Council archive · source document
Geotech Inestigation · MCU22/0192
This footing is founded above the critical depth 4 _ Ground/pad level ee a | | unstable line and is deemed to eel [ —j be unstable. Ng, Lie, Voy, stable NG i Le Piers must be excavated to below the critical depth N line to provide stability to these footings. th This footing is founded below critical line and Any proposed or existing excavation. The builder must ensure all excavations are discovered and the footing and slab is secured below the critical line accordingly. This should include a search of all council & other records for as constructed plans to establish excavation depths & widths. Yo is stable ZN... ~“., “. a i‘ Q 30 degrees ., se TRS Ts Horizontal (“6ferelay) N.S E S Critical Depth line measured from deepest In the case of a buried pipe the point of the excavation nearest the footing. invert level is usually above and away from the nearest corner of the excavation. Critical Depth Line X Unearthed Geotechnical P/L. 6 Site Investigation Report 022-164
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Inestigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.