Council archive · source document
Delegated Report - Code - Planning MCU22 0052 [As Published] · MCU22/0052
DEVELOPMENT ASSESSMENT DELEGATED REPORT
Author Development Planner, Georgina Schramm
Development Assessment
APPLICATION DETAILS
Application No. MCU22/0052
Applicant Quentin & Tamara Ellis C/-JDBA Certifiers
Proposal Material Change of Use - Short-term accommodation (3 cabins)
Properly Made Date 26 May 2022
Information Request Date 9 June 2022
Information Response Date 17 April 2023
Further Advice Request 26 June 2023
Further Advice Response 7 November 2023
Decision Due Date 12.12.2023 (extended by agreement)
Report Reviewed & Tara Norley - 12.12.2023
Finalised By
PROPERTY DETAILS
Property Address 332 Eastern Branch Rd Kin Kin Qld 4571
RP Description Lot 218 MCH 186
Land Area 196580.00 m² / 19.6 hectares
Existing Use of Land Residential – Dwelling house, rural pursuits
STATUTORY DETAILS
SEQRP Designation Regional Landscape and Rural Production Area
Zone Rural
Precinct Not Applicable
Local Plan Area Not Applicable
Overlays Agricultural Land Conservation Area
Biodiversity, Waterways and Wetlands
Bushfire Hazard
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
Landslide Hazard
Assessment Type Code
1. PROPOSAL
The application seeks approval for a Material Change of Use - Short-term accommodation (3
cabins). The 3 cabins are located on the western side of the waterway, with access from an
existing, informal track.
Each cabin is raised on stilts, 51m2 in size, accommodating a bedroom, bath, kitchen and living
with a combined deck and alfresco area. A common area for parking is proposed with a
pedestrian footpath to each cabin to avoid the amount of traffic through the identified riparian
buffer of the Biodiversity, Waterways and Wetland Overlay and having to cross culverts.
The applicant has provided a flood and ecological assessment in support of the application.
Stage 1 will include the construction of the Cabins 1 and 2.
Stage 2 will include the construction of Cabin 3.
The locality and proposal plan are included below.
Figure 1 – Locality
Page 2 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 3
Figure 2 – Site Plan
Figure 3 – Floor Plan
Page 3 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 4
Figure 4 – Elevations
2. APPLICATION BACKGROUND
The application was originally lodged in April 2022 for Nature Based Tourism (6 permanent
tents). There was limited detail provided in support of the application for the purpose of Nature
Based Tourism (NBT) as NBT requires the use of the premises for a tourism activity for the
conservation or interpretation of the natural environment, local ecosystem in addition to provide
accommodation for tourists.
The application did not adequately demonstrate the tourism activity on the site and the
application was changed from Nature Based Tourism to Short Term Accommodation.
3. SITE DETAILS
3.1. Site Description
The subject site is approximately 19.64ha and adjoins Eastern Branch Road to the east.
The eastern branch of Kin Kin Creek traverses through the eastern site extent. The site is
currently improved with an existing dwelling and associated infrastructure. The site is
characterised by large expanses of historically cleared areas with remnant vegetation extending
into the south-western and north-western site extents. The site is located in a hilly landscape
characterised by low hills interspersed with drainage gullies which flow into Kin Kin Creek
(Eastern Branch) which is located in a narrow alluvial valley between the hills.
3.2. Surrounding Land Uses
Surrounding premises are of similar topography and predominately used for rural pursuits.
4. ASSESSMENT
4.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
Page 4 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 5
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017; and
• Noosa Plan 2020.
4.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
• Rural Zone Code;
• Visitor Accommodation Code;
• Works Codes;
• Biodiversity, Waterways and Wetlands Overlay Code;
• Bushfire Hazard Overlay Code;
• Landslide Hazard Overlay Code.
The subject site is located in Kin Kin and is zoned Medium Density Residential. The proposed
use is identified as a consistent use within the zone and is required to follow a code assessable
application process.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Criteria Planning Scheme Proposal Complies
Building height
• storeys 2 storeys max 1 storeys
• metres 8 metres 4.2 metres
Gross floor area 90m² max (each) 51m² (each)
Boundary setbacks
• Frontage 10 metres min 131 metres
• Side 22 metres
ALCA 200 metres 22 metres X
Carparking 3 spaces 4 spaces
Agricultural Land Classification Area
Acceptable outcomes AO2.3 & AO2.4 of the Rural Zone Code seeks –
AO2.3 Where located in the Agricultural Land Conservation Area accommodation is of a
temporary or semi-permanent nature (such as tents, yurts, relocatable dwellings or recreational
vehicles) or it adaptively reuses well-established rural buildings.
AO2.4 No sensitive land use is established closer than 200 metres from land on an adjacent
property included in the Rural zone and mapped as Agricultural Land Conservation Area as
shown in Agricultural Land Overlap Maps in schedule 2.
The proposed short term accommodation cabins are located in an area identified as Agricultural
Land Conservation Area (ALCA) and located within 200 metres from land on an adjacent
property included in the Rural zone and mapped as ALCA. Therefore the development is to be
assessed against the corresponding Performance outcome PO2 of the Rural Zone Code, which
seeks –
Page 5 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 6
Development does not result in the loss or diminished productive capacity of Agricultural Land
Conservation Area.
Each cabin is raised and therefore has reversible impacts, should the desire be to revert the land
to agricultural land. In addition, the portion of land mapped as ALCA, at approximately 2100m2,
is heavily constrained, being surrounded by biodiversity and riparian mapped areas and is not of
a sufficient size or location to be meaningfully utilised for rural purposes.
Figure X: Excerpt of subject site showing location of cabins in ALCA mapped area
In regard to the reduced boundary setback of 22 metres in lieu of 200 metres, following a site
inspection it is clear that the subject site and adjoining premises are not undertaking rural
operations of a scale to raise conflict with one another. The addition of the cabins is not
considered to diminish the productivity of the subject site or the adjoining premises, the
development complies with the Performance outcome.
Vehicles
Acceptable outcome AO11.1 of the Visitor Accommodation Code seeks –
Visitor Accommodation is directly accessible from a sealed road or a good standard gravelled
road.
Eastern Branch Road is an unsealed, dirt road and therefore is to be assessed against the
Performance outcome.
The corresponding Performance outcome PO11 of the Visitor Accommodation Code seeks -
Safe vehicular access is provided to and from the site without adversely impacting on the safety
of the road network.
The road is an all-weather constructed road, that is on a routine maintenance schedule with
Council, comparable to other unsealed road networks with the Shire. The applicant has provided
a Road Assessment undertaken by BAX Engineering to assist in determining the suitability of the
road and access for the intended use.
Eastern Branch Road commences from the Pomona Kin Kin Road approximately 3.4km to
the north. The Pomona Kin Kin Road is a sealed road while the full length of the Eastern
Branch Road is a gravel formation that terminates at a dead end approximately 550m to
the south of the project site.
There are several creek crossings along the Eastern Branch Road of which some are
concreted. The road formation at the frontage of the project site is a gravel formation of
approximately 5m to 5.3m in width. There is also opportunity for vehicles to pass at the site
entrance without any modifications. There are scattered mature trees on the both the
Page 6 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 7
eastern and western side verges. All vegetation along the road frontage is clear of the
formation and does not appear to pose a risk for vehicle sight stopping distance.
The road is considered to be constructed to an adequate standard for 3 cabins, therefore the
development complies with the Performance outcome.
Flood Hazard
A portion of the site is identified as being susceptible to flooding along the creek and in the lower
lying portion of the lot in the northeastern corner of the site. The 3 cabins, associated structures
and car parking area are all located clear of the flood hazard. In addition, the applicant provided
a Hydraulic Assessment in the Information Request response, with the applicant stating:
The following conclusions have been made:
• based on the proposed locations of the cabins, the areas proposed appear to be free
of flood during the modelled storm events.
• Access to the cabins would be restricted during the design storm events modelled.
Nonetheless so would access to the property based on the unpassable creek
crossings on Eastern Branch Road. Therefore, access from the cabins to a point of
refuge has been considered and can be achieved. This point of refuge would be the
existing dwelling/managers residence at a higher elevation.
• Stormwater quality treatment can be achieved through rainwater harvesting tanks and
buffer areas.
• The environmental footprint for the cabins would be minimal based on the areas
already cleared and the tracks and culverts already in place.
In summary, the proposed cabin locations on the subject site will result in non-actionable
nuisance of stormwater runoff, be free of flooding and have safe refuge opportunities should
it be faced with unpredicted intermittent weather.
Biodiversity, Waterways and Wetlands
Acceptable outcome AO6.1 of the Biodiversity, Waterways and Wetlands seeks - Development
and clearing of vegetation does not occur within:
a) a riparian buffer area;
b) a wetland area; or
c) 10 metres either side of the centre line of other waterways identified on
a Biodiversity, Waterways and Wetlands Overlay Map.
The applicant seeks to construct 3 Short term accommodation cabins, 1 of the cabins is
proposed to be partially located in the riparian buffer. The proposed access and Cabin 3 are
located in the riparian buffer, and therefore is to be assessed against the corresponding
Performance outcome.
PO6 The biodiversity and ecosystem values of waterways, wetlands and adjacent riparian zones
are protected by:
a) avoiding any new development in a riparian buffer area and wetland area;
b) retaining aquatic and terrestrial habitat in riparian zones;
c) maintaining and enhancing wildlife corridors and connectivity along watercourses
and drainage lines for native fauna movement;
d) avoiding edge effects and damage from adjacent land uses;
e) maintaining stream integrity and bank stability by minimising bank erosion and
slumping;
f) maintaining water quality through filtering sediments, nutrients and other pollutants;
and
g) removing pest species and replacing them with local native species.
Council’s Senior Environment Officer has provided the following comments regarding the
proposed development within the mapped Biodiversity, Waterways and Wetlands Overlay:
Page 7 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 8
This site is flanked by a stream order 1 on its southern side and native vegetation to its north.
Areas of this paddock have been historically planted with a range on non-native species including
fruit trees. An area of approximately 750 square metres is available on this platform that is not
constrained by either biodiversity significance or riparian protection area. This area is identified
by Council Officers as an appropriate location for the proposed cabins. A small area equal to 100
square metres of the riparian protection area to the northeast is also identified as a potentially
suitable location for infrastructure for the following reasons:
• More than 30 metres from the southern stream order 1
• More than 70 metres from the eastern stream order 3-4
• Appears to be located in a mapping anomaly, as the southern stream order 1 should be
afforded 10 metres of separation however in this instance is provided with approx. 30-35 m.
• The area is currently maintained pasture that contains no riparian vegetation or vegetation
that would be associated within the riparian zone of a waterway
The location of the cabin in the riparian area is considered reasonable given the circumstances of
the site, the development will be conditioned to be rehabilitated along the waterways. The
development therefore complies with the Performance outcome.
Bushfire Hazard
Acceptable outcome AO1.1 of the Bushfire Hazard Overlay Code seeks - Development which
will materially increase the number of people living or congregating on premises,
including reconfiguring a lot, is not located within a medium or high bushfire hazard area.
The development is located in the Medium Potential Impact Buffer of the Bushfire Hazard
Overlay and therefore is to be assessed against the corresponding Performance outcome.
Performance outcome PO1 seeks - Development maintains the safety of people and property
from the adverse impacts of bushfire.
A bushfire hazard assessment has been completed for Lot 218 on MCH186, located at 332
Eastern Branch Road, Kin Kin. A Local Hazard Map has been prepared for the site consistent
with the State Planning Policy – Natural Hazards, Risk and Resilience – Technical Manual.
The Local Hazard Map presented in the bushfire hazard assessment has identified that the
proposed development area and majority of the surrounding landscape is located within a Low
Potential Bushfire Intensity Area. A Potential Impact Buffer extends 100m from a High Potential
Bushfire Intensity and occurs close to the proposed development area, however no part of the
development (including proposed access) extends into this Buffer Area.
Standard bushfire / emergency bushfire conditions have been provided which include provision of
water for firefighting purposes, and an emergency evacuation plan for the site. The development
will be appropriately conditioned to comply with the Performance outcome.
5. CONSULTATION
5.1. Referral Agencies
Not Applicable
5.2. Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or
comment:
• Development Engineer – as recommended.
The proposed development includes the construction of 3 cabins along Eastern Branch
Road, Kin Kin. The development site is encumbered by Council’s mapped Landslide
Hazard, Flood Hazard, Bushfire Hazard and Biodiversity, Waterways and Wetlands
Overlays. The roads that lead into the subject site are subject to flooding, limiting access
to/from nearby townships. Engineering recognises that visitors of the site are likely to be
unfamiliar with the natural hazard patterns of the local area (i.e., bushfires, flash flooding,
Page 8 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 9
etc.) which may create unsafe conditions for those visitors driving to the subject site.
Engineering believes that the risk can be minimised by preparing and implementing a
Natural Hazard Management strategy. Engineering believes that the proposed
development can achieve compliance with the relevant scheme requirements and
recommends the following conditions.
• Senior Environment Officer – as recommended.
Comments provided by Council’s Senior Environment Officer are referenced in the above
assessment.
Further to our site inspection, please see comments regarding the ground truthing of the
site and the area proposed for the proposed cabin locations.
The area proposal can be broken into two distinct areas proposed for cabins:
Area 1 (Pink) A single cabin proposed on the western boundary of the access track on a
low flood plain like paddock, surrounded on all sides by waterways and overflow channels
and constrained by riparian protection and flooding & inundation and;
Area 2 (Green) A higher in elevation paddock proposed to accommodate 3 cabins that is
constrained by riparian protection area and area of biodiversity significance.
Page 9 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 10
Onsite inspections confirmed that area 1 (Pink) was not a suitable location for infrastructure due
to the proximity to waterways, being within a riparian protection area and an area subject to
flooding and inundation. Several waterways and overflow channels surrounded this proposed
cabin.
The application was amended to remove the 4th cabin located in Area 1, with the remaining 3
cabins in Area 2.
Page 10 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 11
Bushfire
A bushfire hazard assessment has been completed for Lot 218 on MCH186, located at 332
Eastern Branch Road, Kin Kin. A Local Hazard Map has been prepared for the site consistent
with the State Planning Policy – Natural Hazards, Risk and Resilience – Technical Manual. The
Local Hazard Map presented in the bushfire hazard assessment (figure 3) has identified that the
proposed development area and majority of the surrounding landscape is located within a Low
Potential Bushfire Intensity Area. A Potential Impact Buffer extends 100m from a High Potential
Bushfire Intensity and occurs close to the proposed development area, however no part of the
development (including proposed access) extends into this Buffer Area.
Standard bushfire / emergency bushfire conditions have been provided which include provision of
water for firefighting purposes, and an emergency evacuation plan for the site.
Rehabilitation
Conditions of approval requiring the rehabilitation and revegetation of the main waterway that
traverses the site have been provided. In accordance with the Biodiversity, Waterways and
Wetlands Overlay Code AO6.2. Details of the rehabilitation works are to be undertaken as part
of a future operational works.
Page 11 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 12
6. CONCLUSION & REASONS FOR DECISION
The proposed development generally complies with the requirements of the planning scheme
and does not raise any significant issues that cannot be addressed by reasonable and relevant
conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No. MCU22/0052 for a Material Change of Use - Short-term
accommodation situated at 332 Eastern Branch Rd Kin Kin Qld 4571 and described as Lot 218
MCH 186, it is recommended the application be approved in accordance with the following
details for the Decision Notice:
1. APPLICATION DETAILS
Application No: MCU22/0052
Street address: 332 Eastern Branch Rd Kin Kin Qld 4571
Real property description: Lot 218 MCH 186
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Material Change of Use - Short-term accommodation (3 cabins)
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice, as relevant to each
particular stage, must be complied with prior to the use commencing, and then compliance
maintained at all times while the use continues.
Page 12 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 13
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A.01.1 A Context Site Plan prepared by BTC Design 7 November 2023
& Drafting
(received by Council)
A.01.2 A Site Plan prepared by BTC Design & 7 November 2023
Drafting
(received by Council)
A.01.3 A Plans and Elevations prepared by BTC 7 November 2023
Design & Drafting
(received by Council)
Currency Period
3. This development approval lapses if the use has not happened by 12 December 2029,
unless an application to extend the currency period is approved by Council.
Sunset Clause for Completion of Approved Development
4. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of this development
approval lapses if the whole of the approved use has not happened by 12 December 2029.
Staging
5. The development may be staged, provided that any road access and infrastructure
services required to service a particular stage are constructed with that stage. Unless
otherwise expressly stated, the conditions must be read as being applicable to all stages.
6. All rehabilitation works required as part of Condition 12 must be completed prior to the
commencement of Stage 1.
Nature and Extent of Approved Use
7. The approved use must be used only for short term visitor accommodation only. The site
must not be occupied by persons for the purpose of permanent accommodation, excluding
those persons in the existing dwelling house on the site.
8. The total number of guests accommodated at any one time must not exceed 6 people.
Building Height
9. The maximum height of the development must not exceed 5 metres above the finished
ground level and the natural ground level.
Street Identification
10. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate, the
building name.
Building Appearance
11. All air conditioning units or other mechanical equipment must be located at ground level, or
otherwise fully enclosed or screened such that they are not visible from the street frontages
nor adjoining properties.
Page 13 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 14
Landscaping Works
12. The development site must be landscaped and rehabilitated. The works must be
undertaken in accordance with an Operational Works approval and the Noosa Plan for that
specific area and must include in particular:
a. A rehabilitation management plan.
b. The land area 10 metres either side of the waterway identified in red on the
annotated plan must be rehabilitated and revegetated and removed of all weeds
species listed in Planning Scheme Policy 2 Landscaping and Council’s Biosecurity
Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and Non-scheduled
invasive species.
c. Rehabilitation works must incorporate tree, shrubs, groundcovers, and grasses
selected and installed in accordance with the Planning Scheme Policy 2 –
Landscaping.
d. The 1 in 2 batters on the northeastern side of the car park must be landscaped with
trees shrubs and groundcovers to stabilise and screen the carpark when viewed from
Eastern Branch Road.
13. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Bushfire Management
14. The site must be provided with a water storage reservoir having a minimum 5,000 litres of
water for emergency firefighting purposes per cabin. Such storage must be provided in
addition to the water supply capacity required for the use and must be provided in the form
of either an accessible dam, swimming pool, or rainwater tank. If by rainwater tank, water
storage for firefighting purposes must be provided either in a separate rainwater tank or a
reserve section in the main water supply tank on which:
a. the domestic take off from the tank is at or above the 5,000 litre point; and
b. standard rural fire brigade fittings are fitted to the tank outlet for access by four wheel
drive rural services vehicles.
15. The site must be provided with an auxiliary power supply such as a petrol driven fire fighter
pump (or generator), together with a hose of sufficient length to easily reach around to all
sides of the buildings.
16. A bushfire evacuation plan for the site must be prepared by a qualified person* and
submitted to Council prior to the issue of any Development Permit for Operational Works.
*(Refer to Advisory Note)
17. A copy of the bushfire evacuation plan for the development must be provided to the nearest
fire authority.
18. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the bushfire management
conditions of this Decision Notice.
*(Refer to Advisory Note)
Natural Hazard Management
19. The Flood and Fire Management strategies outlined in the Natural Hazard Management
Report (doc No. 304-001-01, Rev. A) prepared by BAX Engineering must be adhered to at
all times while the use is open for business. In addition to this report, the following must
also be prepared, actioned and adhered to at all times while the use is open for business:
Page 14 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 15
a. Notifying all prospective guests on all advertising devices (i.e., websites, flyers,
brochures, etc.) that the site may be inaccessible during rain and fire events;
b. A process for management to advise booked guests for the potential for the site to be
inaccessible due to predicted weather events; and
c. On-site controls and processes for guests currently on-site during flooding and fire
events.
Water Supply
20. The development must be provided with a potable water supply connected to each cabin.
The storage capacity of the potable water supply must be a minimum of 5000 litres per
guest. The storage capacity of the potable water supply must be a minimum of 4000 litres
per guest bedroom/unit/cabin.
Wastewater Treatment and Disposal
21. The development must be provided with an on-site wastewater treatment and effluent
disposal system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Site Access and Driveways
22. An access driveway must be provided from Eastern Branch Road to all parking and
manoeuvring areas of the development. The access driveway must be constructed using
an all-purpose weather material. The works must be undertaken in accordance with an
Operational Works approval and must be generally in accordance with BAX Engineering’s
Roadworks Layout Plan Sheet 2 of 2 (dwg No. 304-001-302, Rev. B).
23. The property owner is wholly responsible for the ongoing maintenance of the proposed
gravel driveway and gravel walking track. The property owner must ensure that the gravel
driveway and gravel walking track are returned to their post-construction conditions after
inclement weather events that may have been damaged due to flooding or rainfall.
Car Parking
24. A minimum of 3 car parking spaces must be provided and marked on the site and made
available and accessible at all times while the use is open for business. The works must be
undertaken in accordance with an Operational Works approval, be generally in accordance
with BAX Engineering’s Overall Roadworks Layout Plan (dwg No. 304-001-300, Rev. B)
and must have dimensions, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
25. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
26. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
27. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
28. All easements must be designed in accordance with the planning scheme and granted at
no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
29. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Page 15 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 16
Geotechnical Stability
30. All works must be carried out in accordance with the recommendations contained Douglas
Partners’ Investigation Summary Report (Doc No. R.001) dated 21 December 2022.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, be generally in accordance with BAX Engineering’s Earthworks Layout Plan (dwg
No. 304-001-200, Rev. B) and be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
304-001-200 B Earthworks Layout Plan, prepared by BAX Engineering 18.10.23
304-001-300 B Overall Roadworks Layout Plan, prepared by BAX 18.10.23
Engineering
304-001-301 B Roadworks Layout Plan Sheet 1 of 2, prepared by BAX 18.10.23
Engineering
304-001-302 B Roadworks Layout Plan Sheet 2 of 2, prepared by BAX 18.10.23
Engineering
304-001-200 B Earthworks Layout Plan (As annotated by Council), 18.10.23
prepared by Bax Engineering
304-001-01 A Natural Hazard Management Report, prepared by BAX 4.11.2023
Engineers
6. REFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with
Page 16 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 17
the duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH
Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development Assessment
Branch to arrange a Development Compliance Inspection.
Qualified Person
4. For the purpose of preparing a Landscape / Rehabilitation Plan, a qualified person is
considered to be a landscape architect, landscape designer and/or horticulturist with a
minimum of 3 years current experience in the field of landscape design.
5. For the purpose of preparing an Arborist Report, a qualified person is considered to be a
person with either:
a. ISA certification; or
b. a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
the field of arboriculture.
6. For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
landscape architect or ecologist with a minimum of 3 years current experience in the field of
landscape design.
7. For the purpose of preparing a Fauna Management Plan, a qualified person is considered
to be an ecologist with a minimum of 3 years current experience in the field of fauna
assessment and management.
8. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered to
be an ecologist with a minimum of 3 years current experience in the field of bushfire
assessment and management.
Short Stay Letting
9. On 21 October 2021, Noosa Council adopted a new local law for short stay letting and
home hosted accommodation. The local law commenced on 1 February 2022. A one off
application will need to be made, under the new local law, for all existing and new
properties operating short stay letting or home hosted accommodation, unless identified as
exempt.
For more information and application forms, please visit Council’s website below:
Page 17 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Page 18
https://www.noosa.qld.gov.au/short-stay-letting-home-hosted-accommodation-local-law
Advertising Devices
10. All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
(Administration) 2015 including both temporary and permanent signage. All freestanding,
pylon or pole signs or signage that is illuminated requires approval from Council prior to
being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1
is prohibited from being erected in the Shire.
Infrastructure Charges
11. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Road work, Drainage work, Earthworks,
Vegetation.
Development Permit for Building Works All building work.
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make
written representations to Council about the conditions contained within the development
approval. If Council agrees or agrees in part with the representations, a negotiated decision
notice will be issued. Only one negotiated decision notice may be given.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.
Page 18 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
Used in these records
Delegated Report - Code - Planning MCU22 0052 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.