Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

DAForm1 18 Taylor Ct Cooroy[35]

Attached to the e-mail Fw_ Email 1 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS Pt 1.msg.

of 13
  10) Subdivision

  10.1) For this development, how many lots are being created and what is the intended use of those lots:

  Intended use of lots created                  Residential              Commercial             Industrial                 Other, please specify:


  Number of lots created                                                                        54 (building format
                                                                                                under community title

  10.2) Will the subdivision be staged?
     Yes – provide additional details below
     No -
  How many stages will the works include?                                5 Stages (Balance Lots) OPW - via progressive subdivision under Community
                                                                         Title Scheme
  What stage(s) will this development application apply to?              ALL

  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the parts?
  Intended use of parts created                 Residential              Commercial             Industrial                 Other, please specify:


  Number of parts created

  12) Boundary realignment
  12.1) What are the current and proposed areas for each lot comprising the premises?
                                  Current lot                                                                     Proposed lot
                                                   2
  Lot on plan description                 Area (m )                              Lot on plan description                Area (m2)




  12.2) What is the reason for the boundary realignment?



  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement? (attach schedule if there are
  more than two easements)
  Existing or proposed?                         Width (m)        Length (m)     Purpose of the easement? (e.g.         Identify the land/lot(s) benefitted by
                                                                                pedestrian access)                     the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
     Road work                                                 Stormwater                                  Water infrastructure
     Drainage work                                             Earthworks                                  Sewage infrastructure
     Landscaping                                               Signage                                     Clearing vegetation

     Other – please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
     Yes – specify number of new lots:                      Staging (5 Stages) would facilitate enlarging the number of lots through progressive
                                                            subdivision with an arrangement of Community Titles Schemes (CTS). Land Title Act 1994
                                                            (Part 6A, Division 3, Section 115I).
     No

Log in to download the original (DAForm1 18 Taylor Ct Cooroy[35].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.