CONSTRUCTION NOTES
GENERAL

| These drawings are to be read in canjunction with the architectural drawings,
site investigation report and ‘fications, any discrepancy must be referred to
the Engineer in writing. Dimensions are not to be obtrined by scaling the drawing

Z. Alterations to the building plattorm moisture conditions after the house ip
conpleted by way ot planting potentialy large trees nearby, excessive watering of
garden beds, or extensions atfect the stability of ‘the sla and/or tooting
system. Natural run-ott should be rected away trom the building area.

3. All work not othervise specitied is to be in accordance vith Appendix 4 to the
Standard Building Bylaws LIS and it’s Amendments.

FOUNDATIONS

| The proposed bul area should be stripped of dl surtace vegetation, Any
disturbed Sou is te backtilled in meres layers to obtain a unitorm field
density of 95% relative to Test El AS 1264 (Standard Compaction). The building
area grarular til is to be compacted in layers to the above density specitications,

2. All excavations are to be clean and tree of loose sell and water inmediately
prior to the pouring ot any concrete, The Engineer is to be notified it any rock is
encountered in the ‘tooting excavations, .

3. Footing excavations in reactive lexpansive) soils shoud not be lett open and
allowed to dehydrate or have stormeater in them for more than 24 hours, *

REINFORCED CONCRETE AND FOOTINGS AND SLAB FLOOR

L Al concrete work is to be in accordance vith ASD 3600 F'c at 28 days is to
be 20 MPa. All concrete greater than |OOnm. thick is to be mechanicaly compacted
Al reintorcement is to be m accordance with AS B02, AS 1303 and AS B04.

2. F = Fabric Mesh R = Plain Round Bar Y = Hot Roled Detormed Bar

1 ~ Gold-rolled wire.

3. Alll pipes cast in the oldb are to have texble verticd Joints or pase through
sleaves cast in the slab. Pipes through footings are to he at least SOnm trom the
reinforcement. No pipes are to pass through stittening beams under the sla Hor,

4, The moisture barrier is to be O.20mm. polythene lapped (50mm. and taped at
Joints with pressure sensitive tape.
2. Footing reintorcement end laps shall be SOOmm tor D, Y bars and trench mesh,

End laps and side laps of slab mesh shal consist of tro transverse wires trom each
sheet of mesh pls a 25mm. offset,

6. All reintorcement is to ke supported in an approved manner and fixed Firmly in
position prior to any concrete beng poured Slay reinforcement is to be ported on
6mm. high plastic chairs (UNO) at BCOnm, centres in both directions. Both edges
of slay mesh at laps are to be tied at BOOmm. centres,

REINFORCED CONCRETE MASONRY AND CLAY BRICKWORK

C
All concrete block masonry and clay brickwork is to be executedin accordance with the AS 3700
Masonry Gode,

2. All bricks are to be grade I2 (Fc 12 Mpa)

3. Mortar is to be mixed in the proportions of | part cement: O - 1Oth part lime: 3 parts sand and
and have a minimum compressive strength of I MPa when tested in accordance with AS 1475 Part |

4. All mortar tins and droppings are to be removed trom cavities to be grouted via cleanout biocke at
the bottom ot the walls.

3. Cover to reinforcement is to be a mirimm of 30mm, trom inside face of blocks.

6. Cavity arout is to be compacted 20 Mpa concrete vith a maximum clamp ot 1SOmm. and a maximum
aggregate size of \Omm,

SUSPENDED REINFORCED CONCRETE
L All concrete work is to be

in accordance with AS 3600 F'c at 26 days is to be 25 MPa for internal

concrete and 32 MPa tor external concrete. All concrete is to be mechanically compacted AN reinforcement

i> to be in accordance with AS B02, AS 603 and AS BO4.

2. F = Fabric Mesh Y = Hot-rolled Deformed Bar | = Gold-roled wire R= Plan Round Bar,

3. Reinforcement end lap shal be
laps of slab mesh shall consist of

4. Al reintorcement is to be supported in an
concrete being poured. Slay reintorcenent io to

‘oved manner and tixed fi
‘supported on hi

eee

in both directions. Both edges of slab mesh at laps are to be tied at E00mm centres,
5. Unless otherwise noted on the drawings the car cover to remtorcement shal be!

External Slabs 4Onm. (top)
30mm. (bottom)

External Columns 40mm.

internal Slabs ZOmm. (top)
30mm (bottom)

6 All formwork shal comply with AS BOF SAA Formwork Code

7. Reintorcement Layers:

Bottom Steel Bars marked 'A’ laid trot
Bars marked B" laid second
Top Steel Bare marked °C" laid third

Bars marked ‘D: bid last.

6. COR Hebel Masonry Walls
the Manufacturer's Technical Handbook (Edition 5).

STEELWORK

and Stairways are to be instaled in accordaxce with

| All workmanship and materias shall be in accordance with ASI250 and ASI.
Zz Welding ehall be performed by an experienced operator in accordance with ASIS54
2

Parts |
3. Steel shall be ordinary welddle steel to ASIZ04.
4. The Contractor shall

provide and leave in place until permanent bracing elements are

constructed both temporary oracing as is necessary to stabilise the structure during

erection

5, Except where shown otherwise welds to be Gmm, continuous tilet,
A ui inal thick
sede ieee ands

6. The ends of dl tubular members are to be
continuous fillet weld unless show otherwise.

7. All structurd steel shall be Grade 250 unless shor

shall be Grade C250. Circular hollow sections shal
165mm and Grade C350 tor other diameters,

U
4. Al bolts shall ke Type 4.5/2 unese noted otha ted
of strength Grade 4.6 contorning to ASM. Type 88 “i Fag
Aa 2s

str 66 coniorming to
pea li wrench to a “Smug-tight’ condition.

a
12, All vtructural otccwork shal be cleaned of scale on psa, Geos
ROZC, unless specitied otherwise. ie

ABR

6. All hollow sections shall conform with ASIC3. Sur bhannan,

300nm, tor YI2 bare and 700mm. tor Yio bers. End and side
two transverse wires from each sheet of mesh plus a

mm. offset,

position pri.
‘> at &0Onm. centres

to any

SHIRE OF NOOSA

sfion if any are approved subject to Compliance
with the requirement of the Pullding Act 1975 and current
nts to the Act, Council’s By-laws and any conditions

aaprovadalans and bullding permit.

¢ Grade 200 tor diameters
Inder no circumstai

m without

‘cial
Fi. eles

2. Type /2 bolting prosedure is tightening wi

fo Meseseuceret{ccsanssccenacsceeeeen

 Betore fabrication is commenced, the Gontractdér shal ipal Building s lep arawing:
to the Architect tor inspection Inspection does not jin sali

  
  

shop_coat-ot-

to
nices may the plan and specifications be
the, written approval of the Principal

Building Permit No, 28of7 =

ye tt
ie
5 a

Deion? 5

  
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IENSIONS. salsa? & 5
~ &,
Date Org. No. 5
JUNE, 1993 32 - V8 CONSTRUCTION NOTES CONSULTING ENGINEERING
Drawn Checked \> PROPOSED UNITS AT LOTS 255 & 256 CORNER BRYAN ST. B ACN. 010 822 830 79
Ss. ye nol ose Amonament a & SOLWAY DRIVE, SUNSHINE BEACH. P.O. Box 226, Coolum Beach 45

 

   

 

 

pnp
1 2

INCH

 
 

    

H
H

  

 

VLU UU
[YH 1]

Heep
9 10)

      

 
 

TOL
sil

yey!

 

yy!
1

   

ee be eee TL CROGCRAPHIC’
penny

nnnnenepeeeeeeep ep Np meynennenupany

iL
2

 

 

  

| APPLICATIONS |

 

 

 

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Building Plans 1_1 Solway Dr SUNSHINE BEACH - Ref - 785-93.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.