1.6. the current location of street trees away from the road will not provide
shading to the street. Accordingly, street trees are to be located closer the
road however setback a minimum of 1 metre from the kerb and channel.
2. Payment of $12,500 bond in accordance with Condition 16 of MCU approval
(05/2302).
3. Payment of Public Open Space, Pathway and Headworks Contributions in
accordance with Conditions 28, 31 and 45 of MCU approval (05/2302).
4. Provide evidence of payment of Portable Long Service Leave Levy in accodance
with Advice Condition 5 of MCU approval (05/2302) where the cost of works
exceeds $80,000 or alternatively provide a statutory declaration confirming the
cost of works.
Land Development
5. Demonstrate how the development meets the following Conditions of the MCU
approval (05/2302):-
5.1. Condition No. 20 – requires the driveway to be a maximum width of 4.5
metres across the Ventura Street road reserve. Please amend all drawings
to reflect this.
5.2. Condition No. 33 – Please provide a survey plan indicating the location and
levels of Council’s sewer line and stormwater drainage lines.
5.3. Condition No. 34 – Without the survey plan as required by Condition 33, it
would appear that this condition cannot be complied with. Council suspects
that the proposed stormwater outlet pipe may clash with Council’s existing
sewer line.
5.4. Condition No. 40 - Modifications will be needed for the sewer manhole in
the proposed driveway, please supply the details of these modifications.
5.5. Condition No. 48 – Geotechnical Engineers report is require, demonstrating
if the site is suitable for excavation works to be carried out without damage
to the adjoining properties and structures on those properties. The report
shall also address the means of support for embankments during the
construction of this development.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Pursuant to the conditions of the Development Permit for a Material Change of Use
please note that all bonds and contributions are required to be paid prior to the issue of
the Operational Works approval.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00002104.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11 KB (small file)
- File type
No other editions are linked here.