Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Form 15 - Noosa Jetty - 7550E 105 Shorehaven Dr · OPW19/0185

Attached to the e-mail Operational Works Application OPW19/0185 - DA Form 1 - Form 15 - Plans - 105 Shorehaven Dr, Noosaville.

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   

of) Queensland
I Government

Department of Housing and Public Works

Form 15—Compliance certificate
for building design or
specification

Version 4 — July 2017

 

NOTE: This is to be used for the purposes of section 10 of the Building Act 1975 and/or section 46 of the

Building Regulation 2006.

RESTRICTION: A building certifier (class B) can only give a compliance certificate about whether building work
complies with the BCA or a provision of the Queensland Development Code (QDC). A building certifier (Class B)
can not give a certificate regarding QDC boundary clearance and site cover provisions.

1.Property description

This section need only be
completed if details of street
address and property description
are applicable.

E.g. in the case of
(standard/generic) pool design/shell
manufacture and/or patio and
carport systems this section may
not be applicable.
The description must identify all
land the subject of the application.
The lot and plan details (e.g.
SP/RP) are shown on title
documents or a rates notice.
If the plan is not registered by title,
provide previous lot and plan
details.
2.Description of
components certified
Clearly describe the extent of work
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.

Street address (include no., street, suburb/locality and postcode)

 

105 Shorehaven Dr

 

Noosaville QLD Postcode 4566

 

Lot and plan details (attach list if necessary)

 

Lot 679 on RP897352

 

In which local government area is the land situated?

 

Noosa Council

 

 

 

 

New timber jetty for 105 Shorehaven Dr, including hardwood timber piles and

 

framing.

 

Excludes:

Tie-up rails, boatlift and proprietary decking (by others)

Methods of construction including temporary bracing and propping
Existing structures on the site, including the existing revetment wall
Jetty is to be built independently of all existing structures on the site

 

 

 

 

 

 

3.Basis of certification

Detail the basis for giving the
certificate and the extent to which
tests, specifications, rules,

standards, codes of practice and other
publications, were relied upon.

 

AS1170 SAA Loading Code
AS1720 Timber Structures
AS2159 Piling Code
AS4100 Steel Structures

 

 

 

 

 

 

 

4.Reference documentation
Clearly identify any relevant
documentation, e.g. numbered
structural engineering plans.

 

 

Black & More structural engineering drawings 7550E-S001-S008

 

(Construction Issue)

 

 

 

 

 

 

 

 

 

Date received

Reference Number/s

 
Full text of the other 1 page

Page 2

 

5. Building certifier reference
number

Building certifier reference number

 

 

 

 

 

6. Competent person details
A competent person for building work,
means a person who is assessed by
the building certifier for the work as

Name (in full)
Freeman McGrath

Company name (if applicable) Contact person

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

competent to practice in an aspect of
the building and specification design, | Black & More ‘| | Freeman McGrath
of the building work because of the ; ;
individual's Sci experience and Phone no. (business hours) Mobile no. Fax no.
qualifications in the aspect. The | 07 5447 4444 0414 681 676 |
competent person must also be =
registered or licensed under a law Email address
applying in the State to practice the [email protected]
aspect.
If no relevant law requires the Postal address
individual to be licensed or registered PO Box 611
to be able to give the help, the certifier
must assess the individual as having Noosa Heads QLD Postcode 4567
appropriate experience, qualifications . ; :
or skills to be able to give the help. Licence or registration number (if applicable)
If the chief executive issues any RPEQ 19951
guidelines for assessing a competent
person, the building certifier must use
the guidelines when assessing the
person.
7.Signature of competent Signature DY) Date
person TYP 31 July 2019
This certificate must be signed by the =

individual assessed by the building
certifier as competent.

 

 

 

 

 

 

Y/Y v

The Building Act 1975 is administered by the Department of Housing and Public Works

Used in these records

About this file

File size
844 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Form 15 - Noosa Jetty - 7550E 105 Shorehaven Dr.pdf · 844 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.