Council archive · source document
Delegated Report - Code - Planning MCU22 0052 [As Published] · MCU22/0052
Onsite inspections confirmed that area 1 (Pink) was not a suitable location for infrastructure due
to the proximity to waterways, being within a riparian protection area and an area subject to
flooding and inundation. Several waterways and overflow channels surrounded this proposed
cabin.
The application was amended to remove the 4th cabin located in Area 1, with the remaining 3
cabins in Area 2.
Page 10 of 18
Document Set ID: 22700275
Version: 4, Version Date: 14/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0052 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.