Original source · versioned page text
Reference Document - MCU25 0060 (As Published)
Site drainage should be designed to readily remove surface water and to prevent ponding of water on subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction is completed. It is recommended that footings be inspected by a suitably qualified and experienced engineer prior to placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and cleanliness of excavations. If any soil conditions encountered during construction are found to differ from those noted in the geotechnical investigation, Tectonic should be notified immediately and an inspection carried out to determine if changes to footing design are required. 6.4 Temporary and Permanent Retention Excavations for the basement may extend to depths of around 3 m BGL (existing ground levels) and the semi-basement footprint will extend close to the site boundaries, particularly on the northern side. Therefore, some form of temporary shoring will be required to support the basement excavation in that area at least. Isolated excavations elsewhere may also require temporary shoring. Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by use of sheet piles, however Unitywater requirements for sewer/water infrastructure may restrict the use of sheet piles. Shoring of deeper cuts would likely require lateral restraint, and this is conventionally achieved by helical steel anchors (similar to screw piles) in sands, although the proximity to neighbouring properties may require permissions to be obtained for subterranean access. Therefore, where lateral support by cantilever only is not feasible, it is suggested that internal struts/propping be considered to provide lateral restraint for the shoring system. Sheet piles may require pre-drilling of dense sands (generally anticipated to be below about 3.5 m to 4 m depth BGL) to prevent adverse vibrations during sheet pile installation. Other shoring methods that could be considered include bored contiguous or secant piles. Non- contiguous or soldier pile walls are not feasible for the proposed development due to the likelihood that the sands would ‘flow’ through gaps between the piles before application of facing. An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the permanent walls.Sheet piles can provide temporary to retention during construction only, therefore requiring a permanent structural wall to be constructed. Sheet pile walls can also be designed to provide permanent support. Bored pile walls generally require greater width (horizontally) for installation as compared to sheet piles and are often more expensive. Advice of a specialist piling contractor must be sought regarding feasibility, design and installation of the proposed retention and subsurface drainage system. It will be necessary to conduct numerical analysis to optimise the retention system. Detailed design will also need to account for relevant factors of safety. Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping backfill, will require engineer design and certification of construction. Retaining wall design should be carried out in accordance with AS4678-2002 Earth retaining structures. Design for temporary and permanent retaining structures could be carried out using a trapezoidal (for propped or anchored walls) pressure distribution applicable to the wall type and based on the parameters listed in Table 4. These values do not include allowance for hydrostatic pressures nor transient (e.g. construction) or adjacent footing loadings. Proposed Residential Development 25 August 2025 | 25038-001-Rev0 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.