Original source · versioned page text
3018 AppendixC
6. RECOMMENDATIONS The following recommendations are based on the assumption of a 4 bedroom residence being constructed on the allotment at a future date. e The Design Irrigation Rate of 3mm/day be adopted. + The site be provided with an “Aerated wastewater-treatment system” capable of producing Advanced secondary effluent (e.g Taylex ABS), or an equivalent system, to councils approval in lieu of a septic tank. ¢ The disposal system be by, # A pegged to the ground covered surface drip irrigation system consisting of “‘Wasteflow or Netafim’ Pressure-Compensating Drippers, as per AS/NZS 1547:2012. Purple line is to be used from the ASTP to the irrigation area. An in-line filter is to be installed between the Treatment Plant and the Irrigation System. Regular maintenance of the Filter shall be undertaken, according to manufacturer’s recommendation. e An 150mm high diversion bank/border shall be constructed around the irrigated area. e The dripper system shall evenly distribute effluent to avoid clogging by soil or root intrusion. Maximum spacing shall be 1000mm. e Non-return valves and flush-out valves should be installed on irrigation lines. The minimum required amount of effluent to be pumped at regular intervals, should be such, that all irrigation lines are full, and effluent delivered equally. e The Wasteflow/Netafim lines are to be placed on the surface, with a 150mm layer of mulch placed over the irrigation lines. Evergreen plants are to be planted (minimum of 30 plants) to maximize evapo-transpiration. Bird resistant mesh is to be placed on the surface of the mulch, and pegged to the ground. ¢ The disposal area required is 300m This area has been calculated on a daily flow rate of 900 litres/day (6 people @150Lper person/ per day) and a design irrigation rate of 3mm/day. This flow rate will accommodate the future proposed 4 bedroom residence only. A 100% reserve area (as per site plan) is to be kept free of buildings and traffic. ¢ The disposal area should be located in the vicinity of PT 1, PT 2 and PT 3 as per attached site plan. e All set-back distances as required by the local authority shall be met; e Stormwater run-off including roofwater from buildings shall be diverted around and away from the disposal area. Imported fill may be required should there be insufficient soil available for the design of the disposal system. Certification The local authority may request that an inspection and certification is undertaken on the installation of the system when nearing completion. The installer must contact Noosa Council prior to ‘burying’ the system, if certification is required. Please note: Personal Hygiene Products, Bleaches and detergents high in phosphorous will damage the capabilities of the Treatment System’s performance. Information should be sought by the Treatment System’s manufacturer for a guide of suitable products acceptable for the system. Yours Sincerely, 4a» \ A - fF fo aor Michael S. Pinkney (Laboratory Manager) Report 21/0611-1 EDR-page3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.