PRE DEVELOPMENT noosa 100-Year Duration=6 min, Inten=295.9 mm/hr, Cf=1.20
Prepared by HP Inc. Printed 31/08/2022
HydroCAD® 10.00-26 s/n 05328 © 2020 HydroCAD Software Solutions LLC Page 5
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing Equivalent Runoff Area=509.0 m² 0.00% Impervious Runoff Depth=34 mm
Tc=6.0 min Frequency Adjusted C=0.84 Runoff=0.03519 m³/s 0.017 Ml
Subcatchment 2S: Existing shed and Runoff Area=101.0 m² 100.00% Impervious Runoff Depth=40 mm
Tc=6.0 min C=1.00 Runoff=0.00831 m³/s 0.004 Ml
Reach 4R: DN450 SW Pipe Inflow=0.04351 m³/s 0.021 Ml
Outflow=0.04351 m³/s 0.021 Ml
Total Runoff Area = 0.0610 ha Runoff Volume = 0.021 Ml Average Runoff Depth = 35 mm
83.44% Pervious = 0.0509 ha 16.56% Impervious = 0.0101 ha
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.