Attachment 2 - Stormwater Management Plan · 131998.981126.5
Plans and drawings: the text below has words only, no drawings.
PRE DEVELOPMENT noosa 2-Year Duration=6 min, Inten=153.3 mm/hr
Prepared by HP Inc. Printed 2/09/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=509.0 m² 0.00% Impervious Runoff Depth=12 mm
Tc=6.0 min C=0.59 Runoff=0.01280 m³/s 0.006 Ml
Subcatchment 2S: Existing shed and Runoff Area=101.0 m² 0.00% Impervious Runoff Depth=17 mm
Tc=6.0 min C=0.83 Runoff=0.00357 m³/s 0.002 Ml
Reach 4R: DN450 SW Pipe Inflow=0.01638 m³/s 0.008 Ml
Outflow=0.01638 m³/s 0.008 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.008 Ml Average Runoff Depth = 13 mm
100.00% Pervious = 0.0610 ha 0.00% Impervious = 0.0000 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.