Appendix C Engineering Report · MCU22/0038
Original PDF page 47, section 1. The text section number identifies this passage in the reader.
EXISTING SERVICE CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
Setbacks and easements
PO1 AO1.1 Proposed development will not adversely impact any
Development near a sewer, water main, stormwater The footing of any structure or building is located clear of existing services and will be located within sufficient
drain, overland flow path or associated structure the zone of influence but no closer than 1.5m (measured clearance.
does not— horizontally) from infrastructure including sewers, water
a) adversely affect the function of the service; mains and stormwater structures;
b) place an additional load on the service; and AND
unduly increase future maintenance costs. AO1.2
No building or structure overhangs the zone of influence;
AND
AO1.3
Finished surface levels maintain a minimum of 600mm
of cover, but no greater than 3m of cover to the
underground infrastructure;
AND
AO1.4
If the existing surface level is altered, surface level
services including manholes and inspection points are
altered to match the new
surface level;
AND
AO1.5
Alterations are constructed in accordance with Section 4
of PSP5 –Engineering Design Standards – Roads,
Drainage and Earthworks and applicable water and
sewerage design standards;
OR
l:\8000-8999\8600-8699\8662\codes\10-03-22 existing service code.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.