PROPOSED SITE ENHANCEMENTS
STORMWATER WATER MANAGEMENT PLAN
VERSION 0
FOR
NOOSA CHURCH
202 EUMUNDI NOOSA RD NOOSAVILLE
SEPTEMBER 2022
SW
SW
Propert
y bounda
ry
SW
RW
RW
164 464
RW
RW
RW
Existing
RW
RW
Structure
RW
RW
to remain s
112 693
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
ry
y bounda
RW
72 046
Propert
RW
RW
Paint Mark
T
Paint Mark
T
E
E
(0.79m Deep)
(0.66m Deep)
T
E
ry
T
E
y bounda
T
E
T
E
T
E
T
E
Propert
T
E
Paint Mark
T
E
Paint Mark
T
E
(1.30m Deep)
(0.74m Deep) 45 000
Lease bou
Existing CONC CD CD ndary
Carpark SLAB
1 to remain
Paint Mark Paint Mark
P
SP147056 (0.98m Deep) (0.79m Deep) P
CONC
RETE AT
SLAB
AT
PO
CD
Paint Mark
(0.86m Deep) Paint Mark
RETE
(0.46m Deep) P
P
CD
308
SLAB
Paint Mark
CONC
(0.64m Deep)
35 000
Paint Mark
(0.41m Deep)
SP173984
Paint Mark CD
(1.09m Deep)
P
Paint Mark
PP
22 (0.43m Deep)
40 Paint Mark Paint Mark
CD
7 (1.07m Deep) (0.89m Deep) SI
Paint Mark
CD CONC
Paint Mark Paint Mark SLAB
(1.07m Deep)
Paint Mark BITUMEN Paint Mark
E
E
(0.86m Deep) CD
E
(0.64m Deep) E
E
Paint Mark Paint Mark
E
E Paint Mark
E
E
Paint Mark (0.51m Deep) Paint Mark
(0.56m Deep) (0.94m Deep) Paint Mark
35 000 E CD
Paint Mark
CD
Paint Mark Paint Mark
(0.53m Deep)
9 633
Concrete
Paint Mark CD CONC
RETE
Paint Mark CD SLAB
10 000
P
P
P
30 671 P
SC
P
306
(0.60m Deep) SP173984
Park
Paint Mark
TE
PP
BM: NAIL IN BITUMEN
RL: 19.96
BITUMEN
X
IL:19.1 5
K
GU ERB
IL:19.71 0.35m RCP TT &
ER
SH
KERB & SH
GUTTER
EUMU
20
.2
3
NDI
NOOSA
Callaghan & Toth ROAD
Civil, Environmental &
Hydraulic Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 18 pages
Page 2
Callaghan & Toth
DOCUMENT HISTORY
Document Reference: No: 2227 SWQMP_Rev0.doc
Project Manager: Bradley Voigt
Author: Monte Plasman
Client: Noosa Church
Contact Person: Bradley Voigt
DISTRIBUTION LIST
POSITION ON
NAME ORGANISATION MANAGEMENT REVISION REVISION REVISION REVISION
TEAM 0 1 2 3
Bradley Voigt Noosa Church Client 1
Lex Toth Callaghan & Toth Author 1
Mark Lewis Noosa Council Assessment Officer 1
REVISION LIST
REVISION DATE DISTRIBUTED ISSUED BY CHECKED BY
0 12 September 2022 Monte Plasman Lex Toth
The information contained in this report is confidential and proprietary to Callaghan & Toth Civil,
Environmental & Hydraulic Engineers. It may only be used by the person to whom it is provided,
for the stated purpose for which it is provided, and must not be imparted to any third person
without the prior written approval of Callaghan & Toth. Callaghan & Toth reserves all legal rights
and remedies in relation to infringement of its rights in respect of its confidential information.
©
Callaghan & Toth
2022
2227 SWMP_Rev0.docx September 2022 2
2227
Page 3
Callaghan & Toth
CONTENTS
1. INTRODUCTION................................................................................................. 4
1.1 Response to Conditions of Approval ......................................................................... 4
2. DESCRIPTION.................................................................................................... 4
3. FLOODING ......................................................................................................... 5
4. STORMWATER DESIGN AND ASSESSMENT ................................................. 8
4.1 Proposed On-Site Stormwater Treatment Process ..................................................... 8
4.1.1 Rainfall Data ........................................................................................................ 8
4.2 HYDROLOGY .......................................................................................................... 8
CONCLUSIONS ....................................................................................................... 10
APPENIDX 1: Detention Calculation Results ....................................................... 11
LIST OF REFERENCES
1. Engineers Australia (2006) Australian Runoff Quality. Australian Runoff Quality
Guidelines.
2. Healthy Waterways (2006) Water Sensitive Urban Design Technical Design
Guidelines for Southeast Queensland
3. Water by Design, Deemed to Comply Solutions – Stormwater Quality Management
(Southeast Queensland), May 2010
4. QUDM (Queensland Urban Drainage Manual 2016)
5. AS/NZS 3500.3.2003 Stormwater Drainage
6.
LIST OF FIGURES
Figure 1.1 Proposed Lot Layout & Catchment 6
Figure 1.2 Proposed Stormwater Management Plan 7
Figure 4.2 Proposed Detention/Reuse Tank 9
LIST OF TABLES
Table 1.1 Response to Pre-Lodgement Notes 5
2227 SWMP_Rev0.docx September 2022 3
2227
Page 4
Callaghan & Toth
1. INTRODUCTION
The site subject to this report is at No.202 Eumundi Noosa Rd Noosaville. One existing shed
on the lot will be removed and replaced by a larger shed and will feature a new concrete
hardstand area and short section of road to link carpark areas. As well, an existing church
building will be upgraded to feature a new entry foyer and covered barbeque area.
The stormwater management assessment undertaken on this project considers the increase
in impervious area of the lot due to the proposed shed and hardstand area. Then, it
determines which measures can be incorporated into the design to attenuate the resultant
increase in runoff back to predevelopment levels. The new entry foyer and barbeque area
will capture stormwater and be directed to the existing site drainage system.
The existing shed catchment drains to Satinwood St before discharging to Lake Doonella
Bushland Reserve. The existing church building catchment drains to Ferntree Ct before
discharging to a portion of Lake Doonella Park.
The existing shed and church building site currently drain to Satinwood St and Ferntree Ct,
respectively, as shown on Figure 1.1. The proposed new drainage system will replicate the
existing catchment.
1.1 Response to Conditions of Approval
TABLE 1.1: Response to Pre-Lodgement Notes
Item CONDITION RESPONSE
Mark Lewis -1 The proposed shed and associated hardstand areas Details shown on Figure
will most likely increase stormwater runoff from the 1.2
site. Any application will need to include a stormwater
management plan prepared by a suitably qualified
person. The SWMP must demonstrate that the
development will not cause a downstream worsening
for other properties and that the downstream drainage
system has the capacity to cater for the runoff.
Runoff from the other smaller additions to the
buildings will need to be directed to the existing site
drainage system.
2. DESCRIPTION
The site is on a 19,841 m2 parcel of land which has frontage to Eumundi Noosa Rd. Onsite
drainage in the westerly portion of the lot discharges to an underground DN450 stormwater
system on Satinwood St controlled by Noosa Council. Onsite drainage in the central portion
of the lot discharges to an underground DN300 stormwater system on Ferntree Ct controlled
by Noosa Council. Onsite drainage in the eastern portion of the lot discharges to an
underground DN300 stormwater system that flows towards Silkwood Dr and is controlled by
Noosa Council
2227 SWMP_Rev0.docx September 2022 4
2227
Page 5
Callaghan & Toth
3. FLOODING
The existing shed drains toward Satinwood St and the Lake Doonella Bushland Reserve.
The downpipes discharge into a grassed open channel along the westerly boundary of the
lot.
The existing church building drains toward Ferntree Ct. The downpipes discharge to a pit
before entering the DN300 pipe on Ferntree.
The runoff from Eumundi Noosa Rd is collected in kerb and channel and a culvert under the
driveway. The whole lot is above flood levels.
2227 SWMP_Rev0.docx September 2022 5
2227
Page 6
Callaghan & Toth
Civil, Environmental &
Hydraulic Engineers
TE
PP
IL:19.15
IL:19.71 0.35m RCP
19 19.8 .94
.8 1
5
19
Page 7
Callaghan & Toth
Civil, Environmental &
Hydraulic Engineers
[OCR of page images]
CONNECT NEW DOWNPIPES TO
NEW 7,000L RAINWATER TANK
EXISTING SHED TO
BE DEMOLISHED
/
/
/
NEW BBQ AREA ROOF TO DISCHARGE
ONTO EXISTING CHURCH ROOF
2
=
2
DN40 OUTLET AT 0.83m ABOVE |
BASE OF TANK TO NEW PIT 2
AND DN150 OUTLET AT 2.235m
ABOVE BASE OF TANK |
I 2
NEW 5,000L RAINWATER TANK |
2 =
é &
!
!
2
EXISTING —f |
GRASS SWALE o
i =
f !
}
y
|
y
|
y
|
g
i
y
i
4
|
y
|
y
[ase }
HF
CONNECT NEW ENTRY FOYER DOWNPIPES
TO EXISTING CHURCH DOWNPIPES,
ri _-{EX. DN450 SW REPLACE EXISTING FLAT GRATED * >
COVER WITH DOMED GRATED COVER P EX. DN300 SW Callaghan & Toth
3
DN150 DISCHARGE OUT OF NEW PIT 3 nee Eavironmental &
ow INTO EXISTING GRASS SWALE / ENSURE EXISTING DOWNPIPES DISCHARGE yaraulic Engineers
UNDERGROUND TO EXISTING PIT PO BOX 2305
600x600 SW PIT WITH CLASS B 2 eo ale 888
Sy GRATED COVER 1.16/90 Goodchap Street
2 SY prone 54749081, Fox 54749041
\ DNGO OUTLET AT 0.83m ABOVE [ota www.callaghanandtoth.com.au
BASE OF TANK TO NEW PIT oe designed [ADT] dolum AND DERIVED
AND DN150 OUTLET AT 2.235m | | ea x drawn] ST
ee & PSM *
ABOVE BASE OF TANK >| / N checked | ADT | Origin (BM.) RL *
E approved
SURVEYED BY
xX
PHONE (07) Xx
project
HED & INSTALL AWNINGS
Client
JOSH USHER NOOSA CHURCH
BRADLEY VOIGT NOOSA CHURCH
——_
0
title
STORMWATER MANAGEMENT
DETAIL PLAN
a
_———————————
202 EUMUNDI NOOSA RD
Parish of TEWANTIN
County of MARCH
SUNSHINE COAST REGIONAL
COUNCIL
0 2.5 5 Meters 12.5
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
4:250 (A3) 00_NOT SCALE FROM THIS DRAWING
\S7 USE ONLY DIMENSIONS PROVIDED
REVISIONS
revision details
A | FOR APPROVAL
NEW CoNcRI
ETE
i HARDSTAND :
\
'
¥ \
\ \
~~ | ‘ 2
& \
\ \ ae FILES
\ ‘ TO ep (COMPUTER DIRECTORY
INSTALL DN375 CULVERT | 4 ‘ PP X:\JOBS\CT\...
WITH PRECAST HEADWALLS \ \ i
Rw.
\ \ N Ry
4 \ ll ! ll
i \
\ 4 q
A \ | CONNECT NEW ENTRY Sheet_2_of_2_ sheets
/ 4 4 FOYER DOWNPIPES TO drawing number
! \ \ EXISTING CHURCH
; y \ \ A i DOWNPIPES FIG 1 . 2
A
STORMWATER MANAGEMENT DETAIL PLAN — ENTRY FOYER AND BBQ AREAS — EAST LY date SEPTEMBER 2022 S/S
STORMWATER MANAGEMENT DETAIL PLAN — SHED AND HARDSTAND AREAS — WEST
Page 8
Callaghan & Toth
4. STORMWATER DESIGN AND ASSESSMENT
4.1 Proposed On-Site Stormwater Treatment Process
The developed site was divided into a Sub-Catchment to show the proposed areas for
detention as shown on Figure 1.1 and the detention system is listed below:
1. Above ground rainwater tanks will be required to collect water for stormwater detention
purposes from the shed roof area. A total of two (2) 5,000L tanks (1.8m diameter x
2.32m high manufactured dimensions) will be provided for the new shed. The tanks will
discharge through a 40mm diameter orifice at a height of 0.83m above the invert of the
tank and a 150mm diameter overflow pipe at the top of the tank. The depth below the
orifice outlet will be used for toilet reuse. The total combined tank capacity is to be 7,000
litres and is adequate for the approximate attenuation of runoff back to pre-development
concentrations for AEP1%, 10%, 50%. See Figure 4.2 on page 9 for a detail of the
proposed rainwater tank setup.
2. The underground drainage system is designed to convey a 20% AEP event for both the
new shed/hardstand area as well as the new entry foyer/barbeque area. An overland
flow path has been provided to convey larger events.
4.1.1 Rainfall Data
The meteorological data used for the BOM IFD table for Noosaville was used for the runoff
calculations
4.2 HYDROLOGY
The site has been modelled using HydroCAD 10 to determine the detention capabilities of the
rainwater tank.
The aboveground rainwater tank adopted has been sized so that runoff concentrations are
reduced back to predevelopment levels as shown in our calculations in Appendix 1.
As the existing runoff and catchment extents to Satinwood St is not to be affected by this
development, there will be no change to the capacity of drainage to Satinwood St and the
Lake Doonella Bushland Reserve outlet.
2227 SWMP_Rev0.docx September 2022 8
2227
Page 9
Callaghan & Toth Civil, Environmental & Hydraulic Engineers [OCR of page images] ON150 OVERFLOW PIPE TO GULLY PIT ROOFWATER DOWNPIPES ON40 OUTLET TO § GULLY PIT 3,500L STORMWATER DETENTION 2.235m = 1.405m 0.83m 1,500L TOILET WATER STORAGE FIRST FLUSH DIVERTER 5,000L TANK (ASSUME TANK IS 1.8m DIAMETER x 2.32m HIGH) project Callaghan & Toth | PROPOSED NOOSA CHURCH UPGRADES Civil, Environmental & location Hydraulic Engineers 202 EUMUNDI NOOSA RD NOOSAVILLE 1.16/90 GOODCHAP STREET NOOSAVILLE 4566 | Ph: 54749081 Fax: 54749041 www.callaghanandtoth.com.au — TYPICAL DETENTION/REUSE TANK Figure 4.2 Scale: NTS
Page 10
Callaghan & Toth
CONCLUSIONS
The aboveground rainwater tanks are able to attenuate the runoff concentrations back to
pre-development levels and so the development will not have an impact on the hydrology of
the existing system.
The internal drainage system has been designed to carry the 20% AEP for both the new
shed/hardstand area and the extensions to the church building.
2227 SWMP_Rev0.docx September 2022 10
2227
Page 11
Callaghan & Toth
APPENIDX 1: Detention Calculation Results
202 Eumundi Noosa Rd Noosaville
Summary of Calculations:
Pre-Development Case
610m² Catchment
tc = 6 min., C=0.98, 0.70
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20
Q1% flow = 0.04351 m³/s
Q10% flow = 0.02572 m³/s
Q50% flow = 0.01638 m³/s
Post-Development Case (With Detention)
610m² Catchment
tc = 6 min., C=0.98
Cf50%=0.85, Cf10%=1.00, Cf1%=1.20
Q1% flow = 0.02615 m³/s
Q10% flow = 0.0116 m³/s
Q50% flow = 0.0084 m³/s
2227 SWMP_Rev0.docx September 2022 11
2227
Page 12
2S
Existing shed and
asphalt carpark 4R
DN450 SW Pipe
1S
Existing Equivalent
Landscape
Subcat Reach Pond Link Routing Diagram for PRE DEVELOPMENT
Prepared by HP Inc., Printed 2/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC
Page 13
PRE DEVELOPMENT noosa 2-Year Duration=6 min, Inten=153.3 mm/hr
Prepared by HP Inc. Printed 2/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=509.0 m² 0.00% Impervious Runoff Depth=12 mm
Tc=6.0 min C=0.59 Runoff=0.01280 m³/s 0.006 Ml
Subcatchment 2S: Existing shed and Runoff Area=101.0 m² 0.00% Impervious Runoff Depth=17 mm
Tc=6.0 min C=0.83 Runoff=0.00357 m³/s 0.002 Ml
Reach 4R: DN450 SW Pipe Inflow=0.01638 m³/s 0.008 Ml
Outflow=0.01638 m³/s 0.008 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.008 Ml Average Runoff Depth = 13 mm
100.00% Pervious = 0.0610 ha 0.00% Impervious = 0.0000 ha
Page 14
PRE DEVELOPMENT noosa 10-Year Duration=6 min, Inten=203.1 mm/hr
Prepared by HP Inc. Printed 31/08/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=509.0 m² 0.00% Impervious Runoff Depth=19 mm
Tc=6.0 min C=0.70 Runoff=0.02013 m³/s 0.010 Ml
Subcatchment 2S: Existing shed and Runoff Area=101.0 m² 100.00% Impervious Runoff Depth=27 mm
Tc=6.0 min C=1.00 Runoff=0.00570 m³/s 0.003 Ml
Reach 4R: DN450 SW Pipe Inflow=0.02583 m³/s 0.013 Ml
Outflow=0.02583 m³/s 0.013 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.013 Ml Average Runoff Depth = 21 mm
83.44% Pervious = 0.0509 ha 16.56% Impervious = 0.0101 ha
Page 15
PRE DEVELOPMENT noosa 100-Year Duration=6 min, Inten=295.9 mm/hr, Cf=1.20
Prepared by HP Inc. Printed 31/08/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=509.0 m² 0.00% Impervious Runoff Depth=34 mm
Tc=6.0 min Frequency Adjusted C=0.84 Runoff=0.03519 m³/s 0.017 Ml
Subcatchment 2S: Existing shed and Runoff Area=101.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min C=1.00 Runoff=0.00831 m³/s 0.004 Ml
Reach 4R: DN450 SW Pipe Inflow=0.04351 m³/s 0.021 Ml
Outflow=0.04351 m³/s 0.021 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.021 Ml Average Runoff Depth = 35 mm
83.44% Pervious = 0.0509 ha 16.56% Impervious = 0.0101 ha
Page 16
3L 1P
2S
(new Link) 2 x 5,000L Tanks - West
New Shed
4R
DN450 SW Pipe
4S
New Concrete
Hardstand
7S
New Road Extension
Subcat Reach Pond Link Routing Diagram for POST DEVELOPMENT 2 tanks
Prepared by HP Inc., Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC
Page 17
POST DEVELOPMENT 2 tanks noosa 2-Year Duration=6 min, Inten=153.3 mm/hr
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=20 mm
Tc=6.0 min C=0.98 Runoff=0.01880 m³/s 0.009 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=20 mm
Tc=6.0 min C=0.98 Runoff=0.00501 m³/s 0.002 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=19 mm
Tc=6.0 min C=0.90 Runoff=0.00153 m³/s 0.001 Ml
Reach 4R: DN450 SW Pipe Inflow=0.00836 m³/s 0.008 Ml
Outflow=0.00836 m³/s 0.008 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=15.904 m Storage=7.1 m³ Inflow=0.01880 m³/s 0.009 Ml
Outflow=0.00497 m³/s 0.005 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.01880 m³/s 0.009 Ml
Primary=0.01880 m³/s 0.009 Ml Secondary=0.00000 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.012 Ml Average Runoff Depth = 20 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
Page 18
POST DEVELOPMENT 2 tanks noosa 10-Year Duration=6 min, Inten=203.1 mm/hr
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=27 mm
Tc=6.0 min C=0.98 Runoff=0.02491 m³/s 0.012 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=27 mm
Tc=6.0 min C=0.98 Runoff=0.00664 m³/s 0.003 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=25 mm
Tc=6.0 min C=0.90 Runoff=0.00203 m³/s 0.001 Ml
Reach 4R: DN450 SW Pipe Inflow=0.01159 m³/s 0.012 Ml
Outflow=0.01159 m³/s 0.012 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=16.305 m Storage=9.2 m³ Inflow=0.02491 m³/s 0.012 Ml
Outflow=0.00653 m³/s 0.008 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.02491 m³/s 0.012 Ml
Primary=0.02491 m³/s 0.012 Ml Secondary=0.00000 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.016 Ml Average Runoff Depth = 27 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
Page 19
POST DEVELOPMENT 2 tan noosa 100-Year Duration=6 min, Inten=295.9 mm/hr, Cf=1.20
Prepared by HP Inc. Printed 12/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 6
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Muskingum-Cunge method - Pond routing by Stor-Ind method
Subcatchment 2S: New Shed Runoff Area=450.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.03704 m³/s 0.018 Ml
Subcatchment 4S: New Concrete Runoff Area=120.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.00988 m³/s 0.005 Ml
Subcatchment 7S: New Road Extension Runoff Area=40.0 m² 0.00% Impervious Runoff Depth=40 mm
Tc=6.0 min Frequency Adjusted C=1.00 Runoff=0.00329 m³/s 0.002 Ml
Reach 4R: DN450 SW Pipe Inflow=0.02615 m³/s 0.020 Ml
Outflow=0.02615 m³/s 0.020 Ml
Pond 1P: 2 x 5,000L Tanks - West Peak Elev=16.820 m Storage=11.8 m³ Inflow=0.03100 m³/s 0.017 Ml
Outflow=0.01944 m³/s 0.013 Ml
Link 3L: (new Link) below 0.03100 m³/s Inflow=0.03704 m³/s 0.018 Ml
Primary=0.03100 m³/s 0.017 Ml Secondary=0.00604 m³/s 0.000 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.024 Ml Average Runoff Depth = 40 mm
6.56% Pervious = 0.0040 ha 93.44% Impervious = 0.0570 ha
Used in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.