TRANSPORT, ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
           PERFORMANCE OUTCOMES                                                 ACCEPTABLE OUTCOMES                                               RESPONSE

                                                              Section 4 of PSP 5, Engineering Design Standards – Roads,
                                                              Drainage and Earthworks.
 Frontage works

 PO13                                                         AO13.1                                                          External roads are existing for the frontages of the
 Development is provided with external roadworks              The following infrastructure components already exist at the    site where required
 along the full extent of the frontage of the site to         frontage of the site or are provided at the developer’s
 an appropriate standard having regard to the                 expense—
 specified function of the road.                              a) full width sealed road;
                                                              b) concrete kerb and channel where appropriate;
                                                              c)  forming and grading to footpaths;
                                                              d) vehicular kerb and footpath crossings;
                                                              e) a constructed bikeway;
                                                              f) a constructed footpath;
                                                              g) a constructed carriageway;
                                                              h) required alterations to public utility mains, services or
                                                                 installations;
                                                              i) construction of any required alterations to public utility
                                                                 mains, services or installations;
                                                              j) stormwater drainage works; and
                                                              k) installation of electrical conduits;
                                                              AND
                                                              AO13.2                                                          External roads are existing for the frontages of the
                                                              Road and drainage design and                                    site where required
                                                              construction is in accordance with Sections 3 and 4 of
                                                              PSP5 Engineering Design Standards – Roads, Drainage
                                                              and Earth works.




   l:\8000-8999\8600-8699\8662\codes\10-03-22 transport, roads and drainage code.docx

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C Engineering Report.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.