Original source · versioned page text
Appendix 2 - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
24.013 - PRELIMINARY
LEGEND - INTERNAL LEGEND - EXTERNAL # DATE DETAILS BY PROJECT DESCRIPTION: SITE ADDRESS:
B - BROOM CUPBOARD OHC - OVERHEAD CUPBOARD BV - BRICK VENEER SM - SCYON MATRIX PANELING
PRELIM 1 04/06/24 PRELIMINARY ISSUE DPC Perspectives 24.013 DESIGNED BY DPC
C'BD - CUPBOARD
DP - DOWNPIPE
PTY - PANTRY
R - ROBE
CJ - CONTROL JOINT
FC - FIBRE CEMENT SHEETING
SS - SCYON STRIA CLADDING
WB - HARDIES NEWPORT
PRELIM 2
PRELIM 3
17/06/24
02/09/24
PRELIMINARY ISSUE
PRELIMINARY ISSUE
DPC
DPC AUS MAR DRAWN BY DPC
DW - DISHWASHER PROV. REF - REFRIDGERATOR SPACE RH - RENDERED HEBEL PANELS CB - COLORBOND SHEETING
FW - FLOOR WASTE RH - RANGEHOOD RBB - RENDERED BLUEBOARD SCALE JOB CODE
HP - HOT PLATE SH - SHELF RB - RENDERED BRICKWORK CLIENT: po box 6384 p (07) 5442 6413
HWS - HOT WATER SYSTEM S-FW - SMARTWASTE RBL - RENDERED BLOCKWORK maroochydore f (07) 5450 6437
L - LINEN TR - TOWEL RAIL SA - SCYON AXON qld 4558 QBCC 1083000
MH - MANHOLE TRH - TOILET ROLL HOLDER SL - SCYON LINEA
MW - MICROWAVE PROV. WO - WALL OVEN WRITTEN DIMENSIONS TO TAKE
PRECEDENCE OVER SCALE
SHEET 0.001 OF
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.