Skip to the record
Every meeting, every word.

Original source · versioned page text

Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany.pdf

of 145

Page text read automatically using OCR, there may be inaccuracies

 Performance outcomes                                       Acceptable outcomes                                Response
 (b)    steps down slops or uses suspended floor an alternative to standard single or double storey
        construction, minimising cut or fill and construction to minimise building bulk and
        avoiding benching of the site.           benching of the sites.

                                                            Editor’s note- refer to Figure 6.9.1A and Figure
                                                            6.9.1B
                                                            AO23.3                                            Not applicable
                                                            The distance between the ground level and the The proposed development is not located on a
                                                            lowest part of the floor of the building does not sloping site.
                                                            exceed 3 metres.


Earthworks and drainage       Table 6.3.2.3 —Criteria for assessment (part)
 Performance outcomes                                       Acceptable outcomes                                Response

 Earthworks and drainage
 PO24                                                       AO24                                               Complies with AO24
 Filling and excavation for operational works do not        Filling and excavation for operational works is    The proposed development has been designed to
 direct, indirectly or cumulatively cause adverse           designed and constructed to ensure overland flow   ensure overland flow and flooding is not worsened,
 impacts external to the development site by:               and/or flooding is not worsened, impeded, or       impeded or otherwise diverted to adversely affect
  (a)    causing ponding of water on the site or            otherwise diverted to adversely affect other       other properties.
         nearby land;                                       properties or downstream environments.
  (b)    increasing flooding, which adversely affects
         the safety or use of any land upstream or
         downstream; or
  (c)    adversely affecting the flow of water in any
         overland flow path.




   Development Application: 13 Eumundi Noosa Road, Noosaville            Noosa Plan 2020: Amendment 1                                        Effective date: 25/09/2020

Log in to download the original (Planning Report - 13 Eumundi-Noosa Road, Noosaville QLD 4566 - Dual Occupany.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.