Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Performance outcomes Acceptable outcomes Response
Editor’s note— PSP6 Engineering Design Standards -
Roads, drainage and earthworks provides guidance
on requirements for preparing an Erosion
Management Plan.
AO14.2 Complies with AO14.2
Construction works are designed and managed to The proposed development will comply with
restrict the extent of clearing and soil exposure to required standards regarding the construction
the minimum necessary for access, and safe and establishment of stormwater management
construction at any one time. systems where applicable.
AO14.3 Complies with AO14.3
For buildings: The proposed development will comply with
required standards regarding the construction
1. upstream runoff is diverted around
and establishment of stormwater management
the construction site;
systems where applicable.
2. sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains
and waterways , wetlands or drainage
lines either on or off the site; and
3. temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
4. localised erosion is avoided by
directing flow from downpipes over
non-erosive areas.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020