proposed cabin locations.
                      The area proposal can be broken into two distinct areas proposed for cabins:
                      Area 1 (Pink) A single cabin proposed on the western boundary of the access track on a
                      low flood plain like paddock, surrounded on all sides by waterways and overflow channels
                      and constrained by riparian protection and flooding & inundation and;
                      Area 2 (Green) A higher in elevation paddock proposed to accommodate 3 cabins that is
                      constrained by riparian protection area and area of biodiversity significance.




                                                                                                     Page 9 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 10

               Onsite inspections confirmed that area 1 (Pink) was not a suitable location for infrastructure due
               to the proximity to waterways, being within a riparian protection area and an area subject to
               flooding and inundation. Several waterways and overflow channels surrounded this proposed
               cabin.
               The application was amended to remove the 4th cabin located in Area 1, with the remaining 3
               cabins in Area 2.




                                                                                                  Page 10 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 11

               Bushfire
               A bushfire hazard assessment has been completed for Lot 218 on MCH186, located at 332
               Eastern Branch Road, Kin Kin. A Local Hazard Map has been prepared for the site consistent
               with the State Planning Policy – Natural Hazards, Risk and Resilience – Technical Manual. The
               Local Hazard Map presented in the bushfire hazard assessment (figure 3) has identified that the
               proposed development area and majority of the surrounding landscape is located within a Low
               Potential Bushfire Intensity Area. A Potential Impact Buffer extends 100m from a High Potential
               Bushfire Intensity and occurs close to the proposed development area, however no part of the
               development (including proposed access) extends into this Buffer Area.
               Standard bushfire / emergency bushfire conditions have been provided which include provision of
               water for firefighting purposes, and an emergency evacuation plan for the site.
               Rehabilitation
               Conditions of approval requiring the rehabilitation and revegetation of the main waterway that
               traverses the site have been provided. In accordance with the Biodiversity, Waterways and
               Wetlands Overlay Code AO6.2. Details of the rehabilitation works are to be undertaken as part
               of a future operational works.

                                                                                               Page 11 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 12

               6.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme
               and does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No. MCU22/0052 for a Material Change of Use - Short-term
               accommodation situated at 332 Eastern Branch Rd Kin Kin Qld 4571 and described as Lot 218
               MCH 186, it is recommended the application be approved in accordance with the following
               details for the Decision Notice:
               1.     APPLICATION DETAILS

               Application No:              MCU22/0052

               Street address:              332 Eastern Branch Rd Kin Kin Qld 4571

               Real property description:   Lot 218 MCH 186

               Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.     DECISION DETAILS

               Council decided to issue the following type of approval:
               •      Development Permit for Material Change of Use - Short-term accommodation (3 cabins)
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice, as relevant to each
                      particular stage, must be complied with prior to the use commencing, and then compliance
                      maintained at all times while the use continues.

                                                                                                   Page 12 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 13

                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.       Rev.   Plan/Document Name                         Date

                        A.01.1         A      Context Site Plan prepared by BTC Design 7 November 2023
                                              & Drafting
                                                                                       (received by Council)

                        A.01.2         A      Site Plan prepared by BTC Design & 7 November 2023
                                              Drafting
                                                                                 (received by Council)

                        A.01.3         A      Plans and Elevations prepared by BTC 7 November 2023
                                              Design & Drafting
                                                                                   (received by Council)

                      Currency Period
               3.     This development approval lapses if the use has not happened by 12 December 2029,
                      unless an application to extend the currency period is approved by Council.
                      Sunset Clause for Completion of Approved Development
               4.     Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
                      approval lapses if the whole of the approved use has not happened by 12 December 2029.
                      Staging
               5.     The development may be staged, provided that any road access and infrastructure
                      services required to service a particular stage are constructed with that stage. Unless
                      otherwise expressly stated, the conditions must be read as being applicable to all stages.
               6.     All rehabilitation works required as part of Condition 12 must be completed prior to the
                      commencement of Stage 1.
                      Nature and Extent of Approved Use
               7.     The approved use must be used only for short term visitor accommodation only. The site
                      must not be occupied by persons for the purpose of permanent accommodation, excluding
                      those persons in the existing dwelling house on the site.
               8.     The total number of guests accommodated at any one time must not exceed 6 people.
                      Building Height
               9.     The maximum height of the development must not exceed 5 metres above the finished
                      ground level and the natural ground level.
                      Street Identification
               10.    The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
                      Building Appearance
               11.    All air conditioning units or other mechanical equipment must be located at ground level, or
                      otherwise fully enclosed or screened such that they are not visible from the street frontages
                      nor adjoining properties.




                                                                                                    Page 13 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 14

                      Landscaping Works
               12.    The development site must be landscaped and rehabilitated. The works must be
                      undertaken in accordance with an Operational Works approval and the Noosa Plan for that
                      specific area and must include in particular:
                      a.      A rehabilitation management plan.
                      b.      The land area 10 metres either side of the waterway identified in red on the
                              annotated plan must be rehabilitated and revegetated and removed of all weeds
                              species listed in Planning Scheme Policy 2 Landscaping and Council’s Biosecurity
                              Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and Non-scheduled
                              invasive species.
                      c.      Rehabilitation works must incorporate tree, shrubs, groundcovers, and grasses
                              selected and installed in accordance with the Planning Scheme Policy 2 –
                              Landscaping.
                      d.      The 1 in 2 batters on the northeastern side of the car park must be landscaped with
                              trees shrubs and groundcovers to stabilise and screen the carpark when viewed from
                              Eastern Branch Road.
               13.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Bushfire Management
               14.    The site must be provided with a water storage reservoir having a minimum 5,000 litres of
                      water for emergency firefighting purposes per cabin. Such storage must be provided in
                      addition to the water supply capacity required for the use and must be provided in the form
                      of either an accessible dam, swimming pool, or rainwater tank. If by rainwater tank, water
                      storage for firefighting purposes must be provided either in a separate rainwater tank or a
                      reserve section in the main water supply tank on which:
                      a.      the domestic take off from the tank is at or above the 5,000 litre point; and
                      b.      standard rural fire brigade fittings are fitted to the tank outlet for access by four wheel
                              drive rural services vehicles.
               15.    The site must be provided with an auxiliary power supply such as a petrol driven fire fighter
                      pump (or generator), together with a hose of sufficient length to easily reach around to all
                      sides of the buildings.
               16.    A bushfire evacuation plan for the site must be prepared by a qualified person* and
                      submitted to Council prior to the issue of any Development Permit for Operational Works.
                      *(Refer to Advisory Note)
               17.    A copy of the bushfire evacuation plan for the development must be provided to the nearest
                      fire authority.
               18.    Certification must be submitted to Council from a qualified person* which certifies that the
                      development has been constructed in accordance with the bushfire management
                      conditions of this Decision Notice.
                      *(Refer to Advisory Note)
                      Natural Hazard Management
               19.    The Flood and Fire Management strategies outlined in the Natural Hazard Management
                      Report (doc No. 304-001-01, Rev. A) prepared by BAX Engineering must be adhered to at
                      all times while the use is open for business. In addition to this report, the following must
                      also be prepared, actioned and adhered to at all times while the use is open for business:


                                                                                                         Page 14 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 15

                      a. Notifying all prospective guests on all advertising devices (i.e., websites, flyers,
                         brochures, etc.) that the site may be inaccessible during rain and fire events;
                      b. A process for management to advise booked guests for the potential for the site to be
                         inaccessible due to predicted weather events; and
                      c. On-site controls and processes for guests currently on-site during flooding and fire
                         events.
                      Water Supply
               20.    The development must be provided with a potable water supply connected to each cabin.
                      The storage capacity of the potable water supply must be a minimum of 5000 litres per
                      guest. The storage capacity of the potable water supply must be a minimum of 4000 litres
                      per guest bedroom/unit/cabin.
                      Wastewater Treatment and Disposal
               21.    The development must be provided with an on-site wastewater treatment and effluent
                      disposal system having a capacity sufficient for the use*.
                      *(Refer to Advisory Note)
                      Site Access and Driveways
               22.    An access driveway must be provided from Eastern Branch Road to all parking and
                      manoeuvring areas of the development. The access driveway must be constructed using
                      an all-purpose weather material. The works must be undertaken in accordance with an
                      Operational Works approval and must be generally in accordance with BAX Engineering’s
                      Roadworks Layout Plan Sheet 2 of 2 (dwg No. 304-001-302, Rev. B).
               23.    The property owner is wholly responsible for the ongoing maintenance of the proposed
                      gravel driveway and gravel walking track. The property owner must ensure that the gravel
                      driveway and gravel walking track are returned to their post-construction conditions after
                      inclement weather events that may have been damaged due to flooding or rainfall.
                      Car Parking
               24.    A minimum of 3 car parking spaces must be provided and marked on the site and made
                      available and accessible at all times while the use is open for business. The works must be
                      undertaken in accordance with an Operational Works approval, be generally in accordance
                      with BAX Engineering’s Overall Roadworks Layout Plan (dwg No. 304-001-300, Rev. B)
                      and must have dimensions, crossfalls and gradients in accordance with Australian
                      Standard AS2890: Parking Facilities.
               25.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                      Stormwater Drainage
               26.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               27.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               28.    All easements must be designed in accordance with the planning scheme and granted at
                      no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               29.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.


                                                                                                     Page 15 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 16

                      Geotechnical Stability
               30.    All works must be carried out in accordance with the recommendations contained Douglas
                      Partners’ Investigation Summary Report (Doc No. R.001) dated 21 December 2022.
                      Earthworks and Retaining Walls
               31.    All fill and associated batters must be undertaken in accordance with an Operational Works
                      approval, be generally in accordance with BAX Engineering’s Earthworks Layout Plan (dwg
                      No. 304-001-200, Rev. B) and be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council.
                      Damage to Services and Assets
               32.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety,
                              immediately; or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and
                      assets must first be referred to the relevant service authority for approval.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                         Date

                304-001-200            B      Earthworks Layout Plan, prepared by BAX Engineering        18.10.23

                304-001-300            B      Overall Roadworks Layout Plan, prepared by BAX 18.10.23
                                              Engineering

                304-001-301            B      Roadworks Layout Plan Sheet 1 of 2, prepared by BAX 18.10.23
                                              Engineering

                304-001-302            B      Roadworks Layout Plan Sheet 2 of 2, prepared by BAX 18.10.23
                                              Engineering

                304-001-200            B      Earthworks Layout Plan (As annotated by Council), 18.10.23
                                              prepared by Bax Engineering

                304-001-01             A      Natural Hazard Management Report, prepared by BAX 4.11.2023
                                              Engineers

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form
               part of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or
                      obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person
                      who carries out an activity must take all reasonable and practicable measures to ensure
                      the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with

                                                                                                       Page 16 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 17

                      the duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
                      activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
                      heritage value of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH
                      Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in
                      addition to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.
                      Qualified Person
               4.     For the purpose of preparing a Landscape / Rehabilitation Plan, a qualified person is
                      considered to be a landscape architect, landscape designer and/or horticulturist with a
                      minimum of 3 years current experience in the field of landscape design.
               5.     For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
                              the field of arboriculture.
               6.     For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
                      landscape architect or ecologist with a minimum of 3 years current experience in the field of
                      landscape design.
               7.     For the purpose of preparing a Fauna Management Plan, a qualified person is considered
                      to be an ecologist with a minimum of 3 years current experience in the field of fauna
                      assessment and management.
               8.     For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
                      with the bushfire requirements of this Decision Notice, a qualified person is considered to
                      be an ecologist with a minimum of 3 years current experience in the field of bushfire
                      assessment and management.
                      Short Stay Letting
               9.     On 21 October 2021, Noosa Council adopted a new local law for short stay letting and
                      home hosted accommodation. The local law commenced on 1 February 2022. A one off
                      application will need to be made, under the new local law, for all existing and new
                      properties operating short stay letting or home hosted accommodation, unless identified as
                      exempt.
                      For more information and application forms, please visit Council’s website below:




                                                                                                    Page 17 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Page 18

                      https://www.noosa.qld.gov.au/short-stay-letting-home-hosted-accommodation-local-law
                      Advertising Devices
               10.    All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to
                      being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1
                      is prohibited from being erected in the Shire.
                      Infrastructure Charges
               11.    All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

               Type of Development Permit Required             Subject of the required Development Permit

               Development Permit for Operational Works        Road work,       Drainage   work,    Earthworks,
                                                               Vegetation.

               Development Permit for Building Works           All building work.

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make
               written representations to Council about the conditions contained within the development
               approval. If Council agrees or agrees in part with the representations, a negotiated decision
               notice will be issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                    Page 18 of 18

Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU22 0052 [As Published].pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.