2021-12-01 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Special Meeting
Wednesday, 1 December 2021
commencing at 9.00am
Council Chambers, 9 Pelican Street, Tewantin
Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 17 sections
Section 2
SPECIAL MEETING AGENDA 1 DECEMBER 2021
TABLE OF CONTENTS
ITEM PAGE
1. ATTENDANCE & APOLOGIES -
2. REPORTS 3
1 CONTRACT NO. T000059 NOOSAVILLE LANDFILL: CELL EXPANSION AND
CELL 1.1 CAPPING – TENDER AWARD 3
2 T000055 – NOOSA PARADE CORRIDOR UPGRADE - TENDER AWARD 12
3. MEETING CLOSURE -
Page 2 of 18
Section 3
SPECIAL MEETING AGENDA 1 DECEMBER 2021
2. REPORTS
1 CONTRACT NO. T000059 NOOSAVILLE LANDFILL: CELL EXPANSION AND CELL 1.1
CAPPING – TENDER AWARD
Author Project Manager, Cody Johnston
Infrastructure Services Department
Index ECM / Projects (T1) / Noosaville Landfill Cell 1.1 & 2.2 Expansion – CAP.Work
– 501041
ECM / Project & Contract / T000059 Noosaville Landfill Cell Expansion and
Cell 1.1 Capping
ECM / Subject / Contracting / Waste Management
Attachments 1. Tender Evaluation Spreadsheet
2. Noosaville Landfill Project Overlap and Sequencing
EXECUTIVE SUMMARY
Noosa Landfill Expansion and Cell Capping is critical works required for ongoing waste
operations.
The landfill’s previous expansion was completed in 2012, no further expansion has occurred
since.
Council’s current Cell 2.2 is approaching its interim capacity limits prompting the requirement
of cell expansion by June 2022.
An Invitation to Tender (ITT) was advertised on 27 September 2021 and closed on 29 October
2021.
Four respondents provided compliant submissions for Council to assess.
The tender price is within the increased project budget endorsed by the Capital Works Executive on 25
November 2021.
The comprehensive assessment of the four tenders resulted in the recommendation to award
the contract to Hazell Bros (Qld) Pty Ltd.
Endorsement of the recommendation in December 2021 will allow the contractor to mobilise
and procure construction materials in January 2022 to complete the project works by the
required construction deadlines.
RECOMMENDATION
That Council note the report by the Project Manager to the Special Meeting dated 1 December 2021
and:
A. Award Contract T000059 for the construction of the Noosaville Landfill – Cell Expansion and
Cell 1.1 Capping works to Hazell Bros (Qld) Pty Ltd for the lump sum price of $6,536,352 and
a maximum contract sum of up to $6,971,657 for provisional items excluding GST.
B. Approve an overall project budget of $8,950,000 excluding GST including on costs.
REPORT
1. Project Background
The Noosaville Landfill located on Noosa Eumundi Rd is Noosa Council’s primary waste facility. The
landfill currently consists of 3 waste cells identified as Cell 1.1, Cell 2.1, and Cell 2.2. Waste
placement into Cell 1.1 and Cell 2.1 has ceased as these cells have reached their interim limits and
have gas (methane) capture infrastructure installed throughout the cells. Cell 2.2 constructed in
Page 3 of 18
Section 4
SPECIAL MEETING AGENDA 1 DECEMBER 2021
2013 and commissioned in 2016 is now the operational active waste cell at the landfill.
Since the construction of Cell 2.2 in 2013, there has been no major capital works targeted at the
continued operations of the site.
In 2019, Cell 2.2 was observed to be approaching its interim capacity limits and planning commenced
for construction of the new cell to facilitate continued operations of the landfill before Cell 2.2 reaches
its interim capacity limits in June 2022.
Historically, landfill cell expansions consist of the construction of a new cell of a generic/defined size,
in unoccupied areas beside the existing land formation. This has been Council’s method of planning
since the site’s establishment. However, with consideration of the landfill’s limited available space
and need for a data driven approach, waste specialist consultant ATC Williams was engaged to
assist in the development of a Landfill Master Plan for the site. The master plan provided a holistic
layout of the site to optimise cell footprints and future staging.
An extract of the master plan for the site is provided in Attachment 2: “Noosaville Landfill Project
Overlap and Sequencing”, for information.
The primary findings from the master plan were the opportunity for expansion of Cell 1.1 southward
to optimise the landfill airspace capacity (life span) in place of constructing new waste cells (Cell 3.1,
3.2 or 3.3) to the east, as originally planned.
Both options, expansion of Cell 1.1 or construction of Cell 3.1, provided a forecasted additional 2-3
years of operational life. However, construction of the Cell 1.1 expansion allows for better fill
continuity with the landfill’s main cells (Cell 1.1, 2.1 and 2.2) for a further 10 - 15 years of operations
up to the next interim height (RL40m) before further cell works is required.
2. Project Scope
The project scope of the Noosaville Landfill – Cell Expansion and Cell 1.1 Capping works originated
as two (2) Capital projects programmed for delivery over multiple financial years. The scope of works
generally included the following:
a) Cell 1.1 Expansion
• Design and construction of Cell 1.1 - expansion southward to align with the southern
limits of Cell 2.2 for immediate use.
b) Cell 1.1 Capping
• Design and construction of Cell 1.1 - final capping of decommissioned batter extents
using clay and earthen material available on site.
The project scope and estimates were generally based upon approximated areas and typical design
elements. This high-level scoping and cost forecasting was later deemed unsuitable for the site’s
material suitability, design extents and complexity.
The detailed design identified that work in addition to the original project scope was required to
construct a functional and compliant waste cell for the site. Additional geological testing and
interrogation of the site’s available earthen material identified a lack of suitable clay on site, meaning
large quantities of clay would need to be imported during construction which is a risk as clay is widely
scarce and expensive.
This better understanding of the site’s geological conditions and functional/operational requirements
resulted in a rescoping of the original project scope for compliance. A summary of the required scope
additions and design layout is provided below:
a) Cell 1.1 & 2.2 Expansion (FY20/21)
• Design and construction of Cell 1.1 expansion, [Red]
• Design and construction of Cell 2.2 expansion, [Blue] (new)
• Design and construction of cell perimeter haul road, [Orange] (increase)
• Design and construction of new SW5 clean water and dirty water drains, [Purple] (new)
• Design and construction of new SW5 HES Basin, [Purple] (new)
Page 4 of 18
Section 5
SPECIAL MEETING AGENDA 1 DECEMBER 2021
b) Cell 1.1 Capping (FY22/23)
• Design and construction of Cell 1.1 final capping layer, using imported clay or
combination of geomembrane liners, [Green] (design change)
Figure 1. Works locality plan
3. Construction Scope
The construction tender for the Noosaville Landfill – Cell Expansion and Cell 1.1 Capping works is
the combination of the two (2) abovementioned Cell expansion and Cell capping capital projects.
The projects were packaged together and spread across multiple financial years for delivery due to
their similarity in construction resources (speciality contractors, equipment, and materials) and
overlapping site management requirements. In general, the scope of the construction works include:
a) Cell 1.1 & 2.2 Expansion (FY20/21)
• establishment and management of construction and environmental controls
• construction of new SW5 clean water and dirty water drains
• construction of new SW5 HES Basin
• construction of cell perimeter haul road
• all works for the expansion of Cells 1.1 & 2.2 (completed by speciality civil and liner
contractor)
b) Cell 1.1 Capping (FY22/23)
• establishment and management of construction and environmental controls
• construction of new clean water and dirty water batter drains
• all works for the construction of Cell 1.1 final capping layer (completed by speciality civil
and liner contractor)
Early work has been coordinated by Council independent of the construction contractor in
preparation for the main construction works to compress the overall delivery program. These works
included demolition of existing structures, vegetation clearing, relocation of operational stockpiles
Page 5 of 18
Section 6
SPECIAL MEETING AGENDA 1 DECEMBER 2021
and extension of the existing gas infrastructure. Other benefits of early works include reducing the
risk of interactions with the landfill’s operations contractors (such as Cleanaway and LMS Energy)
reducing program risk and cost variation from either party.
All early works are programmed for completion before the construction program milestones, enabling
the completion of the expansion and capping works as planned. If required, the contractor may be
requested to assist with early works if beneficial to the project’s delivery.
4. Budget
The original multiyear budget for the project is $5,266,000.
Following approval of tender acceptance, the multiyear project budget will be $8,950,000 and is
inclusive of all costs to date, design, project management, early works, demolition, and construction
as per the following breakdown:
Table 1. Project Cost Breakdown (multiyear)
Work Item Cell Expansion Cell Capping
Design & Planning $200,000 $200,000
Permits $20,000 $25,000
Procurement $10,000 $15,000
Project Delivery / Quality Management $300,000 $300,000
(Internal & External)
Construction $4,065,000 $3,815,000
Inclusive of Early works, Demolition, Tendered works &
provisional items, and on costs
Sub Total $4,595,000 $4,355,000
Summed Total $8,950,000
The revised project budget of $8,950,000 is $3,684,000 higher than the original multi-year budget of
$5,266,000. This increase is due to the combination of the following differences from the original
2020 project estimate:
Addition of design and construction of SW5 HES Basin, dosing system, clean water drains,
dirty water drains, and subsequent demolition, vegetation clearing, and revegetation works.
Addition of design and construction of Cell 2.2 expansion requirements, and subsequent
extension of perimeter road.
The final Cell 1.1 expansion limits (area) being larger than the original design estimate.
Ground conditions beneath Cell 1.1 being poorer than original expectations, requiring an
engineered subgrade treatment.
The original cost estimate was based on earthen materials (i.e. clay) being available on site.
Geotechnical investigations indicate limited suitable clay material is available on site requiring
alternative capping designs and material imports in addition to the original estimate.
The current market is experiencing a shortage in material and contractor availability,
disincentivising market competitiveness.
The projects budget shortfall and funding resolution is discussed further below within the Finance
section of this report.
5. Tender Process
Due to the forecasted construction cost for the packaged landfill works being greater than $200,000,
staff prepared and invited written tenders in accordance with the Local Government Act 2009. ITT
No. T000059 was released via VendorPanel on 27 September 2021 and advertised in Noosa Today
on 30 September 2021. The tender closed on 29 October 2021 with four (4) conforming submissions
received.
Page 6 of 18
Section 7
SPECIAL MEETING AGENDA 1 DECEMBER 2021
6. Tender Assessment
Tenders were received from the following firms, listed in alphabetical order:
Civilmart Group (Tellam)
DECC Environmental Pty Ltd
Hazell Bros (Qld) Pty Ltd
Symal Infrastructure Pty Ltd
Teneo Group Pty Ltd
The Civilmart Group (Tellam) tender was deemed non-conforming and was not considered. Symal
Infrastructure Pty Ltd provided an alternative tender which was included in the tender evaluation.
The conforming tenderers were evaluated using the following evaluation criteria and weightings:
Table 2. Tender Evaluation Criteria & Weighting
Evaluation Criteria Weightings
Price 30%
Capability & Experience 20%
Financial Capability 5%
Resourcing & Personnel 10%
Methodology 20%
Management Systems 10%
Contribution to Local Economy 5%
Attachment 1 presents the evaluation outcome of the conforming submissions against the above
criteria.
The tender evaluation panel completed the evaluation process and considered Hazell Bros (Qld) Pty
Ltd to be the most advantageous to Council, presenting strong capability, understanding and the
best value for money.
Hazell Bros (Qld) Pty Ltd’s tender submission is most favourable based on their tender
demonstrating the following:
High level of experience and capability to construct landfill projects of a similar nature.
A detailed methodology demonstrating their understanding of the scope.
Program to complete the work by Councils important milestones.
Certified Quality System.
Certified Workplace Health and Safety systems.
Overall best value for money benefit for Council for the project scope.
7. Program & Next Steps
Hazell Bros (Qld) Pty Ltd propose material procurement and on-site establishment to commence in
January 2022 with practical completion of the expansion works towards the end of May 2022 and
the capping works towards the start of September inclusive of a wet weather allowance. Hazell Bros
(Qld) Pty Ltd program duration is 35 weeks.
Early award of the tendered work enables the contractor to commence material procurement early
and lowers the risk of delay due to supply disruption of construction materials. The current expected
lead time for the liner materials which is used for the cell expansion is estimated as 8-12 weeks.
Council is currently generating its forward-thinking Waste Strategy which will include (but is not
limited to) increasing diversion from landfill, hence further extending the life of the landfill, and
improving the capital return.
Page 7 of 18
Section 8
SPECIAL MEETING AGENDA 1 DECEMBER 2021
8. Construction Management & Inspections
The current delivery model has Council in the project management and superintendent roles. Council
resourcing to support the project are in place with specialist consultants available to provide quality
assurance and technical advice as necessary.
Previous Council Consideration
Nil.
Finance
The revised project total of $8,950,000 is $3,684,000 higher than the original multi-year budget of
$5,266,000 as per the budget section of this report.
The project cost is fully Council funded and within the multiyear project budget allocation endorsed
by Council’s Capital Works Program. The Funding over the 2021/22 and 2022/23 financial years is
summarised in the table below:
Table 3. Multiyear Project Budget
Item 21/22FY 22/23FY Total
Revised Estimate $4,595,000 $4,355,000 $8,950,000
Budget $2,110,000 $3,156,000 $5,266,000
Difference $2,485,000 $1,199,000 $3,684,000
This shortfall will be funded through additional loan borrowings through the QTC annual loan
borrowing program for capital works, and the deferral of other major 2022/23 waste management
capital works (including the resource recovery area upgrade) to later financial years pending
completion of the site’s ‘master plan’ and configuration review.
Risks & Opportunities
Finance Risks Mitigations
Final contract value exceeds Investigations related to sites available material have been included in
allocated budget. contract to reduce the risk of variations during the works.
Extensive scoping of works under contract contains provisional items
and quantities to reduce the risk of variations during the works.
BOQ interrogation and sensitivity reviews have confirmed confidence
in the project budget allowance.
Project contingency of approximately 10% has been made for the
project.
Time Risks Mitigations
Delays affecting the cell Early tender award allows early procurement of critical materials with
construction long lead times.
Wet weather allowance to program have been included in the contract
documents.
Hazell Bros (Qld) Pty Ltd programs shows completion prior to the cell
expansion June 2022 deadline.
Hazell Bros (Qld) Pty Ltd have been clearly informed of the critical
nature of the cell expansion works and can escalate construction if
required.
Waste department have prepared several strategies to extend waste
operations if required. Waste operations will regular monitor waste
operations.
Page 8 of 18
Section 9
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Workplace Health and Safety Mitigations
Risks
Contractor fails to ensure the Contractor is to be appointed as Principal Contractor for the defined
work is undertaken safely and in construction area under the Queensland Work Health and Safety Act
accordance with standards 2011.
Prior to commencement of construction, Contractors management
plans, Safe Work Method Statements, Risk Assessments, and other
documentation will be submitted for review and approval by Council
and the Waste disposal Contractor.
Council will undertake surveillance, regular safety audits and
inspections throughout the construction works.
Resource Risk Mitigations
Scope, quality, safety, budget, Hazell Bros (Qld) Pty Ltd have nominated a highly capable team for
and program are affected due to the project with backup personnel as required.
resource/material shortages
Council will engage site representatives to ensure quality
conformance. Council can utilise internal resources to attend
inspections if required.
Consultation
External Consultation
Landfill’s waste operations contractor Cleanaway.
Landfill’s gas capture contractor LMS Energy.
Internal Consultation
Infrastructure Services (Director, Infrastructure Planning, Design and Delivery)
Community Services (Director, Waste & Environmental Health)
Corporate Services (Director, Finance Services)
Departments/Sections Consulted:
X Chief Executive Officer X Community Services X Corporate Services
Executive Support X Director X Director
Community Development X Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws X Procurement
X Waste & Environmental Health Property
Revenue Services
X Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
X People and Culture (Safety) Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 9 of 18
Section 10
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Page 10 of 18
Attachment No.1 - Final Evaluation
NOOSA SHIRE COUNCIL ighted Attribute Evaluation Spreadsheet - Final Evaluation
a
Conforming and Alternste Tenders Ory 2 2 a 4 s : 7 . ° » au a
Auntretien Business Wurnter (ABN) 76 169 336 725 40 AS 2 ee a7 120808 276 @ ose 26 33.600 G23 a6
Name of Tenderer (Respondent) DECC Erwtronmsental | Mazel Bene (Cid) Pry | Spraatinframuctare | Syrral ivtbastrecture
as per Respondent Oetails ASN rt uss Tey Lse | pepindiam) | TATA Group Phy iad
Date of Subentiaion (a: per VendorPane!) 28-0821 29-Ccb22 29-821 oe 26-Oct-22
(Buniness Registered Address (City/State Onty) Wiicrert, CLD | Rurtwigh Mande, CLD | Newenrtin, NEW Newecamcie, NEW Mion, CLD
tendered Price (Exc GST) $ Seonrmm)s aseessose|$ = raaeasnze | $ | Gmz7rSs| $B 434,10642
Tendered Price finctl GST) $ Samsers)$ = Famsnres | $ = Tesios) S$ «(sms S| (8277,sa806
Corrections /(Garifications (Exe! GST) + - | 6242.30 | $ $ * $ :
Conforming of Alternate: Contorreing: Conforming. Contoming AterareArproved Contorming
| Aiernate Price Adjustments (tx! GST) $ . $ $ $ . $ °
Price (Exci GST) After Corrections / Car®cations
itect's Aiternsta} $ Solem $ Geraies S$ = 718645R2E S$ =ENIITSE S| 64S IEEAD
Price Variance % from Lowest Price aa om 7. a 278
— a : De
[Price Variance from Medien $ .asreses 5 szazeas7 | $ - | as7eoes |) $ = 1,287,72826
Price Variance ‘% from Median 20.0% cd a om oN 1:
Steortiint (¥ /1M) vo Yo = ‘eo
PART A Mon price lemmas DECK Eevicementa) Mare® Bros (Qk) Pty Symal seme
+e Prvtet And Prete Prvcedian) Tene Group Poytad
/tvelustion Criterte Weighting (S) wegen ee enti mae reer meee Weer ee es Wein mee Wegent eee ed Wegener ete oe Wegener
Capetity and Lapenence 20% 2650 37.50 14.00 1400 19.00 ooC c.00 0.00 aoc 20 aco oop
Financial Capability ns 377 4s aa au am oo ooo 0.00 oc cD 200 oo
Resourcing & Personnel cad 720 a. as ss ans oop ooo 0.00 ogc c.00 0.00 oop
Methodology 20% 160 2750 14.50 20 19.00 ao e200 020 oop e200 oso oo
Management 3pterra 10% 920 7.78 a0 a0 70 ao e200 900 ao e200 oso ac
Contribution to Local foonceny x 4.00 428 4.00 400 400 ao e200 020 oo e200 oso ooo
Total Techical Score 7% Sed so37 susz soz esr o.00 020 2.00 0.00 0.00 0.00 apo
Normalived Technical Score (Tn) an as 57.00 am 7a.020
a Bee ‘Bros (Ok) Pty | Symal
PART bps sherent Pov ant Prete mete) | SEO Smprytet
Total Fees (Fe) = $496,125 See $7,34645828 $6, 709,277.58 SAAS 10842
Price Score a 13 108 12 os o ° o ° ° o c
\Normatised Price Score (Pr) m2 20 * _ ced o ° o ° ° o °
| Weighted Price Score (Pr) 287 30.00 736 2.70 me
‘Total Score of price and non price elements on 2643 55.76 no me
Ranking 3 2
The Auaraarcerd Pane! confirru the obove scorer and wwightings of thu evaluation and corfimu the evaluation has Seer conducted aamrdance wth thw Procurement Prabtty Pisn
Asemment Pare Poaition Tithe ‘Signature,
Evaluation Panel Chair & Asseamert Panel Member 2 Project Coordinator (i) a
Asveument Panel Member 2 ATC Willers Cormuttant (GR) %
Asserment Panel Member 3 Contracts and Project Superintendent |GB) a |
Aaseiment Panel Merber 4 Workplace Health and Safety Advisor [PA) x |
Asserment Panel Member 5 Eeveronmerttal Officer (Ft) zsSection 11
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Page 11 of 18
on
=a pahaea z m
uU
eS = Es ee af | cou i? 8 =
a Oe 2 r
Sees o i> Se ives > >
— Eve eno 2 O
— 7 S| EY qu les | o
=, i < =~ . Ae aR - al ——= =H j ; i = =
C2 yt Los DBE i 4 z 5
(7S 3 —_— ss : = m
# sa aia Uf ae “ { AL 2 S. y fe 5 - + re O}-. ap F aif » 3 8 >
(ft. ‘ Vee Seah LS Ty WK Cea) : Hs { M4 o Q
> ( f ere NY > on f } = Ven . : +. > Pes sl = ae > = m
ry} f. ant ¥ fi V ht \ PR Se ; = pe = z
# Te, : sl] ; ri, . i eK ~ 0
i} \} “Ga FO ix y ae RE = Cc >
: | \ | 7 gs. | Je > i Sf lj tee XK > Ne Pe pS i if 4 Ss
SDS Pe oad ff (Vy e aah een
@)) eR a Oe iw af LZ CUP WSS SS \ yf } =
KN ee ae) Ff YY AK WS) oh BR ‘Ty a
Ben +f AS YM SOQ AK \e H bY 3
sie» » gg hy Vip > \\ HN Ws ; hie 2
a] | ¢ as ) WRB Ny et gow HY 8
| rt os ADT ih) G oy A, 7 BLE p \" \\fI \\\ o x iS 2
? ¢ 2) ; g 4 St £ WN ‘ fp LIENS ih | | uh B ate . Oo
fy | . fp ye pp iV) Vy tj | q | | | le LC 2 & L&R) &, s
aon. (cS, ( yy Y MW VL I Ait a s 09 y@& B
| YB Ly INV QUA hi WWM RoSso S >
1s | a J f, Ay [ZZ VOLS LLL Lr 8 “(| \\ \t SS et
ee Y), Zs, VIN AWS fais
* } | fe £ Y, Wy figs i 3B ff? \ % ML \\\ SN Sa 2 s | i
yy | Yo Ff te iy Wage Zi > 3 q Ww aR Os ae ®
We . 2 3) 4h LLL | x S® % Ay AAR \ $2; i 2
| 47 ae tipi Lf mit Y Reg? f’ / : ; Sy Ox >
mofo Wi Li? eS WAG PKI =
My] UAL MAEDA Ja Qe : By SESS pt PY AY NT =
Vy } a a ae “ae Ps é SIS , YS } J an fo < ASL ‘ ss Sieh) =
A ale a {{ | } } N Gas eee SEZ Nh, iis LY Aqhn Td *
—“‘l 3 di VLA TS , a NAN 4 i Vi, WY, ily
. |B We 0 ~~ oe REN je eee
| RRB | BOW HL NOM GAZ ZS Aa =
(e226 1) A\x 8 KY WS ee . : \ mas Sf YET a “% fet p —
A, CF \ 3 = SSA f~ iM WY te, AN 9 AED xy Oo
PDN 8 SSeS Ay /— \ GLAAD § see, : a
. ik \ FAY @se ———— WY \ NS LN oa OF j s Oo
tA) } \j g \ ——— AX 7} a DNL i Airy ofa 0 m
{ \/) ) WN ZIRE. Yo s8 BP f =
Psa) n\ A Tit Wi \= ae Lo a - Veep \ C
fh - > WE Eg WH |, 2 ey C 2 Fy w
Th if Nf he iC 4 a; \LL7 x a? | 3 ae > . “ m
if. Uf a 2 Sp . gFE XS a 5 r / \ 7 es J ND
f } 3 \sa- gp ! S| i Pm Ff tae X
: if N ah 22 ATO if i f — —— :
)) Wp / al . sey ow fa a. |
( Sp 3 — wie gt fon | es Fz 5
Shy Li ' iy a we ¢ Se cg pe
‘4 | ; 9 i <g lie ee J co oe! Fa ang
f <—_ ti | gu ey
} Ke) pr |) aS oe B7=. coi accom 3
Wy HY s oo ae ey a :
om / i fA a day wt |= _ be
% ( f iT - we ~~ Fi Ss a rT eae
wan L : aS Magy \ 3
) \ \ Sly rN 2 “
JY WN sage Ne | if i i
/ Qe Jeg | mr ie i ihe Be | s
9 ar ro —~ | 8338 952 | §
Zo \ eee | ty per Se a i i 8
vee og LO fh
: Vay bo BAR
\3 ee / rie We po | af
= heaeseetnne wean a fii il ie a
<i f o i al ve
ionk “EERE = gli AY 8a ft rE
\ SS OP
JM Se Moe Com't eT / aad | Alo! CA ime
a fe SS mle lm
B see |
© 48 5 WaLren..
—_
—_
2g.
—_,
©Section 12
SPECIAL MEETING AGENDA 1 DECEMBER 2021
2 T000055 – NOOSA PARADE CORRIDOR UPGRADE - TENDER AWARD
Author Infrastructure Planning, Delivery and Design Manager, Craig Eldridge
Infrastructure Services Department
Index ECM/ Project and Contract/ T000055 Noosa Parade Corridor Upgrade/
Council Reports
ECM/ Projects (T1)/ Noosa Heads Noosa Parade Road Corridor Upgrade -
CAP.WORK – 500636
ECM/ Subject / Contracting / Road Construction
Attachments 1. Final Evaluation
EXECUTIVE SUMMARY
The design and delivery of the Noosa Parade Corridor Upgrade is a key project partially funded
by the Department of Transport and Main Roads (TMR) Cycle Network Local Government
Grants Program (CNLGGP) with additional funding provided by Noosa Council.
A Request for Tender (RFT) was advertised on 17 September 2021 and closed on 19 October
2021.
Three respondents provided submissions. One was identified as non-conforming and was not
considered further. During the evaluation of the remaining two submissions, which included
post tender clarifications, a second response was also deemed non-conforming.
The tender price is outside of Council’s allocated budget and requires additional budget to
complete the project.
The comprehensive assessment of the two tenders resulted in the recommendation to award
the contract to Bellwether Contractors Pty Ltd.
Endorsement of the recommendation will allow the contractor to mobilise in January 2022.
Recommendation to approve a total project budget of $8,087,225 excluding GST, including
contract value and on-costs.
RECOMMENDATION
That Council note the report by the Infrastructure Planning, Design and Delivery Manager to the
Special Meeting dated 1 December 2021, and:
A. Award Contract T000055 for the construction of the Noosa Parade Corridor Upgrade works to
Bellwether Contractors Pty Ltd for the lump sum of $6,739,146.26 (excl. GST); and
B. Approve the total project budget of $8,087,225 (excl. GST).
REPORT
9. Project Background
Construction of the Noosa Parade Corridor Upgrade is partially funded by the Department of
Transport and Main Road under the Cycle Network Local Government Grants Program (CNLGGP)
with the balance to be funded by Council.
The scope of the upgrade generally consists of:
Project Management of the early works, community liaison, and construction phases
Design, coordination, and liaison with relevant public utility authorities
All required works including stormwater, pavements, public utility and plant relocations,
streetlighting, footpaths, and landscaping.
Page 12 of 18
Section 13
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Landscaping plants are being supplied to the contractor by Council as Principal Supplied Materials
via Supplier Arrangement 1819T009, approved by the Capital Works Executive on 22 July 2021.
The project consists of the following stages with the status noted:
Stage Description Timing Status (%)
Planning & Design Planning & detailed design including Completed 100%
approvals
Implementation Costs Internal costs including consultants Dec 2020 – Oct 2022 25%
Construction All remaining works to complete the Jan 2022 – Oct 2022 This contract
upgrade
Table 1. Project status
10. Budget
The overall budget is presented below:
Summary Financial Details Amount (ex. GST)
Construction (see breakdown below) $7,502,579
Public utility plant relocations $384,565
Principal Supplied Street Furniture (Bus shelters, sign bollard) $52,814
Principal Supplied Landscaping $325,200
Civil works (this contract) $6,740,000
Project Management $249,646
Approved variations $0
Total $7,752,225
Table 2. Project budget
11. Tender Process
Due to the value of works exceeding $200,000, staff prepared and called for written tenders in
accordance with the Local Government Act 2009. The ITT for Contract No. T000055 was released
via VendorPanel on 14 September 2021 and advertised in Noosa Today on 17 September 2021.
The tender closed on 19 October 2021 with two (2) conforming submissions received.
12. Tender Evaluation
Three respondents provided submissions. One was identified as non-conforming and was not
considered further.
The evaluation panel undertook an assessment of the remaining two submissions, listed in
alphabetical order: During the evaluation, which included post tender clarifications, a second
response was also deemed non-conforming. The submissions, listed in alphabetical order are:
Bellwether Contractors Pty Ltd
Exceed Concrete Construction Pty Ltd.
During the evaluation, which included post tender clarifications, Exceed Concrete’s submission was
also deemed non-conforming, however was reviewed for comparison purposes.
The assessed submissions were evaluated using the following evaluation criteria and weightings:
Evaluation Criteria Weightings
Price 35%
Financial Capability and Resourcing 20%
Contract Experience and Capacity 15%
Methodology 15%
Quality 5%
Health & Safety 5%
Contribution to Local Economy 5%
Table 3. Evaluation criteria and weightings
The evaluation outcome of the assessed submissions against the above criteria is contained in
Attachment 1 – Final Evaluation.
Page 13 of 18
Section 14
SPECIAL MEETING AGENDA 1 DECEMBER 2021
The tender evaluation panel completed the evaluation process and considered Bellwether
Contractors Pty Ltd (Bellwether) to be the most advantageous to Council. Bellwether’s tender
submission is most favourable based on their tender demonstrating the following:
Evaluation Criteria Bellwether
Financial Capability and Tender Financial Capacity Assessment - the purpose of the assessment
Resourcing was to evaluate the relative financial stability and strength of the tenderer, and
the degree of relative risk associated with the tenderer’s ability to meet the
requirements of the construction project.
The assessment of the tenderer identified there is a moderate degree of risk
given the size of the project relative to the historic turnover, with average
annual turnover from 2016/17 to 2019/20 being $9.74 million for Bellwether
Contractors Pty Ltd.
Resourcing - the tenderer demonstrated a very strong and capable team.
Contract Experience The tenderer demonstrated very good experience in constructing in an urban
and Capacity environment and managing public and sensitive stakeholders and
demonstrates experience in delivery of civil infrastructure under live traffic and
to local authorities.
Methodology The tenderer has a very good understanding of the scope with a detailed
methodology. The tenderer demonstrates certainty of the completion date of
the work by providing a detailed program showing the scope of work, key
deliverables, and critical path. The tenderer provides a method statement
demonstrating how project risks are mitigated
Quality The tenderers Quality Management System is third party accredited and
certified to ISO 9001:2015.
The tenderers Environmental Management System is third party accredited
and certified to ISO 14001:2015. Environmental Policy and Management
System in place.
Health & Safety The tenderers Occupational Health & Safety Management System is third party
accredited and certified to ISO 45001:2018. Robust policy and procedures are
in place.
Contribution to Local Brisbane based company. Tenderer nominates 58% of materials and labour to
Economy be sourced from the Noosa and Sunshine Coast region.
Table 4. Evaluation comments
13. Program & Next Steps
Bellwether propose to establish site facilities in January 2022 with practical completion in October
2022 inclusive of wet weather allowance. Bellwether’s program duration is 39 weeks.
14. Construction Management & Inspections
The delivery model has Council fulfilling project management and superintendent roles. Council’s
allocated resourcing to support the project consists of staff and consultants to provide technical
advice and inspections, as necessary.
Previous Council Consideration
Nil.
Finance
The estimated project costs are funded by a combination of TMR’s CNLGGP grant funding and
Council. As per the milestone payments nominated in the Funding Agreement, the first milestone
payment of $1.115m ex. GST has been paid to Council upon the signing of the Agreement. The
second milestone payment of $557,500 ex. GST is to be invoiced upon contract award of this
construction contract.
The total construction cost estimate is detailed in Table 2. The post tender project budget is detailed
in Table 5.
Page 14 of 18
Section 15
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Noosa Parade Corridor Upgrade 21/22 22/23 Budget Total Project Budget
Budget including previous years
Pre-Tender $1,847,167 $3,900,000 $6,000,000
Post Tender $1,847,167 $3,900,000
$8,087,225
Savings identified in 22/23 Capital Bridges Program $2,000,000
Table 5. Post tender project budget
Risks & Opportunities
Finance Risks Mitigations
Final contract value exceeds Investigations related to subsurface conditions (groundwater and
allocated budget earthworks materials) have been included in contract to reduce the risk
of variations during the works.
Extensive scoping of works under contract contains provisional items
and quantities to reduce the risk of variations during the works.
Time Risks Mitigations
Delays affecting the main civil Wet weather allowance to program have been included in the contract
contract documents.
Bellwether’s program shows completion prior to the 2022 Noosa
Triathlon Multi Sport Festival. Coordination and engagement with these
key stakeholders is part of the project’s scope of works.
Workplace Health and Safety Mitigations
Risks
Bellwether fails to ensure the Bellwether is to be appointed as Principal Contractor under the
work is undertaken safely and in Queensland Work Health and Safety Act 2011.
accordance with standards
Prior to commencement of construction, Bellwether’s management
plans, Safe Work Method Statements, Risk Assessments, and other
documentation will be submitted for review and approval by Council.
Council will undertake surveillance, regular safety audits and
inspections throughout the construction works.
Resource Risk Mitigations
Scope, quality, safety, budget, Bellwether have nominated a highly capable team for the project with
and program are affected due to backup personnel as required.
resource/material shortages
Council can utilise internal resources to attend inspections if required.
Consultation
External Consultation - Community & Stakeholder
Council has undertaken extensive community and stakeholder engagement during the design and
development phases of the project. Consistent key messaging, community information sessions and
meetings with stakeholders and impacted property owners have occurred in the months leading up
to the award of this contract.
Communication with TMR as the grant sponsor is occurring with opportunities for joint-messaging
and media events being planned.
Page 15 of 18
Section 16
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Internal Consultation
Infrastructure Services (Director, Civil Operations, Asset Management, Infrastructure
Planning, Design and Delivery)
Environment & Sustainable Development (Development Assessment, Strategic Land Use
Planning)
Corporate Services (Procurement, Property)
Departments/Sections Consulted:
Chief Executive Officer Community Services X Corporate Services
Executive Support Director Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws X Procurement
Waste & Environmental Health X Property
Revenue Services
X Executive Services X Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services X Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development X Civil Operations
X People and Culture (Safety) Environmental Services Disaster Management
X Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 16 of 18
Section 17
SPECIAL MEETING AGENDA 1 DECEMBER 2021
Page 17 of 18
‘Atachment No.1 - Final Evaluation
NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
ell SE ESS a aS Ez
el | le
[centoraing and Anarnate Tenders Oxy 2 2 s ‘ s e ? . > 2» u a
|austratan Business Numbes (ABN) 5? 381 20087 45 O87 tam) 423
of Tenderer (Respoedent) Radha er awed Corcrete
per Respondent Details ABN Contractors Pty itd | Comtruction Pty Usd
[bate of submission as per VendorP ane! 19-Oct-21 19-Oct-21
[business Registered Address (Cty/State Onty) Brhbare, OLD Coorey, GLO
fendered Price (Exc! GST) $ 6,739,146.26)$ 4459,905.95 | $ -
fendered Price (Incll GST) $ 7,413,06089/$ 4,905,89655
[corrections /Cartiations (Ex! GST) $ $ .
[conforming or Alternate Crtomnng Conforming:
|aternate Price Adjustments (Exc! GST) $
(Exel GST) After Corrections / Clarifications
sand ARematal $ 673014626 5 4 459,905.95
Valance % fren Lowest Price Si O0N
ve a
Variance from Median $ 4,139,62045 $ 1,139,62015
‘Variance % from Median 20% 2K 1
vm) Yes Yes
Behera Everd Conerete
SORTA: Sen atten clement, Contractors Py Ltd Construction Pay bt
fron ier Weighting (%) went ome Weghend Sears emp oe Weathers kore emgtont score Weathers Score ergtent keane wompons score emg wom wegen Soars Wagan Seow Wengen Scone
[Capability and Resourcing 20% 15.69 1159 0.00 0.00 0.00 0.00 0.00 00 0.00 00 0.00 00
[Contract Experience and Capacky 19% 12.00 750 0.00 0.00 0.20 0.00 0.00 00 0.00 00 0.00 000
|retnodotogy 15% 1256 758 0.00 o.oo 0.00 0.00 0.00 00 0.00 00 0.00 000
fouaiey x 400 3.00 aco 0.00 0.00 0.00 0.00 000 0.00 00 0.00 000
[cain BSatety * 5.00 405 aco a0 0.00 0.00 0.00 00 0.00 a0 0.00 00
Contritution to Local Economy o* aso 5.00 aco 0.00 0.00 0.00 0.00 00 oo a0 0.00 00
[otal Technical Score ox 43.85 38.72 000 000 a20 0.00 0.20 0.00 0.00 0.00 0.00 000
a
PARTE. Price element « farts 10 Partsd
jotad Fees (Pe) ssn $6,739,146.25 $4,459,905.95
[price Scare = 20 ° o o o 0 o o ° 0 °
|nermatsed Price Score ia) « 100 ° o o o 0 o o ° 0 °
feted Price Score Pw) 2216 35.00
Total Score of price and non price elements e816 48
Loewe
The Aarument Rin! confirms thy stow oun and weighing of ths evskaten and confirm fhe eulustan as Bren conduitnd im airordance with the Pracarement Protty Alar
| Assessment Panel Position Title Sgnature |
Evaluation Panel Quair & Assesment Panel Member 1 Contracts and Project Superintendent (GB) se Poanahat
‘Assesment Pavel Member 2 Consultant - Auxiium Consulting Pty Lid (J8) e <
| Assesment Panel Member 3 Workplace Health & Safety Officer (DC) +4 eee ee |
| Assesonent Panel Member 4 Designer - Capital Works (Bt) x Bot Na Cher |
= y
Asseienent Panel Member S x
Page 17 of 18Section 18
SPECIAL MEETING AGENDA 1 DECEMBER 2021
3. MEETING CLOSURE
Page 18 of 18
SPECIAL MEETING AGENDA 1 DECEMBER 2021
3. MEETING CLOSURE
Page 18 of 18