Geotech Inestigation · MCU22/0192

of 11

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

This footing is founded
above the critical depth

4 _
Ground/pad level ee

a
| |

 

unstable line and is deemed to
eel [ —j be unstable.
Ng,
Lie,
Voy,
stable NG i
Le Piers must be excavated

to below the critical depth
N line to provide stability to
these footings.

th

This footing is founded
below critical line and

 

 

 

Any proposed or existing excavation. The
builder must ensure all excavations are
discovered and the footing and slab is
secured below the critical line accordingly.
This should include a search of all council
& other records for as constructed plans to
establish excavation depths & widths.

Yo

 

 

 

 

 

 

 

is stable
ZN...
~“.,
“.
a
i‘ Q
30 degrees .,
se TRS Ts
Horizontal (“6ferelay) N.S E
S
Critical Depth line measured from deepest In the case of a buried pipe the
point of the excavation nearest the footing. invert level is usually above and
away from the nearest corner
of the excavation.
Critical Depth Line
X
Unearthed Geotechnical P/L. 6 Site Investigation Report 022-164

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Geotech Inestigation.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.