GENERAL COMMITTEE MEETING AGENDA 18 MARCH 2019
36. Speakers located in outdoor areas of the site must be selected to be low power,
installed as a distributed speaker system and controlled from a central volume control
unit accessible to staff only and fitted with an electronic noise limiter such that speakers
do not operate at noise levels which exceed 75 dB(C) at 3 metres from the source at
any time. Speakers must be located and oriented such that they are not be directed
towards off-site residential areas. There is to be no live entertainment on site.
52. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. the works shown on drawing number 17699-SK101 Revision A prepared by TOD
Engineers and Project Managers dated 17 August 2018, with the inclusion of the
following:
i. The storage tank must have sufficient capacity to cater for the runoff from
the driveway in a 5 minute 1%AEP rain event as a minimum.
ii. The basement structures (walls, floors and surfacing) must be constructed
of materials suitable for the potential inundation and all service connections
must be located a minimum of 300mm above the potential inundation level.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Consultation
External Consultation - Community & Stakeholder
MWA Environmental
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer x Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
x Waste & Environmental Health Revenue Services
Executive Services Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 5 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.