Original source · versioned page text
EGX_PROD_n6923390_191_Hollett_Road,_Noosaville_L53_SP163571
Attached to the e-mail Amended Energex Response (23.4.20) - 152006.1999.4.
2
Application Material Assessed
Title Plan Number Rev Date
Reconfiguration Plan M1775-13F F 26 March 2020
Sheet 1 of 6
Plan of Development M1175-13 F 26 March 2020
Sheet 2 of 6
Powerline Ground Clearance M1775-20 A 29 January 2020
Electromagnetic Field Assessment, - V1.0 27 March 2020
prepared by J&P Richardson Industries
and certified by Steven Flower RPEQ
The Applicant is also advised the following in relation to the development:
1. The conditions of any easements in favour of Energex must be maintained at all
times.
2. Any future development proposed on the easement, including works associated
with the new road, pedestrian/cyclist connections and/or other services connections
must have prior approval from Energex.
Prior to works commencing, the Applicant/Developer is to submit RPEQ certified
drawings to Energex, having regard to any existing electrical assets in the vicinity of
the proposed works.
Note: where relevant, this may be satisfied by referring to Energex any future
development application/s for Operational Work, in accordance with the
requirements of the Planning Regulation 2017.
3. Lighting structures are not permitted in the easement without prior written consent
of Energex. Lighting designs for proposed developments (e.g. road, carparks etc)
on the easement are likely to require reduced height structures. Please submit
detailed design to Energex for approval. These drawings must clearly show the
following:
Proposed height of the lighting structures and the ground level at the structure
base;
Relative (to lighting structures) ground levels at Energex structures (towers,
pole etc) either side of the lighting structures; and
The location of the Energex structures in relation to the proposed lighting.
4. No planting is permitted in the Easement without prior approval from Energex. If
planting is proposed, the applicant is required to provide a Detailed Landscape
Plan to Energex for approval which:
Keeps the planting of trees to the outer most edge of the easement and not
directly under any overhead conductors;
Plots the location of the overhead conductors (accounting for a cross-arm if
applicable and plotting the powerline on the outmost edge of each side of the
cross-arm);
Reference: HBD 6923390
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.