Original source · versioned page text
Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany
Existing Services Code
Table 9.4.3.3—Criteria for assessment
Performance outcomes Acceptable outcomes Response
Setbacks, easements and maintenance
PO1 No acceptable outcome provided Complies with PO1
Development near a stormwater drain, overland The proposed development will not adversely
flow path or associated structure does not— affect an existing stormwater drain, overland flow
path or associate structure.
1. adversely affect the function of the
service;
2. place an additional load on the
service; and
3. unduly increase future maintenance
costs.
PO2 AO2.1 Not applicable
Maintenance access is provided to all stormwater For trunk infrastructure, a registered easement in The proposed development is not required to
drains, overland flow paths and associated favour of Council is created over all underground provide trunk infrastructure.
structures. infrastructure located in private property.
AO2.2 Not applicable
The width of the easement required is in The proposed development is not required to
accordance with Council’s Planning Scheme provide an easement in favour of Council.
Policy PSP6 Engineering Design Standards – Roads,
drainage and earthworks.
AO2.3 Not applicable
The easement is centred over the centreline of the Where applicable, any easement will provided
infrastructure. over the centreline of infrastructure.
Development Application: 13 Eumundi Noosa Road, Noosaville Noosa Plan 2020: Amendment 1 Effective date: 25/09/2020
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.