2021-12-01 Special Meeting Agenda

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA



              Special Meeting


        Wednesday, 1 December 2021

                  commencing at 9.00am
          Council Chambers, 9 Pelican Street, Tewantin



Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-12-01 Special Meeting Agenda(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 17 sections

Section 2

SPECIAL MEETING AGENDA                                       1 DECEMBER 2021


TABLE OF CONTENTS


ITEM                                                                      PAGE



1.     ATTENDANCE & APOLOGIES                                                 -


2.     REPORTS                                                               3


       1   CONTRACT NO. T000059 NOOSAVILLE LANDFILL: CELL EXPANSION AND
           CELL 1.1 CAPPING – TENDER AWARD                                   3


       2   T000055 – NOOSA PARADE CORRIDOR UPGRADE - TENDER AWARD           12


3.     MEETING CLOSURE                                                        -




                                                                   Page 2 of 18

Section 3

SPECIAL MEETING AGENDA                                                             1 DECEMBER 2021


2.   REPORTS


1    CONTRACT NO. T000059 NOOSAVILLE LANDFILL: CELL EXPANSION AND CELL 1.1
     CAPPING – TENDER AWARD

Author           Project Manager, Cody Johnston
                 Infrastructure Services Department

Index            ECM / Projects (T1) / Noosaville Landfill Cell 1.1 & 2.2 Expansion – CAP.Work
                 – 501041
                 ECM / Project & Contract / T000059 Noosaville Landfill Cell Expansion and
                 Cell 1.1 Capping
                 ECM / Subject / Contracting / Waste Management

Attachments      1.    Tender Evaluation Spreadsheet
                 2.    Noosaville Landfill Project Overlap and Sequencing


EXECUTIVE SUMMARY
    Noosa Landfill Expansion and Cell Capping is critical works required for ongoing waste
     operations.
    The landfill’s previous expansion was completed in 2012, no further expansion has occurred
     since.
    Council’s current Cell 2.2 is approaching its interim capacity limits prompting the requirement
     of cell expansion by June 2022.
    An Invitation to Tender (ITT) was advertised on 27 September 2021 and closed on 29 October
     2021.
    Four respondents provided compliant submissions for Council to assess.
    The tender price is within the increased project budget endorsed by the Capital Works Executive on 25
     November 2021.
    The comprehensive assessment of the four tenders resulted in the recommendation to award
     the contract to Hazell Bros (Qld) Pty Ltd.
    Endorsement of the recommendation in December 2021 will allow the contractor to mobilise
     and procure construction materials in January 2022 to complete the project works by the
     required construction deadlines.

RECOMMENDATION
That Council note the report by the Project Manager to the Special Meeting dated 1 December 2021
and:
A.   Award Contract T000059 for the construction of the Noosaville Landfill – Cell Expansion and
     Cell 1.1 Capping works to Hazell Bros (Qld) Pty Ltd for the lump sum price of $6,536,352 and
     a maximum contract sum of up to $6,971,657 for provisional items excluding GST.
B.   Approve an overall project budget of $8,950,000 excluding GST including on costs.

REPORT
1.   Project Background
The Noosaville Landfill located on Noosa Eumundi Rd is Noosa Council’s primary waste facility. The
landfill currently consists of 3 waste cells identified as Cell 1.1, Cell 2.1, and Cell 2.2. Waste
placement into Cell 1.1 and Cell 2.1 has ceased as these cells have reached their interim limits and
have gas (methane) capture infrastructure installed throughout the cells. Cell 2.2 constructed in

                                                                                           Page 3 of 18

Section 4

SPECIAL MEETING AGENDA                                                              1 DECEMBER 2021


2013 and commissioned in 2016 is now the operational active waste cell at the landfill.
Since the construction of Cell 2.2 in 2013, there has been no major capital works targeted at the
continued operations of the site.
In 2019, Cell 2.2 was observed to be approaching its interim capacity limits and planning commenced
for construction of the new cell to facilitate continued operations of the landfill before Cell 2.2 reaches
its interim capacity limits in June 2022.
Historically, landfill cell expansions consist of the construction of a new cell of a generic/defined size,
in unoccupied areas beside the existing land formation. This has been Council’s method of planning
since the site’s establishment. However, with consideration of the landfill’s limited available space
and need for a data driven approach, waste specialist consultant ATC Williams was engaged to
assist in the development of a Landfill Master Plan for the site. The master plan provided a holistic
layout of the site to optimise cell footprints and future staging.
An extract of the master plan for the site is provided in Attachment 2: “Noosaville Landfill Project
Overlap and Sequencing”, for information.
The primary findings from the master plan were the opportunity for expansion of Cell 1.1 southward
to optimise the landfill airspace capacity (life span) in place of constructing new waste cells (Cell 3.1,
3.2 or 3.3) to the east, as originally planned.
Both options, expansion of Cell 1.1 or construction of Cell 3.1, provided a forecasted additional 2-3
years of operational life. However, construction of the Cell 1.1 expansion allows for better fill
continuity with the landfill’s main cells (Cell 1.1, 2.1 and 2.2) for a further 10 - 15 years of operations
up to the next interim height (RL40m) before further cell works is required.
2.    Project Scope
The project scope of the Noosaville Landfill – Cell Expansion and Cell 1.1 Capping works originated
as two (2) Capital projects programmed for delivery over multiple financial years. The scope of works
generally included the following:
a)    Cell 1.1 Expansion
      •     Design and construction of Cell 1.1 - expansion southward to align with the southern
            limits of Cell 2.2 for immediate use.

b)    Cell 1.1 Capping
      •     Design and construction of Cell 1.1 - final capping of decommissioned batter extents
            using clay and earthen material available on site.
The project scope and estimates were generally based upon approximated areas and typical design
elements. This high-level scoping and cost forecasting was later deemed unsuitable for the site’s
material suitability, design extents and complexity.
The detailed design identified that work in addition to the original project scope was required to
construct a functional and compliant waste cell for the site. Additional geological testing and
interrogation of the site’s available earthen material identified a lack of suitable clay on site, meaning
large quantities of clay would need to be imported during construction which is a risk as clay is widely
scarce and expensive.
This better understanding of the site’s geological conditions and functional/operational requirements
resulted in a rescoping of the original project scope for compliance. A summary of the required scope
additions and design layout is provided below:

a)    Cell 1.1 & 2.2 Expansion (FY20/21)
      •     Design and construction of Cell 1.1 expansion, [Red]
      •     Design and construction of Cell 2.2 expansion, [Blue] (new)
      •     Design and construction of cell perimeter haul road, [Orange] (increase)
      •     Design and construction of new SW5 clean water and dirty water drains, [Purple] (new)
      •     Design and construction of new SW5 HES Basin, [Purple] (new)

                                                                                            Page 4 of 18

Section 5

SPECIAL MEETING AGENDA                                                             1 DECEMBER 2021



b)    Cell 1.1 Capping (FY22/23)
      •     Design and construction of Cell 1.1 final capping layer, using imported clay or
            combination of geomembrane liners, [Green] (design change)

Figure 1. Works locality plan




3.    Construction Scope
The construction tender for the Noosaville Landfill – Cell Expansion and Cell 1.1 Capping works is
the combination of the two (2) abovementioned Cell expansion and Cell capping capital projects.
The projects were packaged together and spread across multiple financial years for delivery due to
their similarity in construction resources (speciality contractors, equipment, and materials) and
overlapping site management requirements. In general, the scope of the construction works include:
a)    Cell 1.1 & 2.2 Expansion (FY20/21)
      •     establishment and management of construction and environmental controls
      •     construction of new SW5 clean water and dirty water drains
      •     construction of new SW5 HES Basin
      •     construction of cell perimeter haul road
      •     all works for the expansion of Cells 1.1 & 2.2 (completed by speciality civil and liner
            contractor)

b)    Cell 1.1 Capping (FY22/23)
      •     establishment and management of construction and environmental controls
      •     construction of new clean water and dirty water batter drains
      •     all works for the construction of Cell 1.1 final capping layer (completed by speciality civil
            and liner contractor)
Early work has been coordinated by Council independent of the construction contractor in
preparation for the main construction works to compress the overall delivery program. These works
included demolition of existing structures, vegetation clearing, relocation of operational stockpiles

                                                                                           Page 5 of 18

Section 6

SPECIAL MEETING AGENDA                                                              1 DECEMBER 2021


and extension of the existing gas infrastructure. Other benefits of early works include reducing the
risk of interactions with the landfill’s operations contractors (such as Cleanaway and LMS Energy)
reducing program risk and cost variation from either party.
All early works are programmed for completion before the construction program milestones, enabling
the completion of the expansion and capping works as planned. If required, the contractor may be
requested to assist with early works if beneficial to the project’s delivery.
4.      Budget
The original multiyear budget for the project is $5,266,000.
Following approval of tender acceptance, the multiyear project budget will be $8,950,000 and is
inclusive of all costs to date, design, project management, early works, demolition, and construction
as per the following breakdown:

Table 1. Project Cost Breakdown (multiyear)
     Work Item                                                    Cell Expansion          Cell Capping
     Design & Planning                                                  $200,000              $200,000
     Permits                                                              $20,000              $25,000
     Procurement                                                          $10,000              $15,000
     Project Delivery / Quality Management                              $300,000              $300,000
     (Internal & External)
     Construction                                                      $4,065,000           $3,815,000
     Inclusive of Early works, Demolition, Tendered works &
     provisional items, and on costs
     Sub Total                                                         $4,595,000           $4,355,000
     Summed Total                                                                           $8,950,000

The revised project budget of $8,950,000 is $3,684,000 higher than the original multi-year budget of
$5,266,000. This increase is due to the combination of the following differences from the original
2020 project estimate:
       Addition of design and construction of SW5 HES Basin, dosing system, clean water drains,
        dirty water drains, and subsequent demolition, vegetation clearing, and revegetation works.
       Addition of design and construction of Cell 2.2 expansion requirements, and subsequent
        extension of perimeter road.
       The final Cell 1.1 expansion limits (area) being larger than the original design estimate.
       Ground conditions beneath Cell 1.1 being poorer than original expectations, requiring an
        engineered subgrade treatment.
       The original cost estimate was based on earthen materials (i.e. clay) being available on site.
        Geotechnical investigations indicate limited suitable clay material is available on site requiring
        alternative capping designs and material imports in addition to the original estimate.
       The current market is experiencing a shortage in material and contractor availability,
        disincentivising market competitiveness.
The projects budget shortfall and funding resolution is discussed further below within the Finance
section of this report.
5.      Tender Process
Due to the forecasted construction cost for the packaged landfill works being greater than $200,000,
staff prepared and invited written tenders in accordance with the Local Government Act 2009. ITT
No. T000059 was released via VendorPanel on 27 September 2021 and advertised in Noosa Today
on 30 September 2021. The tender closed on 29 October 2021 with four (4) conforming submissions
received.




                                                                                            Page 6 of 18

Section 7

SPECIAL MEETING AGENDA                                                                 1 DECEMBER 2021


6.        Tender Assessment
Tenders were received from the following firms, listed in alphabetical order:
           Civilmart Group (Tellam)
           DECC Environmental Pty Ltd
           Hazell Bros (Qld) Pty Ltd
           Symal Infrastructure Pty Ltd
           Teneo Group Pty Ltd
The Civilmart Group (Tellam) tender was deemed non-conforming and was not considered. Symal
Infrastructure Pty Ltd provided an alternative tender which was included in the tender evaluation.
The conforming tenderers were evaluated using the following evaluation criteria and weightings:
Table 2. Tender Evaluation Criteria & Weighting
    Evaluation Criteria                                                     Weightings
    Price                                                                       30%
    Capability & Experience                                                     20%
    Financial Capability                                                         5%
    Resourcing & Personnel                                                      10%
    Methodology                                                                 20%
    Management Systems                                                          10%
    Contribution to Local Economy                                                5%

Attachment 1 presents the evaluation outcome of the conforming submissions against the above
criteria.
The tender evaluation panel completed the evaluation process and considered Hazell Bros (Qld) Pty
Ltd to be the most advantageous to Council, presenting strong capability, understanding and the
best value for money.
Hazell Bros (Qld) Pty Ltd’s tender submission is most favourable based on their tender
demonstrating the following:
         High level of experience and capability to construct landfill projects of a similar nature.
         A detailed methodology demonstrating their understanding of the scope.
         Program to complete the work by Councils important milestones.
         Certified Quality System.
         Certified Workplace Health and Safety systems.
         Overall best value for money benefit for Council for the project scope.
7.        Program & Next Steps
Hazell Bros (Qld) Pty Ltd propose material procurement and on-site establishment to commence in
January 2022 with practical completion of the expansion works towards the end of May 2022 and
the capping works towards the start of September inclusive of a wet weather allowance. Hazell Bros
(Qld) Pty Ltd program duration is 35 weeks.
Early award of the tendered work enables the contractor to commence material procurement early
and lowers the risk of delay due to supply disruption of construction materials. The current expected
lead time for the liner materials which is used for the cell expansion is estimated as 8-12 weeks.
Council is currently generating its forward-thinking Waste Strategy which will include (but is not
limited to) increasing diversion from landfill, hence further extending the life of the landfill, and
improving the capital return.



                                                                                              Page 7 of 18

Section 8

SPECIAL MEETING AGENDA                                                                 1 DECEMBER 2021


8.     Construction Management & Inspections
The current delivery model has Council in the project management and superintendent roles. Council
resourcing to support the project are in place with specialist consultants available to provide quality
assurance and technical advice as necessary.
Previous Council Consideration
Nil.
Finance
The revised project total of $8,950,000 is $3,684,000 higher than the original multi-year budget of
$5,266,000 as per the budget section of this report.
The project cost is fully Council funded and within the multiyear project budget allocation endorsed
by Council’s Capital Works Program. The Funding over the 2021/22 and 2022/23 financial years is
summarised in the table below:
Table 3. Multiyear Project Budget
 Item                                                     21/22FY             22/23FY                   Total
 Revised Estimate                                       $4,595,000          $4,355,000             $8,950,000
 Budget                                                 $2,110,000          $3,156,000             $5,266,000
 Difference                                             $2,485,000          $1,199,000             $3,684,000

This shortfall will be funded through additional loan borrowings through the QTC annual loan
borrowing program for capital works, and the deferral of other major 2022/23 waste management
capital works (including the resource recovery area upgrade) to later financial years pending
completion of the site’s ‘master plan’ and configuration review.
Risks & Opportunities
 Finance Risks                      Mitigations
 Final contract value exceeds       Investigations related to sites available material have been included in
 allocated budget.                  contract to reduce the risk of variations during the works.
                                    Extensive scoping of works under contract contains provisional items
                                    and quantities to reduce the risk of variations during the works.
                                    BOQ interrogation and sensitivity reviews have confirmed confidence
                                    in the project budget allowance.
                                    Project contingency of approximately 10% has been made for the
                                    project.


 Time Risks                         Mitigations
 Delays affecting the cell          Early tender award allows early procurement of critical materials with
 construction                       long lead times.
                                    Wet weather allowance to program have been included in the contract
                                    documents.
                                    Hazell Bros (Qld) Pty Ltd programs shows completion prior to the cell
                                    expansion June 2022 deadline.
                                    Hazell Bros (Qld) Pty Ltd have been clearly informed of the critical
                                    nature of the cell expansion works and can escalate construction if
                                    required.
                                    Waste department have prepared several strategies to extend waste
                                    operations if required. Waste operations will regular monitor waste
                                    operations.




                                                                                               Page 8 of 18

Section 9

SPECIAL MEETING AGENDA                                                                     1 DECEMBER 2021


 Workplace Health and Safety            Mitigations
 Risks
 Contractor fails to ensure the         Contractor is to be appointed as Principal Contractor for the defined
 work is undertaken safely and in       construction area under the Queensland Work Health and Safety Act
 accordance with standards              2011.
                                        Prior to commencement of construction, Contractors management
                                        plans, Safe Work Method Statements, Risk Assessments, and other
                                        documentation will be submitted for review and approval by Council
                                        and the Waste disposal Contractor.
                                        Council will undertake surveillance, regular safety audits and
                                        inspections throughout the construction works.


 Resource Risk                          Mitigations
 Scope, quality, safety, budget,        Hazell Bros (Qld) Pty Ltd have nominated a highly capable team for
 and program are affected due to        the project with backup personnel as required.
 resource/material shortages
                                        Council will engage site representatives to ensure quality
                                        conformance. Council can utilise internal resources to attend
                                        inspections if required.

Consultation
External Consultation
    Landfill’s waste operations contractor Cleanaway.
    Landfill’s gas capture contractor LMS Energy.
Internal Consultation
     Infrastructure Services (Director, Infrastructure Planning, Design and Delivery)
     Community Services (Director, Waste & Environmental Health)
     Corporate Services (Director, Finance Services)
Departments/Sections Consulted:
 X   Chief Executive Officer       X   Community Services                         X   Corporate Services
     Executive Support             X   Director                                   X   Director
                                       Community Development                      X   Financial Services
                                       Community Facilities                           Fleet
                                       Libraries & Galleries                          ICT
                                       Local Laws                                 X   Procurement
                                   X   Waste & Environmental Health                   Property
                                                                                      Revenue Services

 X   Executive Services                Environment & Sustainable Development      X   Infrastructure Services
     Director                          Director                                       Director
     Community Engagement              Building & Plumbing Services                   Asset Management
     Customer Service                  Development Assessment                         Buildings and Facilities
     Governance                        Economic Development                           Civil Operations
 X   People and Culture (Safety)       Environmental Services                         Disaster Management
                                       Strategic Land Use Planning                X   Infrastructure Planning,
                                                                                      Design and Delivery




                                                                                                     Page 9 of 18

Section 10

SPECIAL MEETING AGENDA   1 DECEMBER 2021




                                           Page 10 of 18

Attachment No.1 - Final Evaluation

 NOOSA SHIRE COUNCIL                ighted Attribute Evaluation    Spreadsheet  - Final Evaluation
 a

Conforming and Alternste Tenders Ory                   2               2                a               4                s               :               7                .               °               »                au              a
Auntretien Business Wurnter (ABN)                76 169 336 725    40 AS 2 ee     a7 120808 276    @ ose 26         33.600 G23 a6
 Name of Tenderer (Respondent)                 DECC Erwtronmsental | Mazel Bene (Cid) Pry | Spraatinframuctare | Syrral ivtbastrecture
 as per Respondent Oetails ASN                       rt                uss         Tey Lse    |     pepindiam)  | TATA Group Phy iad
Date of Subentiaion (a: per VendorPane!)           28-0821         29-Ccb22         29-821            oe             26-Oct-22
(Buniness Registered Address (City/State Onty)     Wiicrert, CLD | Rurtwigh Mande, CLD | Newenrtin, NEW Newecamcie, NEW Mion, CLD
 tendered Price (Exc GST)                       $    Seonrmm)s       aseessose|$ = raaeasnze | $ | Gmz7rSs|       $B  434,10642
 Tendered Price finctl GST)                     $    Samsers)$ = Famsnres | $ = Tesios)           S$  «(sms       S|  (8277,sa806
 Corrections /(Garifications (Exe! GST)          +          - |         6242.30 | $               $          *    $           :
Conforming of Alternate:                          Contorreing:     Conforming.     Contoming     AterareArproved     Contorming
| Aiernate Price Adjustments (tx! GST)           $          .    $               $                $          .    $           °
 Price (Exci GST) After Corrections / Car®cations
 itect's Aiternsta}                             $    Solem       $   Geraies     S$ = 718645R2E  S$   =ENIITSE    S| 64S IEEAD
 Price Variance % from Lowest Price                  aa              om               7.               a              278
 —                                             a                                        :               De
[Price Variance from Medien                     $    .asreses 5        szazeas7 | $          -   |     as7eoes |) $ = 1,287,72826
Price Variance ‘% from Median       20.0%             cd              a                 om             oN               1:
Steortiint (¥ /1M)                                                     vo              Yo              =                ‘eo
             PART A Mon price lemmas           DECK Eevicementa) Mare® Bros (Qk) Pty Symal       seme
                 +e                                 Prvtet            And           Prete           Prvcedian)    Tene Group Poytad
/tvelustion Criterte             Weighting (S)     wegen ee        enti mae          reer meee     Weer ee                  es       Wein mee        Wegent eee              ed      Wegener           ete             oe              Wegener
 Capetity and Lapenence             20%              2650             37.50          14.00             1400           19.00            ooC              c.00            0.00            aoc              20              aco              oop
 Financial Capability                  ns             377             4s              aa               au              am              oo              ooo               0.00            oc              cD               200             oo
 Resourcing & Personnel               cad             720             a.               as              ss              ans             oop             ooo              0.00            ogc              c.00             0.00            oop
Methodology                         20%              160              2750           14.50             20            19.00             ao              e200             020             oop              e200           oso               oo
 Management 3pterra                   10%             920             7.78           a0                a0               70             ao               e200            900             ao               e200           oso               ac
 Contribution to Local foonceny       x               4.00            428             4.00             400            400              ao               e200            020             oo               e200            oso              ooo
 Total Techical Score               7%              Sed              so37             susz            soz            esr                o.00            020             2.00             0.00           0.00              0.00            apo
           Normalived Technical Score (Tn)          an                  as            57.00          am                7a.020
                           a                    Bee                  ‘Bros (Ok) Pty | Symal
              PART bps sherent                     Pov                ant           Prete           mete)      | SEO Smprytet
 Total Fees (Fe)                      =          $496,125         See              $7,34645828    $6, 709,277.58   SAAS 10842
 Price Score                                           a               13              108             12               os               o               °                o               °               °                o               c
\Normatised Price Score (Pr)                          m2             20                *                _              ced               o               °                o               °               °                o               °
| Weighted Price Score (Pr)                          287             30.00            736            2.70              me
       ‘Total Score of price and non price elements  on               2643           55.76           no                me
                    Ranking                                                             3                               2
        The Auaraarcerd Pane! confirru the obove scorer and wwightings of thu evaluation and corfimu the evaluation has Seer conducted aamrdance wth thw Procurement Prabtty Pisn
                Asemment Pare                                     Poaition Tithe                                     ‘Signature,
   Evaluation Panel Chair & Asseamert Panel Member 2          Project Coordinator (i)            a
            Asveument Panel Member 2                        ATC Willers Cormuttant (GR)          %
            Asserment Panel Member 3                    Contracts and Project Superintendent |GB) a                                              |
            Aaseiment Panel Merber 4                    Workplace Health and Safety Advisor [PA) x                                               |
             Asserment Panel Member 5                         Eeveronmerttal Officer (Ft)       zs

Section 11

SPECIAL MEETING AGENDA   1 DECEMBER 2021




                                           Page 11 of 18

on
                                                                                  =a pahaea z      m
                                                                                                    uU
                     eS             =     Es                     ee   af    |      cou i? 8        =
                                  a                                               Oe 2             r
                                              Sees               o     i>      Se ives >           >
                                                                  —      Eve         eno   2       O
      —                7             S|       EY                qu                     les | o
     =, i < =~   .   Ae aR                   -                al  ——=       =H       j ; i =       =
       C2                   yt                    Los           DBE                    i 4 z       5
       (7S                                  3         —_—        ss                 :      =       m
      # sa aia Uf ae “  { AL 2   S.     y fe 5    -    +       re O}-. ap F aif    »   3   8       >
             (ft. ‘  Vee        Seah   LS    Ty    WK Cea)                :   Hs  { M4     o       Q
       >     (  f     ere     NY > on    f   } =   Ven . :   +. >   Pes  sl =   ae     >   =       m
         ry} f.            ant ¥      fi V   ht \ PR Se        ;      = pe                 =       z
      #                     Te,  :   sl]   ;  ri,            .            i eK           ~         0
        i} \}           “Ga      FO            ix           y     ae           RE       = Cc       >
      : |  \ |  7   gs. | Je > i   Sf     lj  tee    XK     > Ne Pe pS i         if   4    Ss
             SDS Pe     oad   ff      (Vy       e             aah een
      @))   eR a     Oe    iw  af     LZ CUP          WSS SS \ yf           }              =
         KN                ee  ae) Ff     YY     AK WS) oh BR ‘Ty                          a
      Ben  +f            AS              YM          SOQ AK \e              H         bY   3
       sie»             »    gg   hy     Vip        > \\      HN    Ws ;              hie  2
      a]  | ¢           as )          WRB                  Ny        et gow             HY 8
       |  rt os      ADT             ih) G oy A, 7 BLE p  \" \\fI \\\      o    x     iS 2
     ? ¢  2)  ;      g 4   St £      WN     ‘ fp LIENS     ih |  |  uh       B ate    .    Oo
       fy   | .     fp   ye   pp    iV) Vy tj           |   q | | | le  LC 2 & L&R)  &, s
      aon. (cS,     (   yy Y           MW   VL                I Ait a      s   09     y@& B
        | YB             Ly              INV QUA hi          WWM RoSso S      >
       1s | a      J   f, Ay     [ZZ     VOLS LLL Lr 8    “(| \\ \t SS    et
         ee             Y),   Zs,            VIN           AWS                   fais
      *  } | fe   £    Y,    Wy figs i 3B     ff?    \ % ML \\\ SN Sa 2           s  |  i
      yy | Yo      Ff     te iy Wage Zi              > 3 q Ww aR Os               ae       ®
       We .    2 3)   4h LLL |                   x  S®   % Ay      AAR \          $2; i    2
           |         47 ae tipi  Lf mit Y  Reg?    f’ /       :       ;      Sy Ox >
     mofo      Wi             Li? eS                      WAG            PKI               =
       My] UAL    MAEDA           Ja     Qe          :    By SESS    pt PY    AY NT        =
         Vy } a   a ae “ae Ps é SIS , YS               } J  an fo < ASL ‘  ss Sieh)        =
        A ale a       {{ | } } N      Gas     eee SEZ         Nh, iis LY     Aqhn Td    *
     —“‘l 3   di      VLA      TS , a NAN            4 i Vi, WY,            ily
     .  |B           We         0 ~~ oe REN je                          eee
      | RRB |     BOW         HL          NOM GAZ               ZS Aa                              =
        (e226 1) A\x 8 KY WS    ee  .     : \ mas Sf     YET   a   “%   fet        p    —
       A,   CF \ 3 =      SSA            f~ iM WY te, AN         9 AED           xy                Oo
      PDN 8               SSeS Ay /—         \ GLAAD § see,                     :                  a
     . ik   \   FAY @se     ———— WY           \ NS LN          oa OF     j     s                   Oo
     tA)    } \j g      \ ———      AX 7}       a DNL        i Airy      ofa     0                  m
       {   \/) )                     WN        ZIRE. Yo s8      BP            f                    =
      Psa) n\                 A Tit   Wi \= ae Lo a          - Veep \         C
      fh      -                 >     WE Eg WH           |, 2 ey        C    2       Fy            w
     Th if Nf      he       iC 4  a;   \LL7 x               a? | 3     ae   >    .   “             m
     if. Uf          a       2 Sp    .  gFE          XS a 5 r   / \   7     es       J             ND
     f            } 3           \sa-                 gp !     S| i Pm Ff          tae              X
     :   if        N ah       22                   ATO    if     i   f   — —— :
     )) Wp      /        al       .             sey    ow      fa      a.            |
     (   Sp           3      —     wie            gt       fon  |   es        Fz     5
     Shy          Li    '                      iy   a we     ¢    Se       cg    pe
      ‘4         |           ;     9        i <g    lie  ee J    co  oe!  Fa    ang
     f               <—_       ti | gu                        ey
     } Ke)   pr |)    aS oe           B7=. coi                            accom        3
      Wy       HY    s      oo   ae        ey     a           :
     om /   i fA          a           day     wt |=                  _        be
     % (    f iT    -    we    ~~  Fi       Ss      a           rT             eae
    wan     L :      aS           Magy \         3
       )    \ \                  Sly rN     2 “
      JY    WN               sage        Ne       |                         if i i
     / Qe              Jeg            |         mr    ie i                 ihe  Be | s
       9                 ar        ro         —~  |   8338                     952 | §
       Zo          \  eee |      ty        per      Se           a           i i    8
       vee                  og            LO         fh
        :    Vay                         bo         BAR
     \3       ee         /   rie We         po            |            af
     = heaeseetnne   wean             a               fii il      ie  a
     <i                             f              o i al          ve
     ionk “EERE =                  gli        AY             8a   ft   rE
     \     SS                                 OP
     JM     Se Moe Com't eT /                  aad        |       Alo!        CA   ime
a    fe             SS                            mle lm
B    see                       |
©    48   5           WaLren..
 —_
 —_
2g.
—_,
©

Section 12

SPECIAL MEETING AGENDA                                                        1 DECEMBER 2021


2    T000055 – NOOSA PARADE CORRIDOR UPGRADE - TENDER AWARD

Author          Infrastructure Planning, Delivery and Design Manager, Craig Eldridge
                Infrastructure Services Department

Index           ECM/ Project and Contract/ T000055 Noosa Parade Corridor Upgrade/
                Council Reports
                ECM/ Projects (T1)/ Noosa Heads Noosa Parade Road Corridor Upgrade -
                CAP.WORK – 500636
                ECM/ Subject / Contracting / Road Construction

Attachments     1.    Final Evaluation


EXECUTIVE SUMMARY
    The design and delivery of the Noosa Parade Corridor Upgrade is a key project partially funded
     by the Department of Transport and Main Roads (TMR) Cycle Network Local Government
     Grants Program (CNLGGP) with additional funding provided by Noosa Council.
    A Request for Tender (RFT) was advertised on 17 September 2021 and closed on 19 October
     2021.
    Three respondents provided submissions. One was identified as non-conforming and was not
     considered further. During the evaluation of the remaining two submissions, which included
     post tender clarifications, a second response was also deemed non-conforming.
    The tender price is outside of Council’s allocated budget and requires additional budget to
     complete the project.
    The comprehensive assessment of the two tenders resulted in the recommendation to award
     the contract to Bellwether Contractors Pty Ltd.
    Endorsement of the recommendation will allow the contractor to mobilise in January 2022.
    Recommendation to approve a total project budget of $8,087,225 excluding GST, including
     contract value and on-costs.

RECOMMENDATION
That Council note the report by the Infrastructure Planning, Design and Delivery Manager to the
Special Meeting dated 1 December 2021, and:
A.   Award Contract T000055 for the construction of the Noosa Parade Corridor Upgrade works to
     Bellwether Contractors Pty Ltd for the lump sum of $6,739,146.26 (excl. GST); and
B.   Approve the total project budget of $8,087,225 (excl. GST).

REPORT
9.   Project Background

Construction of the Noosa Parade Corridor Upgrade is partially funded by the Department of
Transport and Main Road under the Cycle Network Local Government Grants Program (CNLGGP)
with the balance to be funded by Council.

The scope of the upgrade generally consists of:
    Project Management of the early works, community liaison, and construction phases
    Design, coordination, and liaison with relevant public utility authorities
    All required works including stormwater, pavements, public utility and plant relocations,
     streetlighting, footpaths, and landscaping.


                                                                                    Page 12 of 18

Section 13

SPECIAL MEETING AGENDA                                                                      1 DECEMBER 2021


Landscaping plants are being supplied to the contractor by Council as Principal Supplied Materials
via Supplier Arrangement 1819T009, approved by the Capital Works Executive on 22 July 2021.
The project consists of the following stages with the status noted:

    Stage                       Description                                 Timing                Status (%)
    Planning & Design           Planning & detailed design including        Completed             100%
                                approvals
    Implementation Costs        Internal costs including consultants        Dec 2020 – Oct 2022   25%
    Construction                All remaining works to complete the         Jan 2022 – Oct 2022   This contract
                                upgrade
                                                Table 1. Project status

10.      Budget
The overall budget is presented below:
                               Summary Financial Details                                   Amount (ex. GST)
    Construction (see breakdown below)                                                              $7,502,579
         Public utility plant relocations                                                            $384,565
         Principal Supplied Street Furniture (Bus shelters, sign bollard)                              $52,814
         Principal Supplied Landscaping                                                              $325,200
         Civil works (this contract)                                                               $6,740,000
    Project Management                                                                                $249,646
    Approved variations                                                                                      $0
    Total                                                                                           $7,752,225
                                               Table 2. Project budget

11.      Tender Process
Due to the value of works exceeding $200,000, staff prepared and called for written tenders in
accordance with the Local Government Act 2009. The ITT for Contract No. T000055 was released
via VendorPanel on 14 September 2021 and advertised in Noosa Today on 17 September 2021.
The tender closed on 19 October 2021 with two (2) conforming submissions received.

12.      Tender Evaluation
Three respondents provided submissions. One was identified as non-conforming and was not
considered further.
The evaluation panel undertook an assessment of the remaining two submissions, listed in
alphabetical order: During the evaluation, which included post tender clarifications, a second
response was also deemed non-conforming. The submissions, listed in alphabetical order are:
        Bellwether Contractors Pty Ltd
        Exceed Concrete Construction Pty Ltd.
During the evaluation, which included post tender clarifications, Exceed Concrete’s submission was
also deemed non-conforming, however was reviewed for comparison purposes.
The assessed submissions were evaluated using the following evaluation criteria and weightings:
                                       Evaluation Criteria                              Weightings
                 Price                                                                     35%
                 Financial Capability and Resourcing                                       20%
                 Contract Experience and Capacity                                          15%
                 Methodology                                                               15%
                 Quality                                                                    5%
                 Health & Safety                                                            5%
                 Contribution to Local Economy                                              5%
                                      Table 3. Evaluation criteria and weightings

The evaluation outcome of the assessed submissions against the above criteria is contained in
Attachment 1 – Final Evaluation.

                                                                                                  Page 13 of 18

Section 14

SPECIAL MEETING AGENDA                                                                   1 DECEMBER 2021


The tender evaluation panel completed the evaluation process and considered Bellwether
Contractors Pty Ltd (Bellwether) to be the most advantageous to Council. Bellwether’s tender
submission is most favourable based on their tender demonstrating the following:

 Evaluation Criteria        Bellwether
 Financial Capability and   Tender Financial Capacity Assessment - the purpose of the assessment
 Resourcing                 was to evaluate the relative financial stability and strength of the tenderer, and
                            the degree of relative risk associated with the tenderer’s ability to meet the
                            requirements of the construction project.
                            The assessment of the tenderer identified there is a moderate degree of risk
                            given the size of the project relative to the historic turnover, with average
                            annual turnover from 2016/17 to 2019/20 being $9.74 million for Bellwether
                            Contractors Pty Ltd.
                            Resourcing - the tenderer demonstrated a very strong and capable team.
 Contract Experience        The tenderer demonstrated very good experience in constructing in an urban
 and Capacity               environment and managing public and sensitive stakeholders and
                            demonstrates experience in delivery of civil infrastructure under live traffic and
                            to local authorities.
 Methodology                The tenderer has a very good understanding of the scope with a detailed
                            methodology. The tenderer demonstrates certainty of the completion date of
                            the work by providing a detailed program showing the scope of work, key
                            deliverables, and critical path. The tenderer provides a method statement
                            demonstrating how project risks are mitigated
 Quality                    The tenderers Quality Management System is third party accredited and
                            certified to ISO 9001:2015.
                            The tenderers Environmental Management System is third party accredited
                            and certified to ISO 14001:2015. Environmental Policy and Management
                            System in place.
 Health & Safety            The tenderers Occupational Health & Safety Management System is third party
                            accredited and certified to ISO 45001:2018. Robust policy and procedures are
                            in place.
 Contribution to Local      Brisbane based company. Tenderer nominates 58% of materials and labour to
 Economy                    be sourced from the Noosa and Sunshine Coast region.
                                         Table 4. Evaluation comments

13.    Program & Next Steps
Bellwether propose to establish site facilities in January 2022 with practical completion in October
2022 inclusive of wet weather allowance. Bellwether’s program duration is 39 weeks.
14.    Construction Management & Inspections
The delivery model has Council fulfilling project management and superintendent roles. Council’s
allocated resourcing to support the project consists of staff and consultants to provide technical
advice and inspections, as necessary.
Previous Council Consideration
Nil.
Finance
The estimated project costs are funded by a combination of TMR’s CNLGGP grant funding and
Council. As per the milestone payments nominated in the Funding Agreement, the first milestone
payment of $1.115m ex. GST has been paid to Council upon the signing of the Agreement. The
second milestone payment of $557,500 ex. GST is to be invoiced upon contract award of this
construction contract.
The total construction cost estimate is detailed in Table 2. The post tender project budget is detailed
in Table 5.

                                                                                                Page 14 of 18

Section 15

SPECIAL MEETING AGENDA                                                                  1 DECEMBER 2021


 Noosa Parade Corridor Upgrade                  21/22            22/23 Budget     Total Project Budget
                                                Budget                            including previous years
 Pre-Tender                                     $1,847,167           $3,900,000                    $6,000,000
 Post Tender                                    $1,847,167           $3,900,000
                                                                                                   $8,087,225
 Savings identified in 22/23 Capital Bridges Program                 $2,000,000
                                      Table 5. Post tender project budget

Risks & Opportunities
 Finance Risks                      Mitigations
 Final contract value exceeds       Investigations related to subsurface conditions (groundwater and
 allocated budget                   earthworks materials) have been included in contract to reduce the risk
                                    of variations during the works.
                                    Extensive scoping of works under contract contains provisional items
                                    and quantities to reduce the risk of variations during the works.


 Time Risks                         Mitigations
 Delays affecting the main civil    Wet weather allowance to program have been included in the contract
 contract                           documents.
                                    Bellwether’s program shows completion prior to the 2022 Noosa
                                    Triathlon Multi Sport Festival. Coordination and engagement with these
                                    key stakeholders is part of the project’s scope of works.


 Workplace Health and Safety        Mitigations
 Risks
 Bellwether fails to ensure the     Bellwether is to be appointed as Principal Contractor under the
 work is undertaken safely and in   Queensland Work Health and Safety Act 2011.
 accordance with standards
                                    Prior to commencement of construction, Bellwether’s management
                                    plans, Safe Work Method Statements, Risk Assessments, and other
                                    documentation will be submitted for review and approval by Council.
                                    Council will undertake surveillance, regular safety audits and
                                    inspections throughout the construction works.


 Resource Risk                      Mitigations
 Scope, quality, safety, budget,    Bellwether have nominated a highly capable team for the project with
 and program are affected due to    backup personnel as required.
 resource/material shortages
                                    Council can utilise internal resources to attend inspections if required.

Consultation
External Consultation - Community & Stakeholder
Council has undertaken extensive community and stakeholder engagement during the design and
development phases of the project. Consistent key messaging, community information sessions and
meetings with stakeholders and impacted property owners have occurred in the months leading up
to the award of this contract.
Communication with TMR as the grant sponsor is occurring with opportunities for joint-messaging
and media events being planned.



                                                                                               Page 15 of 18

Section 16

SPECIAL MEETING AGENDA                                                                     1 DECEMBER 2021


Internal Consultation
        Infrastructure Services (Director, Civil Operations, Asset Management, Infrastructure
         Planning, Design and Delivery)
        Environment & Sustainable Development (Development Assessment, Strategic Land Use
         Planning)
        Corporate Services (Procurement, Property)

Departments/Sections Consulted:

        Chief Executive Officer           Community Services                      X   Corporate Services
        Executive Support                 Director                                    Director
                                          Community Development                       Financial Services
                                          Community Facilities                        Fleet
                                          Libraries & Galleries                       ICT
                                          Local Laws                              X   Procurement
                                          Waste & Environmental Health            X   Property
                                                                                      Revenue Services

    X   Executive Services            X   Environment & Sustainable Development   X   Infrastructure Services
        Director                          Director                                X   Director
        Community Engagement              Building & Plumbing Services            X   Asset Management
        Customer Service              X   Development Assessment                      Buildings and Facilities
        Governance                        Economic Development                    X   Civil Operations
    X   People and Culture (Safety)       Environmental Services                      Disaster Management
                                      X   Strategic Land Use Planning             X   Infrastructure Planning,
                                                                                      Design and Delivery




                                                                                                   Page 16 of 18

Section 17

SPECIAL MEETING AGENDA   1 DECEMBER 2021




                                           Page 17 of 18

‘Atachment No.1 - Final Evaluation
    NOOSA SHIRE COUNCIL _ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
          ell SE                                                                                                                ESS                                            a aS                        Ez
      el                          |                                                                                        le
   [centoraing and Anarnate Tenders Oxy                     2               2                s                ‘                s                e                ?                .               >                2»               u                a
   |austratan Business Numbes (ABN)                    5? 381 20087    45 O87 tam) 423
         of Tenderer (Respoedent)                       Radha er       awed Corcrete
     per Respondent Details ABN                      Contractors Pty itd | Comtruction Pty Usd
   [bate of submission as per VendorP ane!              19-Oct-21        19-Oct-21
   [business Registered Address (Cty/State Onty)       Brhbare, OLD      Coorey, GLO
    fendered Price (Exc! GST)                        $   6,739,146.26)$   4459,905.95 | $          -
    fendered Price (Incll GST)                       $   7,413,06089/$    4,905,89655
   [corrections /Cartiations (Ex! GST)               $               $            .
   [conforming or Alternate                           Crtomnng         Conforming:
   |aternate Price Adjustments (Exc! GST)            $
       (Exel GST) After Corrections / Clarifications
   sand ARematal                                     $   673014626 5      4 459,905.95
        Valance % fren Lowest Price                      Si                O0N
        ve                                          a
       Variance from Median                          $    4,139,62045 $   1,139,62015
        ‘Variance % from Median          20%              2K               1
           vm)                                            Yes               Yes
                                                        Behera        Everd Conerete
               SORTA: Sen atten clement,             Contractors Py Ltd Construction Pay bt
   fron ier                          Weighting (%)    went ome         Weghend Sears    emp    oe        Weathers kore    emgtont score    Weathers Score   ergtent keane    wompons score    emg   wom       wegen Soars      Wagan Seow       Wengen Scone
   [Capability and Resourcing           20%              15.69             1159             0.00             0.00            0.00             0.00             0.00              00              0.00              00             0.00              00
    [Contract Experience and Capacky     19%             12.00             750              0.00             0.00             0.20           0.00             0.00               00              0.00             00              0.00              000
    |retnodotogy                        15%              1256              758              0.00             o.oo             0.00            0.00             0.00              00              0.00             00              0.00             000
    fouaiey                                x             400              3.00             aco               0.00             0.00            0.00            0.00              000              0.00             00              0.00             000
    [cain BSatety                         *               5.00            405              aco               a0               0.00            0.00            0.00               00              0.00           a0                0.00              00
    Contritution to Local Economy         o*             aso               5.00            aco              0.00             0.00             0.00            0.00               00              oo             a0                0.00              00
     [otal Technical Score                ox             43.85           38.72             000             000              a20               0.00             0.20             0.00             0.00             0.00            0.00              000
               a
                  PARTE. Price element               «        farts  10        Partsd
     jotad Fees (Pe)                     ssn         $6,739,146.25     $4,459,905.95
   [price Scare                                            =              20                 °                o                o                o                0                o               o                °                0                °
   |nermatsed Price Score ia)                              «              100                °                o                o                o                0                o               o                °                0                °
 feted Price Score Pw)                                   2216             35.00
          Total Score of price and non price elements    e816              48
Loewe
            The Aarument Rin! confirms thy stow oun and weighing of ths evskaten and confirm fhe eulustan as Bren conduitnd im airordance with the Pracarement Protty Alar
    |               Assessment Panel                                   Position Title                                      Sgnature                     |
      Evaluation Panel Quair & Assesment Panel Member 1    Contracts and Project Superintendent (GB)   se     Poanahat
                ‘Assesment Pavel Member 2                 Consultant - Auxiium Consulting Pty Lid (J8) e                    <
    |           Assesment Panel Member 3                    Workplace Health & Safety Officer (DC)    +4              eee         ee                    |
    |           Assesonent Panel Member 4                       Designer - Capital Works (Bt)         x         Bot Na Cher                             |
                                                                                                                   =                  y
                Asseienent Panel Member S                                                             x
                                                                                                                                                                                                                                                                       Page          17 of 18

Section 18

SPECIAL MEETING AGENDA   1 DECEMBER 2021



3.   MEETING CLOSURE




                             Page 18 of 18

SPECIAL MEETING AGENDA                                      1 DECEMBER 2021

3.    MEETING CLOSURE

                                                                  Page 18 of 18

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.