MCU21/0110 - Energex Referral Response - 61 Noosa Springs Drive_ Noosa Heads
4
• Access to the easement and access along the easement must be available to Energex
personnel and heavy equipment at all times. Energex will require the Developer / owner to
supply and install gates where fencing prohibits access to and along the easement area.
To enable travel along the easement at anytime the gates must be series locked with an
Energex padlock. Both the padlock and a design drawing of an acceptable gate will be
provided by Energex.
• Any costs or damages incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.
• Landscaping on the easement is generally not permitted.
Reference: 16410049-16401390
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
[OCR of page images]
e Access to the easement and access along the easement must be available to Energex
personnel and heavy equipment at all times. Energex will require the Developer / owner to
supply and install gates where fencing prohibits access to and along the easement area.
To enable travel along the easement at anytime the gates must be series locked with an
Energex padlock. Both the padlock and a design drawing of an acceptable gate will be
provided by Energex.
e Any costs or damages incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.
e Landscaping on the easement is generally not permitted.
Reference: 16410049-16401390
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.