Original source · versioned page text
Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany.pdf
Sustainable Building Design Code
Table 9.4.6.3—Criteria for assessment
Performance outcomes Acceptable outcomes Response
Energy Efficiency
Complies with PO1
PO1 No acceptable outcome provided
The proposed includes appropriate sustainable
Development minimises energy consumption and
building measures where applicable.
the production of greenhouse gas emissions.
Water efficiency and stormwater management
Complies with AO2.1
PO2 AO2.1
The requirement to provide rain water storage can
Development maximises water efficiency If for accommodation activities, a minimum 3,000
form a condition of the development approval.
on site by incorporating rainwater collection and litres of rain water storage is provided
reuse measures for non-potable purposes such as per dwelling and reused for non-potable purposes
irrigation. and incorporated into a stormwater management
plan for the development.
Not applicable
AO2.2
The proposed development is for accommodation
With the exception of accommodation activities,
activities (dual occupancy).
rain water storage sufficient for the intended use
is captured and used on-site for non-potable
purposes and incorporated into a stormwater
management plan for the development.
Editor’s note—The Queensland Development
Code includes provisions for the installation of rain
water tanks and the reuse of stormwater.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.