RFI - Attachment 2 - Engineering Plans

of 12

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

GENERAL NOTES                                                                            18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                       SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.                               UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
                                                                                             HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                           2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM                1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                                                                                                 OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND                    HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
                                                                                         19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                                                                                                           STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL              ENGINEER.
                                                                                             ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
     CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                               WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS                    MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.                            21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
     SETOUT THE WORKS.                                                                       ASSOCIATED WITH IMPLEMENTATION OF THE TMP.                                     3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT                  TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
                                                                                                                                                                                MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE                       SPECIALIST SHORING CONTRACTOR.
3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                 20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                          PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE            22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
     SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                  AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE                  REMOVED FROM SITE AT CONTRACTORS EXPENSE.                                     SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
     CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                                  WITH OPW APPROVALS BY COUNCIL.
                                                                                                                                                                            4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL                   OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
     GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED
                                                                                            21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                       VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT.                ENGINEER.
     STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
                                                                                                BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                      CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON                      23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
3.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                              THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                   SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN                           CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE
     THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND                              RESERVE, PARKS/OPENSPACE, EASEMENTS.                                            ACCORDANCE WITH GEOTECHNICAL REPORT AND AS1289.                               SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
     LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT                                                                                                           5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED                SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
     THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.                        22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                                                DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                    ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO                   24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE
4.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                              IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE                     OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
     SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS                         23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                     REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY                   BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
     TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                                       ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                    MOBILE PLANT ON THE SITE.                                                     DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS
     COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                          CONSTRUCTION CODE (2013).                                                   6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED                 SURFACE.
     CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF                                                                                                               WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS                     25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
     ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                         STANDARD SIGNS AND LINE MARKING NOTES                                               OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL.                        GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
     DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                                     IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL                 THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
     CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING                        1. GENERAL                                                                             FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF              THE PRELOADING OPERATIONS.
     PROPOSED WORKS.                                                                      1.1.  ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE                  100mm AND CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO             26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
5.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                 QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL                          THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM
     SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN                            DEVICES (CURRENT EDITION).                                                      PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL
     ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES                           2. SIGNS                                                                               TO 1% AND A MINIMUM C.B.R. OF 10%.                                        INSPECTIONS:
     CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO                           2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS               7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE                THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
     IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL                             NOTED OTHERWISE.                                                                CONTENT FOR STANDARD COMPACTION.                                          BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
     DIRECTION PRIOR TO COMMENCING CIVIL WORKS.                                            2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                  8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE                PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
                                                                                                EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                       PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF                  INSPECTIONS. SHOULD THE
6.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                          RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN
                                                                                                POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM
     BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,                                                                                                                                                                                           CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
                                                                                                FACE OF KERB.                                                                   CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
     CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD                                                                                                                                                                                                 RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO
                                                                                           2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                         STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH
     PAVEMENTS.                                                                                                                                                                                                                                           THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
                                                                                                TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                  CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.
                                                                                                                                                                                                                                                          RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE
7.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                                BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                         9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
                                                                                                                                                                                                                                                          CONTRACTOR.
     AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR                                         HEADLIGHT.                                                                      OF RETAINING WALL COLOUR AND FINISH.
     REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION                     3. SIGN SUPPORTS                                                                   10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL        a.     PRESTART
     OF INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.                                                                                                                       ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.
                                                                                           3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE                                                                                             b.     EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
8.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                                   THEY ARE IN A PAVED SURFACE.                                                    THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE                       AND EROSION CONTROL MEASURES UNSUITABLE GROUND
     WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                           4. LINEMARKING                                                                         CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
                                                                                                                                                                                CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS            c.     SIDE AND CUT OFF DRAINS
9.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                         4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.
                                                                                                                                                                                AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED           d.     STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
     PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,                           4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                          BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
     CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES                                                                                                                                                                                        e.     STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                                                                                                                THE GEOTECHNICAL REPORT.
     NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND                           JOINTING NOTES                                                                  11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO             f.     STORMWATER STRUCTURE BASE SLABS
     INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION
                                                                                                                                                                                98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT             g.     SEWER RETICULATION
     EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
                                                                                         1.      ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                         LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                                     REQUIREMENTS OF AS3727.1:2016.                                                 OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).                           h.     WATER RETICULATION
    THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE                           2.   SAW CUT JOINTS MUST BE:                                                    12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS            i.     PAVEMENT SUBGRADE
    WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.                                                                                                                               PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                                     2.1.   BETWEEN
                                                                                                               1 AND 1 OF CONCRETE PAVEMENT DEPTHS.                             ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL
                                                                                                                                                                                                                                                          j.     PAVEMENT REINFORCING

    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                                                      4 3                                                              EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER               k.     PAVEMENT PRIOR TO SEALING (PRESEAL)
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO                            2.2.  CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                               AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                          l.     RETAINING WALL FOOTING REINFORCING
    NOTE COUNCILS ADAC REQUIREMENTS.                                                         2.3.  PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.              13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
                                                                                            3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO                ACCORDANCE WITH LANDSCAPE DRAWINGS.                                       m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT
                                                                                                ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                  14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                       n.     STEEL REINFORCEMENT OF CONCRETE STRUCTURES
    APPROVALS.
                                                                                            4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                   15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                                                                                                                                                                                             o.     PRACTICAL COMPLETION
                                                                                                CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN                    MANAGEMENT PLANS.
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                                    THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                              16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE                p.     ON MAINTENANCE
    CONSTRUCTION.                                                                           5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES                     INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC        q.     OFF MAINTENANCE
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION                              ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB                   IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                SURFACE.                                                                                                                                                  r.     ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
    WORKS COMMENCING ON SITE.                                                                                                                                               17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
                                                                                                                                                                                                                                                                 DEVELOPMENT APPROVAL)
                                                                                            6. DOWEL BARS ARE TO BE                                                             RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
                                                                                             6.1.  FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                   AUSTRALIAN STANDARDS AND LEGISLATION.                                     s.     ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
    AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
                                                                                                   400MM CENTRES                                                            18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED                   RELEVANT TO THEIR CERTIFICATION SCHEME
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                                6.2.  FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                   ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT                                  300MM CENTRES                                                                SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO
    OF ANY WORKS ON SITE.                                                                                                                                                       COVER OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO
                                                                                             6.3.  FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED                              300MM CENTRES                                                                RESTRICT DUST MOVEMENT.
    IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO                                                                                                               19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
    ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND                                                                                                                 DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
    BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                                         EARTHWORKS NOTES                                                                       CONFIRMATION THAT WORKS CAN COMMENCE.
    ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE                     1.      FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                  20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
    AS DIRECTED.                                                                                 INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS RECOMMENDED               REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
                                                                                                 THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE                   GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY




                                                                                                                        CLIENT DETAILS:                                   PROJECT ADDRESS:                                    APPROVED BY:              PROJECT NAME:

                                                                                                                                                                                                                                                        PROPOSED SOCIAL HOUSING DEVELOPMENT
                                                                                                                                                                                                                                                        TITLE:                                    STATUS:

                                                                                                                                                                                     55 CARPENTERS ROAD                                                 GENERAL NOTES                            FOR APPROVAL - NOT FOR
                 © ABN 89 647 469 707
                                                                                                                                                                                      COOROY, QLD, 4563                                JARO BAULEKA                                              CONSTRUCTION
                  75 NOOSA DRIVE                                                                                                                                                                                                        RPEQ: 20693
                                                  01   05/09/22   FOR APPROVAL ISSUE                 JAC   MVP     JB   SCALE:
               NOOSA HEADS, QLD 4567                                                                                                                                                                                                      CPEng
                   +61 7 5211 1003               REV   DATE                DESCRIPTION               DWN   CHK    APP
                                                                                                                                                    N.T.S                                                                              DATE: 05/09/22
                                                                                                                                                                                                                                                        DRAWING NUMBER:                           PROJECT NUMBER:               SHEET REV:
                                                                                                                                                                                                                                                                                                                                 SIZE:
               RECORCONSULTING.COM                                              REVISIONS
                                                                                                                                          DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                        002                                       21020                         A1 01

Log in to download the original (RFI - Attachment 2 - Engineering Plans.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.