response to further advice
B99 vehicle (as described in AS/NZs2890.1:2004) will not scrap or
bottom out on either the road formation or the driveway when entering
and exiting the site.
Provide a preliminary stormwater design for the proposed development.
The design must be prepared by a suitably qualified person (Registered
Professional Engineer of Queensland or Drainage consultant.
Detailed driveway plans are provided by Recor Engineers showing a longtitudinal section
for a B99 vehicle and no requirements for earthworks within the road reserve.
Figure.4 Driveway Layout
The development is for a single dwelling house and the site slopes towards the street and
the existing stormwater pit in front of the site. Further stormwater details will be provided
as part of the building approval.
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. It is therefore requested that Council proceed with its
assessment of the development application at their earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago
Planner/Director
Pivotal Perspective Pty Ltd
Page 3 of 3