Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU23/0090.02 - APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL FOR MATERIAL CHANGE OF USE - HOTEL (EXTENSION TO EXISTING HOTEL) AND DBW23/0073.02 BUILDING WORK (DEMOLITION) AT 118 POINCIANA AVENUE AND 26 DIYAN STREET, TEWANTIN (Item 7.1 Referred from Planning & Environment Committee Meeting dated 11 November 2025) · Report

of 3

Page text shows just the words. Original shows the document exactly as it was published.

GENERAL COMMITTEE MEETING                                                    17 NOVEMBER 2025


b. Condition 42(f). The proposed End of Trip Facilities are required to encourage users of the site
   including employees to access the site by alternative transport modes. The absence of EOT
   facilities in the existing hotel does not justify non-compliance in the proposed expansion. Staff
   may work across varied shifts, and facilities such as a shower and secure locker may improve
   staff ability to utilise alternative transport.
F. Note the report is provided in accordance with Section 83(9) of the Planning Act 2016.
Log in to download the original file

Report.pdf · 84 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.