Council archive · source document
Appendix C Engineering Report · MCU22/0038
Original PDF page 65, section 1. The text section number identifies this passage in the reader.
WATER SENSITIVE DESIGN CODE
Performance Criteria and Acceptable Solution
Noosa Medihub Lot 22
10 March 2022
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
Maintenance of environmental values and water quality objectives
PO1 AO1.1 Development complies with the requirements of the
Downstream ecosystems, properties and Development meets the applicable performance state planning policy for pollutant load reductions
infrastructure are not adversely impacted by either outcomes of the State Planning
changes to flow, water quality or ecosystem health Policy Appendix 2 SPP Code: Water
caused by development.
Quality;
AND
AO1.2 Design and construction methods for the treatment
Design and construction methods for stormwater quality basins will comply where possible
treatment assets are in accordance with Healthy
Waterways Water By Design Guidelines;
AND
AO1.3 Development will comply
Commitments are made to implement a cost effective
maintenance strategy for the life cycle of any engineered
water quality
treatment device;
AND
AO1.4 Water quality modelling is undertaken in
Water quality nutrient load modelling is undertaken in accordance with the Water by Design guides
accordance with Water by Design Music Modelling
Guidelines to demonstrate compliance with the SPP
nutrient reduction requirements;
AND
l:\8000-8999\8600-8699\8662\codes\10-03-22 water sensitive design code.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.