Original source · versioned page text
Pt 1 26-02-27_Lot 2 Taylor Ct Cooroy_DA ISSUE A
Attached to the e-mail Fw_ Email 1 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS Pt 1.msg.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY
37 38 39 40 41 42 43 44
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
49 m2 50 m2 50 m2 50 m2 50 m2 50 m2 50 m2 50 m2
01 FLOOR PLAN - BUILDING D
- LEVEL 1 - PART 01 Scale @ A3 1:200
TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY TENANCY
44 45 46 47 48 49 50 51
MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ. MEZZ.
50 m2 50 m2 50 m2 50 m2 50 m2 50 m2 50 m2 50 m2
02 FLOOR PLAN - BUILDING D BUILDING D
- LEVEL 2 - PART 02 Scale @ A3 1:200 STAGE LEGEND
PART 01 PART 02
STAGE 1 BOUNDARY
STAGE 2 BOUNDARY
STAGE 3 BOUNDARY
STAGE 4 BOUNDARY
BUILDING B BUILDING C STAGE 5 BOUNDARY
NORTH
NOTE:-
END OF TRIP FACILITIES TO BE PROVIDED IN EACH TENANCY
REMI RAFTER
BUILDING A
LOT 18 TAYLOR COURT
COOROY
03 KEY PLAN ST DJ
- LEVEL 1 Scale @ A3 1:2500
As Indicated 03.12.25
2025-68 15
A 27.02.26 Preliminary DA Issue ST DJ DA DRAWINGS A
MATERIAL CHANGE OF USE FOR LOW IMPACT INDUSTRY AND
ANCILLARY TRANSPORT DEPOT (CONTRACTORS DEPOT)
GSPublisherVersion 463.0.97.0
FLOOR PLAN - BUIDING D _ LEVEL 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Pt 1 26-02-27_Lot 2 Taylor Ct Cooroy_DA ISSUE A.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.