Council archive · source document
Development application part 2 of 2 plans CD and covering letter 132005.1600.01
Plans and drawings: the text below has words only, no drawings.
Proposal Report Application for Permissible Change for a Development Approval for Education - Type 2 School (extension) over Land at 75 Ben Lexcen Drive Sunshine Beach described as Lot 1 on RP 198277 Applicant: Corporation of the Trustees of the Roman Catholic Archdiocese of Brisbane 4 The Proposal The applicant seeks approval to extend the existing St Thomas More Primary school by constructing two new classrooms on site. The classrooms are to be used for a new prep room and a new year 7/6 class room. Proposal plans have been prepared for the development by Middap Architecture and are included in Annexure A. The proposal plans detail the location and size of the proposed new classrooms on site. The new prep room is located adjacent to the existing preschool building along the Ben Lexcen Drive, frontage. This room will have an area of 66.7m2 and includes a store, kitchen and toilets. The Year 7/6 classroom has a proposed area of 65m2 and is located adjacent to the existing year 7 rooms near southern boundary of the site. The new rooms are designed to complement the existing layout and character of the school and have a pitched roof form with masonry block walls. The proposed classrooms will provide for approximately 50 additional students increasing total student numbers from approximately 680 to 730 students. Two teachers will be required for the new classrooms and four additional carparking spaces are provided on site including two adjacent to the proposed year 7 classroom and two near the chapel driveway. The new classrooms are required as St Thomas More School is proposing to increase the number of streams available at the school to four for each year group. At present, the School has a mix of three and four classrooms per year group as detailed below: • Prep - 3 classes • Year 1 - 4 classes . Year 2 - 4 classes . Year 3 - 3 classes • Year 4 - 2 classes • Year 5 - 3 classes • Year 6 - 3 classes • Year 7 - 3 classes As part of current State Education requirements, year seven students will be incorporated into the high school curriculum from 2015 and will no longer be at St Thomas More from this date. As part of this change, the use of the classrooms will be rearranged to meet the new stream numbers. MW martoo consulting - Town Planning + Urban Design Consultants 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development application part 2 of 2 plans CD and covering letter 132005.1600.01Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.