Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

EGX_PROD_n6923390_191_Hollett_Road,_Noosaville_L53_SP163571

Attached to the e-mail Amended Energex Response (23.4.20) - 152006.1999.4.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

        J&P Richardson Industries Pty Ltd        -5-


        A margin of 20% should be added to the above values to allow for system load growth.
        Final currents are 63A and 61A for F790 and F7298 respectively.
        The range of variation in load over a typical summer day for 132kV F790 is shown in Figure
        3 below.

        Figure 3       F790 Daily Load curve 21/1/2020




                                                                                   AVE = 75.4




2.4     Scenarios for future development

2.4.1   Network connections
        There is no indication that the circuit connections at 132kV (or 11kV feeders out of SSNVL)
        are planned to be altered in the foreseeable future.

2.4.2   Load criteria
        Magnetic field studies will be based on an average load calculation for each circuit (24hr
        365day). An escalation of 20% has been applied to the average present day load to
        account for future load growth.




        Hollett Road EMF Study                                                        V1.0
Log in to download the original file

EGX_PROD_n6923390_191_Hollett_Road,_Noosaville_L53_SP163571.pdf · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.